Loading...
HomeMy WebLinkAboutBLD04-175Waterman & Katz Building 181 Quincy Street, Suite 301 PoR Townsend. WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDO4-175 Issued: 07/02/04 Parcel Number: 985 800 603 Job Address: 625 S Street Zoning: RR_II Type: VV=N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct 2 stare unheated shonlof£ice. Owners: Jerome "Jolly" L. Wahlstrom Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 A Revision to this permit is required if space will be heated by a source other than a kiln REOiIiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Interior Footings Forms Reinforcement UFER GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Permit p BLD04-175 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts i Holdowns SLAB Interior Footings Anchor Bolts Reinforcement PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground Licensed Plumbing Contractor's Signature & License Number: Sign here iVIECHANICAL Kitchen/Bath/Laundry Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Permit # BLD04-175 REQUIRED INSPECTIONS APPROVED/DATE FRAMING Prescriptive & desiened braced wall panel sheathing & nailing must be inspectedprior to cover Floor -Engineered BCI floor plan on-site and available to the Inspector at inspection time Walls Shear Walls Ceilings Posts, Beams & Headers Roof Ridge Beam Blocking Roof Roof Venting - eave and ridge vents Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21 Ceiling (R-30vault/R-38 attic ) Vapor Barrier: paint for walls and ceiling Baffles DRY WALL NAILING Walls Ceiling FINAL Public Works Sign-Off House Numbers - 5" minimum Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Stairs, Decks & Landings Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pemn[ # BLDO4-175 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 385-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 OfQppTTOkh~m CITY OF PORT TOWNSEND PUBLfC WORKS & - DEVELOPMENT SERVICES DEPARTMENT 9~~FWPSM~U~ INSPECTION REPORT PERMIT NUMBER: Address Contractor Owner L 1%L~-- S G~~~ Gi S C~~//~Cr ~~ r ~ ~w~~ ~~ 1 s ~ ~~-, Date of Inspection 3~7~~--3.~„. ^ Plumbing/Top Out ^ Drywall/Fire Wall Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Propane TanklLine ^ Manufactured Home Set-up ^ Mechanical ^ Public Works Framing ^ Other/Consultation ~ Insulation Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER Foundation Walls ^ Slab Interior Footing/Insulation Groundwork/Plumbing Test ^ Underfloor Framing ^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be ass ssed for multiple re-inspections. For Re-inspection, call Inspection Messa Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED B BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION APPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved Inspector :ard must be on-site and available at time of inspection. ~ ~I _05 Date v °``°Ar'°whs~= CITY OF PORT TOWNSEND PUBLIC WORKS ° DEVELOPMENT SERVICES DEPARTMENT 9 ~ U40 ~°Fw>5M`' INSPECTION REPORT PERMIT NUMBER: Address ~ ~~ S ~~ ;f~'~ Contractor L~~~;b~ Owner Date of I Worksite or Celi Phone# ^ Erosion/Sedimentation ~Qr/n Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test ^ Underfloor Framing ^ Shear Wall/Holdowns 3 ~-r 33 6Z ^ PlumbinglTop Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Mechanical ^ Public Works Ca Framing Insulation ^ Interior Shear/BWP Nail Other(Consultation ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED SY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION ~PPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved p any Inspector _L and permit card must be on-site and available at time of inspection. Date _~~~ °~'°p"°'~hsm CITY OF PORT TOWNSEND PUBLIC WORKS U BUILDING AND COMMUNITY DEVELOPMENT s-_ ~ :. _ 9~OFWASM~°~ INSPECTION REPORT n ..,. ~ , . , ,, ^- PERMIT NUMBER: Address Contractor Owner Date of Inspection ,~ Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/FootingsJUFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ~r~;,, ~ Groundwork/Plumbing Test (tni'S ^ Underfloor Framing ^ Shear WalUHoldowns ~- _~ -, ^ Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ~ Propane Tank(Line ^ Manufactured Home Set-up ^ Mechanical _] Framing Insulation ^ Interior Shear/BWP Nail J Publlc Works J Other/Consultation ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:D0 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION }'APPROVAL ^ CORRECTION REQUIRED Approved plans and permit card must be on-site and available at time of inspection. S~; Inspector - _ __ _ Date