Loading...
HomeMy WebLinkAboutBLD04-241Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 1'hone:(360)379-3208 Fax: (360)385-7675 CYTY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD04-241 Issued: 09/20/04 Parcel Number: 989 704 002 Job Address: Intersection of Taylor and Water_ Zoning: C-III Type: V-N Occupancy: N/A Nature of Work: Erect temporary PVC Inflatable Movie Screen per attached en~ineeredplans Owner: Port Townsend Film Festival Contractor: PT Film Festival (379-1333) GENERAL CONDITIONS APPLY -SEE LAST PAGE OTHER PERMITS REQUIRED: Special Event permit through City Police Department to close Taylor Street for the Port Townsend Film Festival. NOTE: All elements of engineering require inspection. Screen s/tall not block sidewalks, crosswalk, or view of pedestrians canting off the curb onto the crosswalk. *~~* **** RE UIRED INSPECTIONS APPROVED/DATE FRAMING -See also attached Installation Guide Screen shall be lowered at wind speeds above 19-24 mph Per Attached Engineering Ballast - @ 4 points; 185 gallons max., 155 min. Cordon Off Area Inside Anchoring Points FINAL Fire Department sign-off Police Department sign-off Final -building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 1 1'ermil M AL,D04241 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin the Buildin De artment's final ins ection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 3'79-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 ~t ~ ~~(~~ ( n. ~-C.~" ~.~ c ~, ~G~ ~" I iV~~ ". ~~". ~oQORrr°"'~~5 CITY OF PORT TOWNSEND PUBLIC WORKS U ~ DEVELOPMENT SERVICES DEPARTMENT ~~OFWASN~~G~ INSPECTION REPORT .~ ~,~ . PERMIT NUMBER: ~ > ~-- ~ ,: C `- ~ ~ `r i _.- i _. 1 Address ~. ,~~ Contractor Owner - 'f ~ r,.. ~ -~~ ~ ~--,^ ~ < . Date of Inspection ,a ' ~ ~.~ Worksite or Cell Phone# ~~ ^ Erosion/Sedimentation -~"~'~-~. ^ Setbacks/Footings/LIFER 9 ~~ r ^ Foundation Walls (J ^ Slab Interior Footing/Insulation La Groundwork/Plumbing Test ^ Underfloor Framing ^ Plumbing/Top Out ^ Gas Pipe/Pressure Test ^ Propane Tank/Line ^ Mechanical ^ Framing Insulation ^ Drywall/Fire Wall ^ Gas/Wood Appliance ^ Manufactured Home Set-up ^ Public Works V Other/Consultation ^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail y~FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION U APPROVAL CORRECTION REQUIRED lJ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE ® X11] t ~N ~ ~~~ 1< I~~~ Z ~ ~~y~ S~i3~ k Od H wr~1 ~ 2 2.) ~~ Approved plans and permit card must be on-site and available at time of inspection. Inspector ___ .____ __ Date ~~~__