CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BI.D04-O4OR-I Issued: 04/28/04 Parcel Number: 989 700 611
Job Address: 639 Water Street Zoning: C-III Type: VV=N Occupancy: N/C
Total Occupant Load: N/C Location: N.D. Hill Building
Nature of Work: Structural upgrades to Parapet
Owners: Donna and Christoaher Sudlow Contractor: Olvmuic Masonry Restoration - OLYMPMR044CZ
(360)385-5757
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: Any change in exterior paint colors is subject to Historic District Design Review
approval PRIOR to beginning any paintwork (application required). If the new exterior
paint colors are selected from the City's Historic Paint Palette, please complete an
Exterior Paint Registration form available from BCD.
Stuctural on-site welding to be performed by WABO Certified welders please submit
certifications to BCD for verification prior to welding.
REOUiRED INSPECTIONS
APPROVED/DATE
SEDIMENT CONTROL
Sweep Concrete & Paved Surfaces during
construction as needed
PEDESTRIAN PROTECTION -
Install barrier around area of work to prevent
pedestrian access. Provide Protection per UBC as
required. Inspection required prior to beginning
work.
MASONRY -see attached engineering
4000 psi grout for regrouting 5 mortar joints @
anchor height full width of face brick
MC8 X 18.7 Channel attached to masonry face with
3/4" X 12" threaded rod epoxied into wall @ 18" o.c.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 3
PemJ[N HLD04040R-1
REOUiRED INSPECTIONS APPROVED/DATE
FRAMING -see attached engineering
2X4 Walls @ 24" o.c. below bracing
1-1/8" X 36"plywood between roof joists attached
to roof sheathing w/36 l Od's @ 4" o.c.
Angle connection w/2 -angle %z" X 2-1/2" X 3/16"
attach to plywood and joist with 6 -''/o" SDS screws
into each member
MT5 18 straps at roof joists to wall studs
Angle braces at sheathing- 2- 4 X 4 X '/4" or
1- SXSXS/16"
Angle braces to wall and sheathing connections
FINAL
Building Number
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, haldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reouired. Public Works auaroval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Perrtdtm BLD00.-040R-I
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLAN5.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
W atermen & Kalz Building
I&l Quincy Streel, Suite 301
Part Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LD04-O40 Issued: 02/27/04 Parcel Number: 989 700 611
Job Address: 639 Water Street Zoning: C-III Type: VV=N Occupancy: N/C
Total Occupant Load: N/C Location: N.D. Hill Building
Nature of Work: Exterior reaair/renovation -See attached scone of work. Structural upgrades to be issued
as Revision #1 after en2ineerine is received.
Owners: Donna and Christopher Sudlow Contractor: Olvmaic Masonry Restoration
(360)385-5757
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: Any change in exterior paint colors is subject to Historic District Design Review
approval PRIOR to beginning any paintwork (application required). If the new exterior
paint colors are selected from the City's Historic Paint Palette, please complete an
Exterior Paint Registration form available from BCD.
REQUIRED INSPECTIONS
APPROVED/DATE
SEDIMENT CONTROL
Sweep Concrete & Paved Surfaces during
construction as needed
PEDESTRIAN PROTECTION -
Installbarrier around area of work to prevent
pedestrian access. Provide Protection per UBC as ;'' j
/ L. /
`~
required. Inspection required prior to beginning .
7
~~, ' ~ C1-
work. L `
MASONRY
All masonry repairs per attached scope of work.
FINAL
Building Number
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pertnit# BLD04-040
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-Four hours notice is required. Public Works aoaroval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 2 of 2
F ~I,~
'./~
~/
~~
~D
~1.
°``°p"°""~sF CITY OF PORT TOWNSEND PUBLIC WORKS
BUILDING AND COMMUNITY DEVELOPMENT
~°.wAS~~~° INSPECTION REPOR/T'
PERMIT NUMBER: ~ ~ ~~ Q'l Ci' ~~ ~ 1
Address
Contract
Owner
Date of Inspection `~ `-~ ~ - ~%~
Worksite or Cell Phone# ~~ ~ ~ ~S
^ Erosion/Sedimentation U Plumbing/Top Out ^ Drywall/Fire Wall
^ Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance
^ Foundation Walls ^ Propane Tank/Line ^ Manufactured Home Set-up
^ Slab Interior Footing/Insulation ^ Mechanical ^ Public Works
Groundwork/Plumbing Test ^ Framing Other/Consultation
Underfloor Framing ^ Insulation ~~tSVYI l~
^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail ~NAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZ EI;),BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION ~~APPROVAL ^ CORRECTION REQUIRED
Approved ~I/an„s, and permit card must be on-site and available at time of inspection.
Inspector s'~ ' _ _ Date ~' ~ _ ~.