Loading...
HomeMy WebLinkAboutBLD04-135Waterman & Katz Building Iel Quincy Street Suite 30l Port 7ownsevd, WA 98368 Phone (360) 379-3208 Fax (360) 385-7671 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI.D~4-135 Job Address: 925 Water Street Issued: 05/20/04 Parcel Number: 989 700 903 Zoning: C=III Type: VV=N Occupancy: R-1/A-3 Total Occupant Load: No Change Nature of Work: Reulace two vertical posts in stairwell leading to beach. Owners: Jeffrey & Helen Fraychineaud Business: The Belmont Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF(liTiRFT1 iNCPFf TinNC APPRnVF,A/AATF, STAIR FRAMING All framing members to be pressure treated or wood of natural resistance to decay Posts - 6 x 6 FINAL Building Numbers posted (minimum 5") Guardrails Handrails Landing Stairs -Final Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Pemtil # BLD04-135 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once constriction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Deaartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the Held. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2