HomeMy WebLinkAbout96-143RESOLUTION
A RESOLUTION AUTHORIZING THE MAYOR TO SIGN CHANGE
ORDER NO. 2 WITH SEABOARD CONSTRUCTION, INC. FOR CHANGES
TO THE FILTER PIPING IN THE TRI-AREA WELL UPGRADE.
WHEREAS, CH2M HILL prepared design drawings and specifications for the filter piping for
the new filter 3; and
WHEREAS, Seaboard Construction installed filter 3 and associated piping in accordance with
the drawings and specifications; and
WHEREAS,
An error in the CH2M HILL design work caused the filter piping to not function
properly; thus revisions to the piping are necessary, and these revisions are
included in Change Order No. 2.; and
C H2M HILL will indirectly pay for the entire cost of Change Order No. 2 by
crediting the City through its Tri-Area Contract and, if necessary, through other
contracts it has with the City.
NOW THEREFORE
BE IT RESOLVED, the City Council of the City of Port Townsend does hereby authorize the
mayor to sign Change Order No. 2 with Seaboard Construction, Inc. to upgrade the filter piping
at the Tri-Area water treatment facility.
ADOPTED by the City Council of the City of Port Townsend and signed by the Mayor this 2nd
day of December, 1996.
~l~ulie M~Culloch, Mayor
ATTEST:
Pam Kolacy, City Clerk
~f~moth
V
[. ~ffah~n, City Attorney
C :\DOCS\PT\WATER\TRIAREA\SEABDCO2.RES