CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 85-22 94 for Inspection
Permit Number: $LD~4-~44
Job Address: 1136 Blaine Street
Total Occupant Load: No Change
Issued: 02/26/04 Parcel Number: 001 024 037
Zoning: RR=II Type: VV=N Occupancy: RR=3
Nature of Work: Re air & re lace foundation
Owners: Paul Berkshire/Julie Knott Contractor: Owner
GENERAL CONDITIONS APPLY: See Last Paee
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Porch Piers (if applicable)
%!
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts -1/2 " x 10 "@ 4'-0 " o. c.
Attach joists & rim to sill
Positive connection post to beam
FINAL
House Numbers - 5" numbers
Porch/Landings/Steps
6 mil black vapor barrier in crawlspace
Smoke Detectors throughout
Final -building
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Pertni[ #04-044
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to schedulinE the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555