Loading...
HomeMy WebLinkAboutBLD04-143Waterman and Katz Building l81 Quincy Street, Sui[e 301 Port TOwvsevd, NA 98368 Phone:(360)379-3208 Aax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 For Inspection Permit Number: BLDO4-143 Issued: 06/03/04 Parcel Number: 984 602 004 Job Address: 309 Cosgrove Street Zoning: RR=II Type: V-N Occupancy: RR3 Total Occupant Load: N/C Nature of Work: Add 10' x T deck and patio door Owners: Ian and Lois Groves Trustee Contractor: Little and Little Lic#LITTLLC15765 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit- Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Joists Blocking Positive Connections FRAMING Header Walls & Ceiling Windows -safety glazing Window U-factor - 0.40 or better NFRC sticker must be on windows at time of inspection Air Seal Weather Resistive Barrier DRYWALL NAILING Walls Ceiling FINAL House Numbers - 5" numbers Smoke Detectors-update existing structure for smoke detectors per '97 UBC Decks & Landings Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Perndt #BLD04-143 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final ins ection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 °`'°q"°""~s,~ CiTY OF PORT TOWNSEND PUBLfC WORKS ° BUILDING AND COMMUNITY DEVELOPMENT 9 ~i.; ti0 ~°~w>~~~° INSPECTION REPORT PERMIT NUMBER: Address Contractor Owner Date of Inspection `~/ ~ /~ Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test ^ Underfloor Framing ^ Shear Wall/Holdowns C~~ ~0,4 S'~ . ~ LO f ^ Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Mechanical LI Public Works Framing ^ Other/Consultation f?] Insulation Interior Shear/BWP Nail ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED By BUILDING AND, IF APPLICABLE, PUBLIC WORKS. VIOLATION APPROVAL ^ CORRECTION REQUIRED _ ~t.~Jb ~ - / ~-f 3 `~ n ~ ~.os c rave .5~. -V-r~i C's7~-~~^FS Approved plans and permit card must be on-site and available at time of inspection. Inspector _ ~'~ f' 1 _ _ Date _ 1 ~ ~ ~ `' _