CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number:'jBLDO4-l I9R-1 Issued: 03A6-2006
Job Addre~i~3<5-84'h St. Zoning: R-I
Occupancy: R-3tU Total Occupant Load: 2
Nature of Work: Construct accessory dwelline unit above detached earaee
Owners: Joe & Bonnie Greenlee Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Type: VV=B
Parcel Number: 936-902-401
*** Aff elements of engineering including hofdowns, framing, nailing and other engineering connections require
inspection prior do cover. ***
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS-SLAB
Setbacks N - 20' FROM 54"i, S - 20' FROM P2, E - 10' FROM
HILL ST., W -5' FROM P/L.
Forms
Footings
Reinforcement
Anchor Bolts & Washers
LIFER
FOOTING DRAINS (1105 UPC -section 1101.5)
Must discharge at grade to approved location, independent ofroof
drains
PLUMBING:
Rough-ln (D-V-T & Clean outs)
Water Supply
Water Hammer Arrester
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint- strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6"-24" above ground
Licensed Plumbing Contractor's Signature & License Number:
Sign here
Per
FLOOR FRAMING - PRIOR TO COVERING
Joists
Hangers
Blocking
Positive Connections
Hold downs
MECHANICAL
Whole House Fan
KitchenBath/Laundry Fans
Environmental Air Exhaust ducting (w/back drab dampers), insulation
(R-4) and terminus (located 3' from openings)
EXTERIOR BRACED WALL PANELS - TO BE INSPECTED &
APPROVED PRIOR TO COVERING
FRAMING -all members and connections require inspection prior to
cover
Fasteners hangers etc in contact wish treated material must be hot
dippedgalvanized
Walls
Ceilings.
Posts, Beams & Headers
Roof
Trusses
Truss Clips
Blocking
Roof Venting - eave and ridge vents
Windows -egress
Safety Glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on window, skylights, & doors at insp.
time.
Fresh Air Intake Doors U-factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30
Walls (R-~
Vaulted Ceiling (R-30)
Vapor Barrier: paint for walls and ceiling
Baffles
PUBLIC WORKS FINAL
Public Works Sign-Off
FINAL
Parking -1 space required ~~,,
House Numbers - 5" minimum
Plumbing
MechanicaUHeating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Permi, q HCDOS~i09
GFN Ai. CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license.
Failure to provide proof of this documenta5on prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-
2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete, Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correc[im of any and all deficiencies noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass dual inspection on your project until Public Works requirements have been completed and
inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works agoroval must be
received prior to scheduline the Buildine Deoartment's final inspection
7. Final Inspectims are required prior to occupancy; A CertiScate of Occupancy is required for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within
one yeas Call for at least one inspection per year to keep your building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making
changes tq the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
-~ //
~~ 1[E.¢+n41. ~~(° ~5 ~~
APPLICANT SIGNATU ~ DATE
• •
Waterman & IWtz Building
18l Quincy Street, Suite301
Port Townsend, WA 98368
Phone: 360.379-5086 Fax 360485-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO4-119 Issued: 03/06/2006 Parcel Number: 936-902-401
Job Address: 735 - 54th St. Zoning: R-I Type: VV=N Occupancy: RR_3
Total Occupant Load: 4 Nature of Work: Construct 5IP Sinele Family DwellinE
Owner: Joe & Bonie Greenlee Contractor: Owner
GENERAL CONDITIONS APPLY: See last pane
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks - N - 20' from 54~', S- 20' from p/l, E -
10' from Hill St., W-5' from P/1
Footings
Forms
Reinforcement
Hold Downs
Interior Footings
Porch/ Deck Footings
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Girders to Foundation Wall
Hold Downs per architectural design
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
•
• Building Permit#BLD04-119
RF(1TTTRF.TI TNCPF,CTTnNS APPROVED/DATE
FLOOR FRAMING
Engineered I joist plan to be onsite for floor framing
inspection
Joists
Beams
Posts
Solid Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
Hold Downs per architectural design
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Raise source of ignition min. 18"
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
Licensed Plumbing Contractor's Signature & License
Number;
Sign here
MECHANICAL
Heat Pump- manufacturers installation instructions to be
onsite at time of inspection
Source Specific Exhaust Fans @ bathrooms (SOcfm),
laundry room, (50 cfin) and kitchen (100 cfm)
Environmental Air Exhaust ducting (w/ backdrafr
dampers), insulation (R-4) and terminus (located 3' from
openings)
Whole house fan
Woodstove
FRAMING -SIP PANELS
Walls
Engineered Braced Walls- per architectural design
Hold Downs per architectural design
Trusses- en ineerin to be onsite or ins ection
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
•
• Building Permit#BLD04119
Rafters
Collar Ties
Joists
Positive connections
Attic venting -eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal
Fresh Air Intake -window/wall ports
Fire blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21
Ceiling (R-30, vaulted)(R-38, trusses)
Baffles
Vapor Barrier -Low Perm Paint
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
Mechanical
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
GENERAL CONDITIONS
• Building Penni[NBLD04-119
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS P/'ERMIT ON-SITE WITH THE APPROVED PLANS.
~i.~ l ,£ti.k~ L.-, ~ ~t9(~
APPLICANT SI ATU DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
oFpoer royya CITY OF PORT TOWNSEND
o DEVELOPMENT SERVICES DEPARTMENT
~-,:z s; INSPECTION REPORT
For inspections, call the Inspection Line at 360385-2294 by 3:00 PM the day before you want
~~
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: ~ PERMIT NUMBER: ~~t•Qf1`{ - ~ I
SITE ADDRESS: ~ 3S > `~~
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION: ~ ~~ ~ R
~,
i
., ~lf~z:
;.
a._
7 APPROVED ~ APPROVED WITH ~. NOT APPRO~~D
CORRECTIONS
Ok to proceed. Corrections will be Call for re-inspection before
ecked at next inspection proceeding.
Inspector _ - Date ~ ~`~$ ~D
Approved plans and permit card must be on-site and available at dime of inspection. Are-1nrpection fee rnav
be assessed if work is ~aot ready for inspection.
~oFpoarroky~ CITY OF PORT TOWNSEND
~ ~ DEVELOPMENT SERVICES DEPARTMENT
-~~ r: INSPECTION REPORT
~-
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
~¢
the inspection. For Monday inspections, call by 3:00 PM Friday.
1 ~ ~ _ 1.:.
DATE OF INSPECTION ` ~ ~~~ PERMIT NUMBER: + ~ G ~ ` +
SITE ADDRESS: "' " ,
PROJECT NAME: i ~ !.- ~ ~. ~-' "` CONTRACTOR:
CONTACT PERSON: ~ PHONE. + a.. P' "~ ~
.~ _
TYPE OF INSPECTION: ~ ~ ~ ~~~
',:
,;
__
C APPROVED C .4PPR0~'ED ~4ITH C NOT APPROV"ED
- CORRECTIONS
- _.-- - Ok to proceed. Corrections will be Call for re-inspection beforc
checked atoextinspection proceeding.
+ ~ ~
. _ _-'
Inspector "' ~_, Date
Approved plans and permit card must be an-site acid mailable at time of inspection. A re-inspection fee may
be assessed 'work is not r-eady.Jor~ inspectdan.
~ • ~ m. ~~s
of°°"'rO~y CITY OF PORT TOWNSEND
~~ DEVELOPMENT SERVICES DEPARTMENT
..£;
• INSPECTION REPORT
'~ `
~¢wp For inspeclions, call [he Inspection Linea[ 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM FriJdlay.
DATE OF INSPECTION: (p ` ~ ~ ~ ~-P~/ER2b11T NUMB~E{ R•1~jL,~ Q ~1 ~ ~ q
SITE ADDRESS: / ~ J ~ l~ "Y
PROJECT NAME: ~ CONTRACTOR: A
CONTACT PERSON: '--_~~- PHONE: •.7 d- $~b~ ~ S ~~8
TYPE OF INSPECTION: ~~-~~-f' 1'1'l~~J(~.,I ~ ~ `"
~ _ ~ _
--;
~~
~
~ ~
',
~` c
'. ~
1
/A ---
r~ L-'~
,, :~ -
- _ _ C
i~ --
,,
:,t ~ i
T ,~ , 1,
~; --
G APPROV"ED ^ APPROVEll WITH J NO'I APPROVED
CORRECTIONS
Ok to proceed. Corrections will Ike Call for re-inspection before
checked at next inspection proceeding.
Inspector ~ ~ ~ Date
Approved plans andpermit card must be on-site and availahle at tune of inspection. A re-inspection fee may
be assessed;fwork is not ready for inspection.
I'"~--
o4pOp7rOwy~, CITY OF PORT TOWNSEND
o DEVELOPMENT SERVICES DEPARTMENT
~;.
""'• INSPECTION REPORT
~¢w
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: ~.. G~ ~yPERMIT NUMBER: ~~L.,I~ (;~ - ~ ~ q
SITE ADDRESS: (3.~ ~~'~' `C~{-{-
PROJECT NAME: ~rQ,PXI ~ P_\l CON-TRACTOR:
CONTACT PERSON: ~ ~ JD P_ PHONE:
TYPE OF INSPECTION: ~D C)'~"L l7 G '
_ ,,- ..
^ APPROVED ^ APPROVED N-'ITH ^ NOT APPROVEll
CORRECTIONS
Ok to proceed. Corrections will be Ca0 for re-inspection before
checked at next inspection .proceeding.
Inspector4 Date
Approved plans and permit card mz~st be on-site and available of time of mspeclion. A re-inspection fee may
be assessed ijtivork is not ready for inspection.