Loading...
HomeMy WebLinkAboutBLD04-267Waterman and Katz Building 181 Quincy Street, Sai[e 3U1 Port Townsend, WA 98368 Phone: (360) 379-3208 Pxx: (360) 385-7(175 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca1138S-2294 for Inspection Permit Number: BLD~4-267 Issued: 10/21/04 Parcel Number: 936 904 103 Job Address: 5708 Kuhn Street Zaning: R-I Type: V-N Occupancy: R~3 Total Occupant Load: 3 Nature of Work: Convert finished basement to ADU. Owner: Carol Halton & Ralnh McArthur Contractor: Ray Weber -WEBERC*0330D GENERAL CONDITIONS APPLY: See last pale SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF,C1iT>(RF,11 TN~PF,['TInNfi APPRnVED/DATE PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if ~ 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Licensed Plumbing Contractor's Signature & License Number Sign here MECHANICAL Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings). Whole house fan -Bath Ca114$ hours before you dig for utility line locates 1-800-424-5555 Page 1 of 1 Building Permit #BLD04267 RF(1T1TRF,TI TN~PF.C'.TTnN~ APPROVED/DATE FRAMING Prescriptive c& designed braced wall pcrne_l sheathing & nailing must be inspected prior to cover Fasteners, hangers, etc. in contact with treated material must be hot dinned galvanized Walls Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor -- 0.58 or better NFRC sticker must he on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-38, attic; R-30, vault) Vapor Barrier -paint DRYWALL NAILING Walls Ceiling Dwelling unit separation FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing Mechanical/Heating Insulation Certificate Smoke Detectors Final -- building Ca114$ hours before you dig for utility line lacates 1-800-424-SSSS Page 2 of 2 Building Permit #BLU04267 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re istration number and a City business license. Failure to provide proof of this documentation prior to work may result in jab shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections arc required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ~o~QORrroW~~~ CITY OF PORT TOWNSEND PUBLIC WORKS & U DEVELOPMENT SERVICES DEPARTMENT ~~-~-`.`~, o ~~ofiwns~~aG~ INSPECTION REPORT ~~ ,~,._.° ~r~~ \ ~ ~:~~~ A~ " ` PERMIT NUMBER: ~-~ ~~ T 7 ~ Address _ ~ ! ~ ~ - ~ ~ ~ ~"~ Contractor Owner Date of Inspection ~~ '/'4 r.. Worksite or Cell Phone# j~ 0 Erosion/Sedimentation ~~ ^ Setbacks/1^ootings/LIFER ~.,'~ ^ Foundation Walls ~ ^ Slab Interior Footing/Insulation ~~~ L1 Groundwork/Plumbing Test ^ Underfloor Framing lJ Shear Wall/Holdawns U Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Propane Tank/Line ^ Mechanical V Framing ^ Insulation lJ Interior Shear/BWP Nail ^ Gas/Waod Appliance L1 Manufactured Home Set-up ^ Public Works ^ Other/Consultation FINAL ,. ~- If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BU1L AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION PROVAL L1 CORRECTION REQUIRED ^ APPROVED WITH CORRECTION U NEED APPROVED PLANS & PERMIT ON SITE Approved airs and~,,permit card must be on-site and available at time of inspection. ~;~ Inspector ~~~; ~.<. , ~~~~~~.~ r"~ _. _. ~ Date ~ /~ -, ,--,.~ ___~ oFP°R'r°~,~~ CITY OF PORT TOWNSEND PUBLIC WORKS s DEVELOPMENT SERVICES DEPARTMENT ~°FWASH~~`' INSPECTION REPORT PERMIT NUMBER: ~ L-D C~'~ ~' ~C~~ Address ~-~7~ [~ ~~~ ~l In Contractor ~ ~(~ ~b _.,f Owner ~(`~ ~~cl~l Date of Inspection ~ ~ ~ ~ ~~~ ~~.~ Worksite or Cell Phone# C~ ~.~ ~`~~ Gf ^ Erosion/Sedimentation ^ Plumbing/Top Out U Drywall/Fire Wall ^ Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance LJ Foundation Walls L.] Propane Tank/Line ^ Manufactured Home Set-up ^ Slab Interior Footing/Insulation ^ Mechanical U Public Works ^ Groundwork/Plumbing Test ~J Framing ^ Other/Consultation ^ Underfloor Framing ^ Insulation _, ~] Shear Wall/Holdowns ~terior Shear/BWP Nail ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to $:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILD AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION - PROVAL U CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved plans Inspector permit g~glyl must be on-site and available at time of inspection. Date _~ 7~1~~(~ J~ ~~~e0prro~"s~~ CITY OF PORT TOWNSEND PUBLIC WORKS DEVELOPMENT SERVICES DEPARTMENT ~ '.~ _~ _' , ox ~~~~wASN~~~ INSPECTION REPORT PERMIT NUMBER: Address Contractor Owner r ~r~ cti_ z~ ~ s -~o~ l~uti~ SE.~tiast- Date of Inspection Worksite or Cell Phone# ^ Erasion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ 51ab Interior Footing/Insulation Groundwork/Plumbing Test ^ Underfloor Framing ^ Shear Wall/Holdowns `7r7 - L~ Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance Ll Propane Tank/Line !..] Manufactured Home Set-up ^ Mechanical l~'Fra nsulation Cl Interior Shear/BWP Nail ^ Public Works ~..] Other/Consultation ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. F'or Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION PPROVAL C.1 CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved pl ns a permit card must be on-site and available at time of inspection. ~, Inspector _.._ _. . _ _ _ _------.. _.~ _ Date ~ 7_~~- ~-~ 1 f-~ l t'Z~~ ~~