Loading...
HomeMy WebLinkAboutBLD04-114~ # ~ Fred Slota • From: David Herrington [dherrington@ptsd50.org] Sent: Thursday, April 08, 2010 3:06 PM To: Fred Slota; Tom Opstad; Scottie Foster Cc: Carrie Ehrhardt; Tanya Rublaitus Subject: Auto lift in High School Shop Mr Slota: This note is in regards to the open permit for the installation of the auto lift in the High School Shop azea. I would like to request that the permit be closed as we have sold the auto lift and it is no longer used by the High School. The lift was bought by North Olympic Peninsula Skills Center; If you have any further questions please do not hesitate to give me a call. Thank you for your attention to this matter. David Herrington Manager of Facilities Services Port Townsend School District #50 360-379-4513 dherrin tg on(aptsd50.ore ~_~ - 1 ~ ~~~~ ~~ ~~' T . ~~ ~~~ V ~~ s ~ ~~ - ~ ~~ ~~~a'`~ QORTTpw >~ "sF CITY OF PORT TOW~EN~PUBLIC WORKS ° DEVELOPMENT SERVICES DEPARTMENT NA ~'J.. O Fpr wasH`~ '" - ~ U` INSPECTION REPORT PERMIT NUMBER: ~ L- ~~ C~ `~ ~ r ~ `f ~~ fA.~'~'~ Address .~ ~ ~~) cg H S G~.~U~ ~- ~I1 ~' l~ '' ; ~- L Contractor I ~,, ~a l~' Owner ~~J Date of Inspection n t. ~~_ L Worksite or Cell Phone# 5V ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER E '~~`~' ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test Underfloor Framing ^ Shear Wall/Holdowns ~~~1-y~~ Plumbing/Top Out Gas Pipe/Pressure Test J Propane Tank/Line Mechanical ^ Framing Insulation Interior Shear/BWP Nail fi~S~. f ~ Drywall/Fire Wall ^ Gas/Wood Appliance ^ Manufactured Home Set-up ~ Public Works /her/Co/nsultation J %7 ~-1:17 (I ~ f ~ / (~-+-~-N ^ FINAL S If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION ^ APPROVAL U CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved plans and permit card must be on-site and available at time of inspection. t .S c-h ~ ~, I !~ . s~ Inspector __ __.____ __ __..__ Date e~ i, ' C'~~r~ OfpORiTON,~* ~TY OF PORT TOW~EN UB C WORKS ~~~(~ p° BUILDING AND COMMUNITY DEVELOPMENT 9 ~, .. ti ~~FWPSH~~U INSPECTION REPORT PERMIT NUMBER,:/ [ ~'~f~~~~~ ~;,r.~ Address 4'~~ ~l c~ .~, ~- ll~~~' .C~:f" ' /```'~ ,<°r e Contractor /-5L'~-~ ~"~ i~"~E~~~ ~r f Owner ~ ~~ ~? k.s f L, ~ :1.~~,~ ~_ - ~i«fu~- :~f~k c ~t~`c t ' ~~ Date of Inspection //rl~rL~~~ f~c'° ~/ ~~~~.z~~ 6' Worksite or Cell Phone# 4' ~~ "~}'~''f' ~J ^ Erosion/Sedimentation 'Setbacks ootin s FER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork(Plumbing Test Plumbing/Top Out ^ Gas Pipe/Pressure Test ^ Propane TanWLine Mechanical ^ Framing ^ Insulation ^ Drywall/Fire Wall ^ Gas/Wood Appliance ^ Manufactured Home Set-up Public Works ^ Underfloor Framing ^ Shear Wall/Holdowns ^ Other(Consultation ^ Interior Shear/BWP Nail ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION '^ APPROVAL ^ CORRECTION REQUIRED Approved plans and permit card must be on-site and available at time of inspection. / `' ~ Inspector f ~~~~ _ Date 1 ~ C ~- Page 1 of 2 Sheila Spears From: Sheila Spears Sent: Wednesday, April 07, 2010 1:49 PM To: Michelle Sandoval Subject: RE: City of P7 Meetings Update 04/07/2010 -final Attachments: Langley.TermExipration.050110.doc I sent letters last week to those whose terms expire May 1. They need to reapply to be considered. I asked for response by April 12 so that appointments could be made first meeting in May. I will attach a sample letter that went out. Following are the terms that expire and/any unfilled vacancies: Arts Commission Ul~~~ nGFYPq~j~y (3 Positions) Nancy Rody, herry Kac nd Counsel Langley. Counsel chooses not to reapply. Design. Review Advisory Committee (1 Position) Gary Kennedy Historic Preservation Committee (2 Positions) Marsha Moratti (has already reapplied) and Rosalind Russell ~" Libras Advisory Board (1 Position) Bill Maxwell v LodgngTax Advisory Committee ~ "~ ,i (5 Positions) Will O'Donnell, Dave Robison, Steve Shively, Cindy Finnie and 1 vacant collector position. Non-Motorized Transportation Advisory Board v /va (3 Positions) Andrew Reding (has reapplied), Pat Teal and Jolly wahlstrom f?lanning Commission Terms expire December 31 - but we currently have 2 unfilled vacancies. From: Michelle Sandoval Sent: Wednesday, April 07, 2010 12:59 PM To: Sheila Spears Subject: RE: City of PT Meetings Update 04/07/2010 -final Hi Sheila Would you please give mean update on what committees positions are open/ vacant (or soon to be as we recieved a letter from Counsel Langley) and who is outstanding in terms of application and may need appointments( besides Eric Kuzma) thank you. Michelle michelle Sandoval mayor port townsend, Washington 360.385.9344~.vork 4/7/2010 Waterman & Kah Builtling 181 Quiacy Street, Boile 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 3fi0.38S7675 s a CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO4-114 Issued: 06/07/04 Parcel Number: 931 403 001 Job Address: 450 Fir Street Zoning: P_I Type: N/C Occupancy: N/C Total Occupant Load: No Change Nature of Work: Pour structural slab for car lift Owners: Port Townsend School District #50 Contractor: owner GENERAL CONDITIONS APPLY: See Last Page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 Special Inspection required for 3000 psi concrete mix design The Contractor shall be Washington State Recognized by WABO for Speciallnspections All test results shall be submitted to BCD for ftling REQUIRED INSPECTIONS APPROVED/DATE CONCRETE SLAB -per engineering for L421 car lift Forms Reinforcement Minimum 4 inch thick slab -field verify 3000 psi concrete mix design -Special Inspection Required Underground air and electrical supply -protect from direct contact to concrete FINAL Building Numbers - 5" numbers Verify Slab Joint Specifications in Engineered Drawings Ramp/ Railings Final -building CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #04-114 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building_Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. CaB for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2