Loading...
HomeMy WebLinkAboutBLD04-091Waterman 8c Katz 13uilding 181 Quincy Street, Suite 301 Pori Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca1138S-2294 for Inspection Permit Narnber: BLD04-091 Issued: 04/07/04 Parcel Number; 944 400 202 Job Address: 830 25t" Street Zoning: R-II Type: V-N Occupancy: R~3 Nature of Work: Add handrail to existing deck. Owner: Steuhen and Deborah Gottlieb Lewis Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(1TTTRFT) TN~PFC'TI[lN~ APPR(1VF.T)/T)ATF FRAMING All wood members to be pressure treated, wood of natural resistance to decay (cedar or redwood), or completely sealed with approved wood preservative such as Woodlife Classic II Wood Preservative with Water Repellent Guardrail FINAL Final inspection maybe done at Framing Inspection / if all work is visible (uncovered) Property address Ca1148 hours before you dig for utility line locates 1-800-424-SSSS Page 1 of 2 Permit #BLD04-091 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's resistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 3$5-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca113$5-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Buildins Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, ar if no inspections are done by the Building Department within one year. Call far at least one inspection per year to keep your building permit active. 9. Revisions require submittal & .approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-$00-424-SS5S Page 2 of 2 ~o~QOarrowrys CITY OP PORT TOWNSEND PUBLIC WORKS v mp =.- BUILDING AND COMMUNITY DEVELOPMENT p~~Fwns~~~~~ INSPECTION- REPORT C PERMIT NUMBER: !!5 r±.~ ~ y "~ ~ l ~ ~~~n S~. Address ~ ~ ~ .~~` `~ .f-~~ c ~~i~~~ _ Contractor ~f/~ ,~ k•vt o~ ~'"i Owner .S~ti~~~ ~~ ~ rn-~, ~t,i1 i s ~~ r a ~ -f---1 Date of inspection // I -] V T ~ ,;~ j~ Worksite ar Gell Phone# ~ C~ ~ ~ ~^ ~ ~ 7 ~ ~~'~ o ^ Erosion/Sedimentation ^ Plumbing op Out ^ Drywall/Fire Wall ~~ ~ " C:I Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test U Gas/Wood Appliance so ~pjJ~ ^ Foundation Walls U Propane Tank/Line ^ Manufactured Home Set-up ~ u" ~~ l:J Slab Interior Footing/Insulation J Mechanical ^ Public Works ~`'~"~ r~::.~: ' ^ Groundwork/Plumbing Test J~Framing ^ Other/Consultation ~ fl F U d C1lnsulation r ^ n e oor taming _ -~_ ~~ r~.c~~ ~ , -~ ^ Shear WaN/Holdowns ^ Interior Shear/BWP Nail '~ - -~-_ ~` ~'~'~' If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, calf Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UN71L FINALIZEp BY BUILD{NG AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION '~ APPROVAL Lt CORRECTION REQUIRED r e - ~~ Approved plans and permit card must be on-site and available at time of inspection. ;__._, .. - . ,.. -, Inspector _ ., '~ _ Date __