HomeMy WebLinkAbout97-011RESOLUTION 97- / I
A RESOLUTION OF THE CITY COUNCIL DECLARING LYDEL
CONSTRUCTION, INC. TO BE THE LOWEST, RESPONSIVE,
RESPONSIBLE BIDDER FOR CONSTRUCTION OF TRI-AREA WELL
UPGRADES, PHASE II AND AUTHORIZING THE MAYOR TO SIGN A
CONTRACT AWARDING THE BID TO LYDEL CONSTRUCTION, INC.
OF POULSBO, WASHINGTON.
WHEREAS,
The City has advertised and received bids for bringing on-line the new well in the
Tri-Area, installing associated piping, chemical feed systems, and electrical
systems to upgrade the drinking water supply system in the Tri-Area; and
Bids were received in a fair and timely fashion, in accordance with City and State
bidding laws; and
WHEREAS, This project is funded in the 1997 budget under Water System - Supply,
Transmission and Storage; and
WHEREAS, The City has found Lydel Construction, Inc. to be the lowest, responsive,
responsible bidder,
NOW THEREFORE
BE IT RESOLVED by the City Council as follows:
1. The bid submitted by Lydel Construction, Inc. of Poulsbo, Washington is hereby accepted
and declared to be the lowest, responsive, responsible bidder.
2. The Mayor is hereby authorized to enter into a contract with Lydel Construction, Inc.
3. Payment to Lydel Construction, Inc. will be as set forth in the specifications of the
contract.
RESOLUTION 97- 1/
Page 2
ADOPTED by the City Council of the City of Port Townsend and signed by the Mayor this 3rd
day of February, 1997.
ATTEST:
Pam Kolacy, City Clerk
Julie~cCulloch, Mayor
A~ AS,~TO FORM:
i ix~it~l ~PT~WAT Ei~Ra~iaRi,A ffjt~ [~tjff r^~el. RES
Z
o°.8