HomeMy WebLinkAboutBLD04-104Waterman & Katz Building
181 Quincy St., Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTEIa AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD04~104 Issued: 04/21/04 Parcel Number: 948 326 304
Job Address: 1433 Sims Way Zoning: C-II Type: III-N Occupancy: B
Nature of Work: Repair Exterior Wall Damage
Owners: Amell Fami1~LTD Partnership Contractor: RJ Keds Enterprises Inc. Lic#I2JKEDE1055KK
GENERAL CONDITIONS APPLY -~ SEE LAST PAGE
SEPARATE PERMITS RE UIRED:
Electrical -Contact WA State Labor & industries @ 360-417-2702
RFniJIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls
Headers
Blocking
Positive Connections
Treated Wood to Concrete
Anchors- Epoxy Simpson Set Bolt
Window Safety Glazing -safety glazing
required in windows located within 24 "
arc of either edge of door
Weather Resistive Barrier
INSULATION
Walls (R-21)
DRYWALL NAILING
Walls
FINAL,
Building Numbers -check @ final
Final -Building
Ca1148 hours before you dig for utility line locates
I-800-424-SSSS
Page 1 of 2
Permit #BLD04-075
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
debris. Soils exposed duri~-g construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
S. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca1138S-2294. A
minimum of twenty-four hours notice is regnired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
$. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department ~ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-SSSS
Page 2 of 2
°~QO~Tr°"'rys5 CITY OF PORT TOWNSEND PUBLIC WORKS
U BUILDING AND COMMUNITY DEVELOPMENT
°FWASH~~ INSPECTION REPORT
,~1
PERMIT NUMBER: _ U,-' ~-~ ~''r~ ~ C ~ ~'f
Address _.-. (~ 5 ~ StY)'t ,~~ ~~
Contractor
Owner
J
Date of Inspection -
Worksite or Cell Phone#
^ Erosion/Sedimentation
^ Setbacks/Footings/LIFER
0 Foundation Walls
^ Slab Interior Footing/Insulation
LI Groundwork/Plumbing Test
[;:~ Underfloor Framing
^ Shear Wall/Holdowns
~v
i~,.e~
y (] J
«<...!lILLLI
^ Plumbing/Top Out ^ Drywall/Fire Wall CL-~,t~/
U Gas Pipe/Pressure Test
^ Propane Tank/Line
^ Mechanical
^ Framing
^ Insulation
^ Interior Shear/BWP Nail
^ Gas/Wood Appliance . fi"'~~
^ Manufactured Home Set-up
^ Public Works
u Other/Consultation
.FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-insp_ection.s.
For Re-inspection: colt Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY~3UILDING AND, If= APPLICABLE, PUBLIC WORKS.
Li VIOI-ATION ~~APPROVAL ^ CORRECTION REQUIRED
Approved plan~and permit card must be on-site and available at time of inspection.
,~ ~ _
_... __
~-- .F ---~ ~ _ , . , ~
nspeetor ,, - ._..---- - Date _'~ ~° -
o~QppTro~ry~~x CITY OF PORT TOWNSEND PUBLIC WORKS
BUILDING AND COMMUNITY DEVELOPMENT
N~ _. i - Z
-~:.. ~ ~~ INSPECTION REPORT
~~~" WASH~~
r
PERMIT NUMBER: ~ L/~ ~; ~~ ~ L,,
~ .~c~ l
Address _ ~ ~' Y? '~ _,~ r .r1~s ~.~~:`~-7
Contractor
Owner
~•.
~- ,
Date of Inspection
Worksite or Cell Phone#
Ll Erosion/Sedimentation
^ Setbacks/Footings/LIFER
^ Foundation Walls
ti ." ^ Slab Interior Footing/Insulation
^ Groundwork/Plumbing Test
^ Underfloor Framing
^ Shear Wall/Holdowns
~~?
^ Plumbing/Top Out
^ Gas Pipe/Pressure Test
^ Propane Tank/Line
^ Mechanical
U Framing
^ Insulation
^ Interior Shear/BWP Nail
L~`.Drywall/Fire Wall
^ Gas/Wood Appliance
^ Manufactured Home Set-up
^ Public Works
U Other/Consultation
^ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, caNl Inspection Message Line at (3fi0) 3135-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED .V BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATIONAPPROVAL ^ CORRECTION REQUIRED
f ~~
Approved plans and permit card must be on-site and available at time of inspection.
~--~ , . -
-..
Inspector ;. _ .-- - - Date - F~ :.- ~ ` ~
~p~QpRrrp~~
`~F
Z
U d
~pF WASH~~
CITY OF PORT TOWNSEND PUBLIC WORKS
BUILDING AND COMMUNITY DEVELOPMENT
INSPECTION REPORT
PERMIT NUMBER:
Address
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
^ Erosion/Sedimentation
^ Setbacks/Footings/LIFER
^ Foundation Walls
^ Slab Interior Footing/Insulation
^ Graundwork/Plumbing Test
^ Underfloor Framing
^ Shear Wall/Holdowns
~~
~,
~~.
~ 7
fJ Plumbing/Top Out
^ Gas Pipe/Pressure Test
^ Propane Tank/Line
^ Drywall/Fire Wall
~~ l ~%Tu ~=~..
! r1.,
U Gas/Wood Appliance /~`~~"~-u~ ~~ ~~'
^ Manufactured Home Set-up ~~"~~~~`'^'
^ Mechanical ^ Public Works
Framing ~~.~ -jYt~';~.~~~~ l.] Other/Consultation
Insulation _-_.__.__
fJ Interior Shear/BWP Nail LI FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION U APPROVAL ^ CORRECTION REQUIRED
/, r ,,
``~Z"~k:~ ~ ,
~ ~ ~ ,,
~• . ~ F--~
Approved plans anty pe'~~rd must be on-site and available at time of inspection.
Inspector -- ~-;~.~.~A ~..1-~ ~: '/.~ ~~....--_ _-~~ _ _. - ----- Date ~/ ~~~; G~ f
~, ~ _ .
~~ I~~ c.
~p~QORTTp~~~~ CITY OF PORT TOWNSEND PUBLIC WORKS
U ~ ~ BUILDING AND COMMUNITY DEVELOPMENT
~~pFWpSH``'"~ INSPECTION REPORT
PERMIT NUMBER: ~ ~~ b ~ " , ~ 7'~
Address ~ `i ~ 3 . ! ~ ~ f. ~(.~CZ.:~,.~
Contractor ~ ~ ~ ~ -~ Y l~~ ~~~~- ~ ~~ ~'~.J
Owner l ~~ (f ~'~''t / ~.~
Date of Ins ection ~ / ~- ~'~( ~~
P
Worksite or Cell Phone#
^ Erosion/Sedimentation ^ Plumbing/Top Out ^ Drywall/Fire Wall
Setbacks/Footings/LIFER CI Gas Pipe/Pressure Test ^ Gas/Wood Appliance
^ Foundation Walls ^ Propane Tank/Line a Manufactured Home Set-up
^ Slab Interior Footing/Insulation ~.1 Mechanical ^ Public Works
^ Groundwork/Plumbing Test ~yl(a~, Framing ^ Other/Consultation
~I Underfloor Framing ^ Insulation
^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail L] FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8.00 AM.
NO OCCUPANCY UNTIL FINALISED BY f3UILDING AND, IF APPLICABLE, PUBLIC WORKS.
C.l VIOLATION ^ APPROVAL .'a_] CORRECTION REGIUIR~D
,_-_ _..
.. ,;
..
:. _ ~ N
~P ~
r:
----~- ..
~ ;~_ r. ... k.
' ... -.i... ... f.. -~_-'X
..
i h °3 '
~ ~ ;; r ~. +_ F.. !.
Approved plans and permit card must be on-site and available at time of inspection.
Inspector ~' Date _ :;! . "