HomeMy WebLinkAboutBLD04-241Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
1'hone:(360)379-3208 Fax: (360)385-7675
CYTY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD04-241 Issued: 09/20/04 Parcel Number: 989 704 002
Job Address: Intersection of Taylor and Water_ Zoning: C-III Type: V-N Occupancy: N/A
Nature of Work: Erect temporary PVC Inflatable Movie Screen per attached en~ineeredplans
Owner: Port Townsend Film Festival Contractor: PT Film Festival
(379-1333)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
OTHER PERMITS REQUIRED:
Special Event permit through City Police Department to close Taylor Street for the Port Townsend Film
Festival.
NOTE: All elements of engineering require inspection.
Screen s/tall not block sidewalks, crosswalk, or view of pedestrians canting off the curb onto the crosswalk.
*~~* ****
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING -See also attached Installation Guide
Screen shall be lowered at wind speeds above
19-24 mph
Per Attached Engineering
Ballast - @ 4 points; 185 gallons max., 155 min.
Cordon Off Area Inside Anchoring Points
FINAL
Fire Department sign-off
Police Department sign-off
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 1
1'ermil M AL,D04241
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin the Buildin De artment's final ins ection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 3'79-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
~t
~ ~~(~~
( n.
~-C.~"
~.~ c ~,
~G~ ~" I
iV~~
".
~~".
~oQORrr°"'~~5 CITY OF PORT TOWNSEND PUBLIC WORKS
U ~ DEVELOPMENT SERVICES DEPARTMENT
~~OFWASN~~G~ INSPECTION REPORT
.~ ~,~ .
PERMIT NUMBER: ~ > ~-- ~ ,: C `- ~ ~ `r
i _.- i _. 1
Address
~. ,~~
Contractor
Owner - 'f ~ r,.. ~ -~~ ~ ~--,^ ~ < .
Date of Inspection
,a ' ~ ~.~
Worksite or Cell Phone#
~~ ^ Erosion/Sedimentation
-~"~'~-~. ^ Setbacks/Footings/LIFER
9 ~~ r ^ Foundation Walls
(J ^ Slab Interior Footing/Insulation
La Groundwork/Plumbing Test
^ Underfloor Framing
^ Plumbing/Top Out
^ Gas Pipe/Pressure Test
^ Propane Tank/Line
^ Mechanical
^ Framing
Insulation
^ Drywall/Fire Wall
^ Gas/Wood Appliance
^ Manufactured Home Set-up
^ Public Works
V Other/Consultation
^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail y~FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION U APPROVAL CORRECTION REQUIRED
lJ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE
® X11] t ~N ~ ~~~ 1< I~~~ Z ~ ~~y~ S~i3~ k Od H wr~1 ~ 2 2.)
~~
Approved plans and permit card must be on-site and available at time of inspection.
Inspector ___ .____ __ Date ~~~__