Loading...
HomeMy WebLinkAboutDELETEr City of Port Townsend Building & Community Development — Permit Center Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 379-6923 CERTIFICATE OF OCCUPANCY Building Permit Number: BLD97-00146 Owner: Hearthstone Group Location: 3300 San Juan Avenue Use(s) Permitted: R-1 (Residential), A-3 (Assembly) & B (Business) The above -referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied in the use and manner indicated above. 7 --.Approved: Date: Ro Sears, ding Official City of Port Townsend Building & Community Development Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 (360) 379-3208 Fax: (360) 379-6923 MEMO November 16, 1998 To: C.L. Flint From: Jeff Randall Re: San Juan Commons; LUP 97-15 CITY H 1891 I have inspected San Juan Commons and all the planning related conditions have been satisfied. Additional landscaping was installed recently and the landscaping now in compliance with the approved plan. Sincerely, CITY Of PORT TOWNSEND 181 Quincy Street, Port Townsend, WA 98368 360-379-3208 Fax 360-379-6923 TEMPORARY CERTIFICATE OF OCCUPANCY September. 30, 1998 through January 1, 1999 Building Permit No.: BLD97-00146 Owner: Hearthstone Group Address: 3300 San Juan Avenue Location: Port Townsend, WA 98368 Use(s) permitted: R-1 (Residential), A-3 (Assembly) & B (Business) The above -referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied prior to completion and final inspection without substantial hazard, and is hereby granted this Temporary Certificate of Occupancy, provided substantial progress is being made toward completion and final inspection is passed by the date entered above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the building official. Approved: _ �• f Building Official Complete Remaining Items for Final BUILDING DEPARTMENT CONDITIONS 1. Complete parking per plans. 2. Install grab bars in accessible restrooms. 3. Insulation certificate. 4. Install handrail 2d -floor mezzanine. 5. Complete fireplace in Commons area. FIRE DEPARTMENT CONDITIONS 1. Complete curb painting at fire hydrant. 2. Install fire extinguisher tags. 3. Install as built plans box in mechanical room. Date SEPA MDNS CONDITIONS 1. Final approval of landscaping per approved landscape plan by BCD. 2. Final approval of parking lot layout as per approved parking plan. 3. Final approval of the exterior lighting system (modified as agreed); and review of pole mounted 1/2 lights for compliance with SEPA performance standards. 4. Final approval of multi -family design review by BCD. 5. Submission and approval of sign permit application by BCD for monument sign and approval of downward pointed lighting on top of sign (if sign is to be lit.) 6. All exterior service elements shall be screened and landscaped (garbage receptacles, utilities, mechanical equipment) per landscaping and parking plans. PUBLIC WORKS CONDITIONS 1. An approved bacteria test for the looped public water line serving Lots 1-4. 2. All maintenance holes, catch basins and pipes must be grouted, cleaned and free from debris. 3. Provide final record drawings certified by your engineer. JEFFERSON COUNTY ASSESSOR'S OFFICE 1. Deed exchange after final plat approval to correspond ownership with short plat lot legal descriptions (legal descriptions of land prior to short plat differed) — provide copies of recorded deeds to BCD. cc: Jeff Randall, Planner Tom Aumock, Fire Marshall Alex Angud, Public Works Inspector File 2/2 04 QoaT r�hti DEPARTMENT OF PUBLIC WORKS A. ENGINEERING- WATERMAN & KATZ BUILDING ` 1 8 IUINCY STREET SUITE 201 Q , PORT TOWNSEND, WASHINGTON 98368 (360) 385-72 12 (360) 385-7675 FAX September 15, 1998 LBR Construction 618 S. Peabody Suite 11 Port Angeles WA 98362 Dear Bob: Subject: San Juan Commons We received your letter dated September 14, 1998, regarding a Certificate of Occupancy for San Juan Commons. We remind you that the water system looping must be completed before our Public Works sign -off on the infrastructure and street development permit will be processed. Other punch list items prior to Public Works approval are: Place an asphalt patch in the bike lanes in the road cut at the future north entrance to your site. All maintenance holes, catch basins and pipes must be grouted, cleaned and free from debris. Provide final record drawings certified by your engineer. If you have any questions please feel free to call Alex or me. P e r HL - City Engineer cc. Rob Sears C.L. Flint Jeff Randall Tom Aumock Alex Angud