Loading...
HomeMy WebLinkAbout94-069RESOLUTION NO. 94- ~ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND AUTHORIZING THE MAYOR TO SIGN A PROFESSIONAL SERVICES CONTRACT WITH POLARIS ENGINEERING AND SURVEYING, INC. FOR DESIGN AND CONSTRUCTION ENGINEERING SERVICES TO EXTEND THE LITTLE QUILCENE RIVER TO LORDS LAKE WATER TRANSMISSION PIPELINE. WHEREAS, the City Council adopted Engineering Services funding as part of the 1994 budget; and WHEREAS, the Surface Water Treatment Rule (SWTR) requires watershed control and maintenance of source water quality; and WHEREAS, the City has investigated the qualification of Polaris Engineering and Surveying Inc. and finds that they are qualified to perform the services required, and has found their past services to the City to be satisfactory, N O W T H E R E F O R E BE IT RESOLVED that the Council hereby authorizes the Mayor of the City of Port Townsend to sign a professional services contract with Polaris Engineering and Surveying, Inc for the preparation of construction plans, field staking, construction inspection, and as built plan preparation for an extension of a 20 inch water transmission pipeline and energy dissipator device on the water supply pipeline from the Little Quilcene River to Lords Lake. Adopted by the City Council of the City of p~the Mayor this 2nd day of May, 1994. _ /- ~. d~v.~.~ ATTEST: Mayor John M. Clise David A. Grove, City Clerk APPROVED AS TO FORM: