HomeMy WebLinkAboutBLD04-179
CITY OF PORT TOWNSEND
Waterman & Katz Building
I81 Quincy Sheet, Suite 301
Port Townsend, WA 98368
Phone:(3(i0)379-3208 Fax: (360)385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca1138S-2294 for Inspection
Permit Number: BLD04-179 Issued: 07/28/04 Parcel Number: 992 300 049
Job Address: In the center of 4 cotta es 4360 - 4390 San Juan Avenue
Zoning: R-II Type: V-N Occupancy: S-1
Total Occupant Load: 4 Nature of Work: Construct Storage unit for_four cottages.
Owner: Bret Sukert Contractor: Bret Sukert Construction - BRETSC*981DF
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTREI~ iN~PEC'.TT(lN~
APPROVEn/HATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS/SLAB
Setbacks
Footings
Forms
Reinforcement
Anchor Bolts
1'lolddowns --der architect design
UFER
Ca114$ hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit # BLb04179
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Prescriptive 8r designed braced wall panel sheathing &
nailingmust be inspected prior to cover
Fasteners, handers, etc. in contact with treated material must
be hat dipped galvanized
Floor -Engineered BCI Hoar plan on-site and
available to the Inspector at inspection time
Walls
Shear Walls -per architect
Ceilings
Posts, Beams & Headers Roof
Blocking
Roof -Engineered truss plan to be an site at inspection
Raof Venting - cave and ridge vents
Fire Blocking
Weather Resistive Barrier
DRY WALL NAILING
Walls -North & South Wall rated assemblies
FINAL
Public Works Sign-Off
Rated Doors
House Numbers - 5" minimum
Final -Building
Ca114$ hours before you dig for utility line locates
1-800-424-SSSS
Page 2 of 3
Permit 11 BI.P04179
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils. exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
S. Re-inspection is required after inspection report corrections are completed.
b. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-22..94. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin the Buildin De artment's final ins ection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building .permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
PORT TO
City of Port Townsend ~°~ ~ys~
Development Services Department ~' ~ a , , : °
Waterman-Katz Building
181 Quincy Street, Suite 301A, Port Townsend WA 98368 ~~wa
(360) 379-3208 FAX (360) 385-7675
Permit Numbers:
Owner:
_ __
Addresses:
Location;
Building/LJse:
CERTTFTCATE OF OCCUPANCY
BLD04-179, BLD04-180, BLD04-1$1, BLD04-182, BLD04-183
Bret Sukert
4360, 4370, 43$0, 4390 San ,luau Avenue
Port Townsend, WA 98368
Four Single Family Residences (Cottages A-D)
and Shared Storage Building
The above-referenced building or portion complies with the applicable requirements of the Port
Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used
and occupied in the use and manner indicated above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not
be removed except by the Building Official.
Approved:
GI/~-0 Yl^P~`
Suzanne~Wassmer, Permit Technician
Z8, 2005
Date
o~QOarrow~
s~
ti z
U d
t
.~
~~~F~WASH~~~o
CITY OF PORT TOWNSEND PUBLIC WORKS &
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER:
Address ~ ~ ~`
Contractor
Owner ~~ L~ ~~~ ~.
-~, , .,
Date of Inspection ~ ~ ~ " ~` ~
Worksite or Cell Phone# ~ . ~ _-
^ Erosion/Sedimentation J Plumbing/Top Out Drywall/Fire Wall
^ Setbacks/Footings/LIFER U Gas Pipe/Pressure Test U Gas/Wood Appliance
^ Foundation Walls ^ Propane Tank/Line ^ Manufactured Home Set-up
^ Slab Interior Footing/insulation V Mechanical
^ Groundwork/Plumbing Test ^ Framing
^ Underfloor Framing ^ Insulation
[J Shear Wall/Holdowns ^ Interior Shear/BWP Nail
^ Public Works
U Other/Consultation
^ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Messe Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZE=DB~BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION APPROVAL ^ CORRECTION REGIUIRED
^ APPROVED WITH CORRECTION v NEED APPROVED PLANS & PERMIT ON SITE
Approved pia s~ n permit d must be on-site and available at time of inspection,.
~M.
Inspector
- ----- . __ _ Date _ ~S
°~QORTr°``N~~ CITY OF PORT TOWNSEND PUBLIC WORKS ,,~'-^~\~
= ~ DEVELOPMENT SERVICES DEPARTMENT
2
q ~~ ~-a... ~ Cad `~
~°~WASN~~ INSPECTION REPORT _
PERMIT NUMBER: .(~LL~I~~~
Address ~~ ~~ ~~L~Cl
Contractor '~~ C.t ~~P~
Owner
Date of Inspection ~ ~- ~~C
Worlcsite or Cell Phone# ~3~ ~ ~~ 1S
^ Erosion/Sedimentation "~lumbing/Top Out ^ Drywall/Fire Wall
^ Setbacks/Footings/LIFER /^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance
^ Foundation Walls
^ Slab Interior Footing/Insulation
^ Groundwork/Plumbing Test
^ Underfloor Framing
^ Propane Tank/Line
U Mechanical
Framing
^ Insulation
^ Manufactured Home Set-up
'^ Public Works
V Other/Consultation
Shear Wall/Holdowns ^ Interior Shear/BWP Nail ^ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (3fiU) 385-2294 prior to 5:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY B 1NG AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION PPROVAL U CORRECTION REQUIRED
^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE
Approved~lan~a~d permit card y~nust be on-site and available at time of inspection.
.~ ~
__ ,_ __- Date __
Inspector
~~
~ 1~%
~.~ ` ~..~
t-'-~ ~
~~
,~G
o~Qpwrro~~~~ CITY OF PORT TOWNSEND PUBLIC WORKS
y
DEVELOPMENT SERVICES DEPARTMENT
~p~wnsH~~~ INSPECTION ~nREPO//RA~T
PERMIT NUMBER: [.~ ~-~ l~~I '~ ~ ~ f .~
Address , ,'`~ ~~
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
^ Erosion/Sedimentation
`Setbacks/Footings/U FER
^ Foundation Walls
Slab Interior Footing/Insulation
V Groundwork/Plumbing Test
^ Underfloor Framing
^ Shear Wall/Holdowns
^ Plumbing/Top Out ~^ Drywall/Fire Wall
u Gas Pipe/Pressure Test ^ Gas/Wood Appliance
^ Propane Tank/Line 'J Manufactured Home Set-up
^ Mechanical J Public Works
^ Framing ^ Other/Consultation
^ Insulation
^ Interior Shear/BWP Nail J FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY B AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION PPROVAL L.1 CORRECTION REQUIRED
^ APPROVED WITH CORRECTION !J NEED APPROVED PLANS & PERMIT ON SITE
Approved la sand perm' " rd must be on-site and available at time of inspection.
Inspector ~ Date ~ 1 ~ ~ __~ ~_
ct~ ~