Loading...
HomeMy WebLinkAboutBLD04-240Waterman & Katz Building 181 Quincy Strect, Suite 3U I Post Townsend, WA 98368 Phune: (36U) 379-32U8 Pax (36U) 385-7675 CYTY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca113$5-2294 for Inspection Permit Number: BLD04-240 Issued: 10/25/04 Parcel Number: 948 334 001 ,Iob Address: 1230 McPherson Street Zoning: R-III Type: V-N Occupancy: U-1 Nature of Work: Construct 672 square foot Pole BuildinE for use as_garageā€¢ Owners: Peter & Christine Shaw Contractor: ACE -- ACECOCE0976PG GENERAL CONDITIONS APPLY -SEE NEXT PAGE RFnTTiRET) TN~PECTT(lNS APPROVED/DATE TEMPORARY .EROSION & SEDIMENT CONTROL See General Condition No 2, install on-site as needed during construction -okay to use existing driveway as construction entrance FOOTING ProLine PakMix or Quikcrete #I10; verify thickness of punch pad after pour prior to post set Setbacks Post Footings -- 24" diameter, 3.5" deep per engineered plans Verify Post Hole Dimension Prior to Pour Punch Pad Reinforcement Forms SLAB Non-structural Ca114$ hours before you dig for utility line locates 1-$00-424-8855 Page 1 of 1 REnUIRED INSPECTIONS APPROVED/DATE Ycm~it # BLD04-240 FRAMING -See attached engineering Posts to be Hem-Fir #1 per engineering. Framing lumber to be Hem-Fir #2 Nails to be hot dipped galvanized, with galvanized Simpson Strong= Tie connectors, and galvanized bolts, nuts, and lag screws. Posts -see engineering Girts - 2 x 6 Purlins - 2 x 6 @ 24" o.c. Joist Positive Connections Bracing Strapping Trusses -pre-fabricated engineered Truss Lateral Bracing Rafters -gable end Blocking Bolts Positive Connection -per engineered section detail Door Windows (if applicable) Siding & Roofing FINAL House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Permit # BLD04-240 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. S. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca1138S-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-S1TE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-SSSS Page 3 of 3 " ~ ~O~QpFTTp~~~F CITY OF PORT TOWNSEND PUBLIC WORKS x U = DEVELOPMENT SERVICES DEPARTMENT ~~~WASH~aG INSPECTION REPORT PERMIT NUMBER: ~ ~ ~ (,'~ ~_~~~ _ Address ~ ~ ~3 ~' C- ~~ ~~~ Contractor ~~ / ~ ~r~ ~.1~ . Owner _ ~'~~ ,~ hc~,.~ ~._..... Date of Inspection ~ ~~I ~Z~ ~~ / _ Worksite or Cell Phone# _ I ~ 2 ~ ~ 2 ~~~ ~ ~ 3 [.,I Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test C! Underfloor Framing ^ Plumbing/Top~Dut ~.] Gas Pipe/Pressure Test ^ Propane Tank/Line V Mechanical ^ Framing ^ Insulation O ^ Drywall/Fire Wall ^ Gas/Wood Appliance V Manufactured Home Set-up ^ Public Works ^ Other/Consultation lJ Shear Wall/Holdowns ^ Interior Shear/BWP Nail FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED B '~UILDING AND, IF APPLICABLE, PUBLIC WORKS. V VIOLATION CrAPPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved plans ~nc~ permit ca be on-site and available at time of inspection. Inspector _~_-_ ~ ~ Date _. ~ /~ ,. ~~ o~QORrr°"'~s CITY OF PORT TOWNSEND PUBLIC WORKS ~g ~ . U ~ DEVE , LOPMENT SERVICES DEPARTMENT ~ -- -- `- 1D 9 ~°~WAS~~~° INSPECTION REPORT PERMIT NUMBER: ~ ~L ° ~ - _ .~ _ I ~~ 3 j ~~~ C ~~'~L~/t f Address ~~ ,rQ ~ Contractor ~. ~'. '~ `. ~ C)~ S~ f ~ C /~-~ C_.L -. Owner .__...-. ~~V (C~,~ ~J ~.-.-.._._. Date of Inspection ~ ~ _W ~".,ter ~~ ._- r C' Worksite or Cell Phone# ~- ^ Erosion/Sedimentation ~ ^ Plumbing/To Out ^ Drywall/Fire Wall ~ Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test v Gas/Wood Appliance ~~ CJ Foundation Walls ^ Propane Tank/Line lJ Manufactured Home Set-up ~~ ^ Slab Interior Footing/Insulation ^ Mechanical _,1 Public Works ~ ^ Groundwork/Plumbing Test ~J Framing ^ Other/Consultation C~ Underfloor Framing ^ Insulation ^ Shear Wall/Holdowns U Interior Shear/BWP Nail ^ FINAL If corrections required, re-inspection must be donprior to covering or concealing areas of construction. Additional fees may be asses for multiple re-inspections. For Re-inspection, call Inspection Messag ine at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY ILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION APPROVAL '-1 CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved I s nd rmit c d ust be on-site and available at time of inspection. -, Inspector .` ~ Date _.L_ ~ ~/ _.--- ---------- . --_ 1 ...______