CITY OF PORT TO'~UNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TH1S CARD MUST BE POSTED AT CONS'T'RUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD~4-237 Issued: 09/21/04 Parcel Number: 94$ 321 002
Job Address: 834 Sheridan Street Zoning: CII-H Type: V-N Occupancy: II=2
Nature of Work: Remove existing roofing on generator room; install metal decking, protection
board, scupper, metal carpet and roofing.
Owners: Jefferson General Hospital
Contractor: Kirtley-Cole - KIRTLCA272RF
NOTE: Roofing materials to be installed per manufacturer's specifications and IBC Chapter 15.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jeffersan
County Landfill or other location in accordance with
all local, state and federal laws.
ROOF
Decking -per engineer design.
ROOFING
Install all roofing material
Parapet flashing -per engineer design
FINAL
Final -Building '
~ ~ `~~ ~ °~``_ ~~/'~c'S l ~; ~~
Ca1148 hours before you dig for utility line locates
1-500-424-5555
Page 1 of 2
Permit #SLD04237
GENERAL CONDITIONS
1, Contractors working on this project are required to have a Lobar & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut dawn while thisrs accomplished.
2. If temporary erosion and sediment control (TESL) measures are required, they shall be installed on-
site and inspected prior to beginning construction; call 385-2294. Measures shall include installation
of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc, Soils shall be permanently stabilized with seeding, plantings, sodding,
etc. once construction is complete. Applicant is responsible For protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections,
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is repaired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, ar if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department ~a) 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2