Loading...
HomeMy WebLinkAboutBLD04-055Wateman & Kaa Building 181 Quinsy Street, Suile 30] Port Townsend, WA 98368 Pfwne: (360) 3793208 Fax: (360) 385-7675 CITE OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO4-O55 Issued: 03/12!04 Parcel Number: 989 705 505 Job Address: 714 Washin¢ton Street Zoning: C-III Type: Temuorarv Tent Occupancy: AA_3 Occupancy Load: 160 aeople seated for tables and chairs; 343 for standins (no tables and chairs) Nature of Work: 2 400 sg ft Temoorarv Membrane Structure (40' x 60') for Snr1nE/Summer 2004 events Property Owner: Rainshadow Prouerties Business: Victorian Gardens behind Bishop hotel Joe Finnie @ 385-6122 GENERAL CONDITIONS APPLY -SEE LAST PAGE ELECTRICAL - a separate electrical permit is required for any electrical work. Contact Labor and Industries at (360) 417-2700 if needed. FOOD HANDLING -contact Jefferson County Health at 385-9444 for food events. FINAL -contact Tom Aumock, Port Townsend Fire Department, @ 385-2626, ~~~ for inspection and approval ~ " See attached checklist ~ t'~/~'" ___ Final -Fire Department (;? j (1 ~} ~~ ( U ~ ?C> f~Tt''l Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemnt k BLD04-055 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 3 8 5-2 294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11 3 85-22 94. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2