Loading...
HomeMy WebLinkAboutBLD04-098Waterman & Kahn Building 1$1 Quincy Street, Sutte 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 36(F38~7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 far Inspection Permit Number: BLD04-U98 Issued: 04/15/04 Parcel Number: 989 705 503 Job Address: 714 Washington Street Zoning: C-III Type: V-N Occupancy: N/A Total Occupant Load: No Chan,_ge Nature of Work: Replace glass skywall Owner: Rainshadow Properties Contractor: Craig Johnson- CRAIGJC992N2 GENERAL CONDITIONS APPLY: See last a e SEPARATE PERMITS RE UIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RECITTTRET) iN~PF(''TTnNfi APPRnVED/DATE DEMOLITION Materials from demolition shall be deposited in the Jef, ferson County Landfill or other approved areas off- site in accordance with all state and local laws FRAMING ~-.,.~:-=ti..~T~ -~-;~t~ , ~;,-__~ ~ ,,_..e.~~~:c, ``~'.,~ ~e-e~c-isti~rggl~ss pa~l~~v~-ls-at-~ach~nd_of wall . --l~i~e~;xg and~teathingf~~a~ed Wall barrel - _...-_ Attach PT 2X10 Ledger to Exterior Wall using Lag Shields, Epoxy and 8" Lag Bolts 4X6 PT Rafters Positive Connections Tempered Glazing required Crystalite Holddown System for Polycarbon Panels EXTERIOR SHEATHING Braced Wall Panel Design FINAL Building CALL 48 hours before you dig for Utility line locates 1-800-424-8888 Page 1 of 2 Building Permit #BL,D04-098 GENERAL CONDITIONS ]. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Ocaner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. S. Re-inspection is required after inspection report corrections are completed. G. The .Building Department is unable to pass final inspection an your project until Public Works requirements have been completed and inspected. For Public Works inspection call 3$5-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Buildin Department's final inspection. 7. Final lnspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. S. All building permits expire if no progress has been made within six months, or if no inspections are doue by the Building Department within oue year. Call For at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-50$6 prior to making changes to the approved plans. 10. POST THIS PERMiT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • o4poRTr°`y~~ CITY OF PORT TOWNSEND a DEVELOPMENT SERVICES DEPARTMENT '~~-' ~ =` INSPECTION REPORT q~=.- ~~'wa~ CALL "I'HIa INSPECTION LINE AT 360-385-2294 BY 3:OOpxn TIIE DAY BEFORE, YOrI WANT THE INSPECTION. FOR MONDAY INSPECTION, CALL BY 3:OOPM FRIDAY. __ •, r~ DATE OF INSPECTION: ~ ( PERMIT NUMBER: ~ L ~ ~~ r~ I ~ ~ ~ / SITE ADDRESS: ~ ~ `~ C~>~ ~C ~' ~ > CONTACT PERSON: TYPE OF INSPECTION: PHONE: ~~~ r~~ ~_ D APPROVED ~,,' ^ APPROVED WITH Cl NOT APPROVED •- --,: CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before ~ checked at next inspection proceeding. • - p. .__..%.___._ ~ /._ .% inspector ~ ~. ~= ~~ ~- L ~, `2-- Date ~7~ / 7 (~ , Acknowledgement Date Approved plans and permit card must he on-site and available at time of inspection. Are-inspection•fee may be assessed if work is oat rec7dy•fnr inspection.