Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout97-088RESOLUTION NO 97- ~/
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND
AUTHORIZING THE MAYOR TO SIGN AND SUBMIT THE 1998-2003 SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM.
WHEREAS, The Transportation Committee of the City Council has reviewed the 1998-2003
Six Year Plan; and
WHEREAS,
The City is required by the State of Washington Department of Transportation to
submit an approved Transportation Improvement Plan by July 31 of each year;
and
WHEREAS, Many City streets presently are of substandard construction; and
WHEREAS, Traffic and weight on many City streets have increased substantially; and
WHEREAS, The City receives ½ cent gas tax from the State for road improvements accounting
to approximately $55,000.00.
NOW THEREFORE, be it resolved that the City Council of the City of Port Townsend
authorizes the Mayor to sign this resolution approving the attached Six-Year Transportation
Improvement Program for 1998-2003 for submission to the State Department of Transportation.
Adopted by the City Council of the City of Port Townsend and signed by the Mayor this 21st
day of July, 1997.
?91ie McCulloch, Mayor
ATTEST:
CM:C:\COUNCILW, ESOLIJT~STREETS\98TIP.WPD
~tnot~yI
~rney
1998 - 2003 Transportation Improvement Plan
KEY CODES
F~nclion#l Classification (Federal Functional Classification)
Rt~ral (under 5.000 areal Urban (over 5.000 areal
Oi Interstate
02 Principal Arterial
06 Minor Arterial
07 Major Collector
08 Minor Collector
09 Local Access
00 No Classification
11 Interstate
12 Freeways & Expressways
14 Other Principal Arterial
16 Minor Arterial
! 7 Collector
18 Local Access
O0 No Classification
Priority Number
Local agency number identifying agency project priority (optional).
Project Identification
(a) Federal Aid Number if previously assigned.
(b) Bridge Number
(c) Project Title
(d) Street/road Name or Number/Federal Route Number
(e) Beginning and Ending Termini (milepost or street names)
(0 Describe work to be completed
Improvement Type Codes
Appropriate federal code number(s)
01 New construction
02 Relocation
03 Reconstuctionl
04 Major Widening
05 Minor Widening
06~Restoration and Rehabilitation
07 Resurfacing
08 New Bridge
09 Bridge Replacement
10 Major Bridge Rehab
11 Minor Bridge Rehab
12 Savety/Traffic OperationsfFSM
13 Environmentally Related
14 Bridge Special (Seismic Etc.)
21 Transit Capital Project
22 Transit Operational Project
23 Transit Planning
24 Transit Training/Admin
31 Non Capital Improvement
32 Non Motor Vehicle Project
Funding Status
F Project is selected and funding has been secured by the lead agency.
S Project is subject to selection by an agency other that the lead.
P Project is listed for planning purpose and funding is not secured
Total Length
Project length to the nearest hundredth mile (or code "00" if not applicable)
Utilities Code(s)
A code letter(s) for the utilities that would need to be relocated or are impacted by the construction project.
C Cable TV S Sewer (other than agency owned) G Gas
P Power X Telephone W Water
O Other
Project Ph#s¢
Appropriate phase code of the project.
PE Preliminary Engineering only (or planning)
RW Right of Way or land acquisition only ( or equipment purchase)
CN Construction only ( or transit planning)
ALL All phases from Preliminary Engineering through Construction
q7-gg
1997 - 2002 Transportation Improvement Plan - KEY CODES
Phase Start Date
The month/day/year in MM/D.D./Y. format that the selection phase of the project is actually expected to start.
Federal Funds Source
Federal Fund Source from the table.
BR
CMAQ
DEMO
IC
IM
NHS
S16
S18.
S3
S9
STP©
STP(E)
STP(S)
STP(R)
STP(U)
STP
OTHER
Bridge replacement or Rehab
Congested Mitigation Air Quality
ISTEA Demo Projects (Selected)
Interstate Construction
Interstate Maintenance
National Highway System
FTA Elderly & Disabled Persons
FTA Rural Areas
FTA Discretionary for Capital Expenditures
FTA Urban Areas
STP Statewide Competitive Program
STP Transportation Enhancement
STP Safety including Hazard & RR
STP Rural regionally selection
STP Urban regionally selected
STP other STP project not listed
other Federal Funds Sources
Federal Cost
Total federal code (in thousands) of the phase regardless of when the funds will be spent.
State Funds Code
Al~propriate code for any of the listed funds to be used on this project.
CAPP
TIA!
PWTF
RAP
UATA
Other
County Arterial Preservation Program
Transportation Improvement Account
Public Works Trust Funds
Rural Arterial Program
Urban Arterial Trust Account
i.e. WSDOT
State Funds
Funds from State Agencies (in thousands) of the phase regardless of when the funds will be spent.
Local Funds
Funds from local Agencies (in thousands) of the phase regardless of when the funds will be spent.
Total Funds
Enter the sum of the columns 10,12 and 14. This field will total automatically in this application.
Expenditure Schedules- (lst, 2nd, 3rd 4th thru 6th years)
Estimated expenditures ( in thousands) of dollars by the year.
This data is for Local Agency use.
q7-gg
1997 - 2002 Transportation Improvement Plan - KEY CODES
Environmental Data type
Type of environmental assessment that will be for this project. This is required for Federally Funded projects only.
El Environmental Impact
S Statement
EA Environmental Assessment
CE Categorical Exclusion
NA Not Applicable/Unknown
R/W Certification
Circle Y if Right of Way acquisition is required,
lfyes, Enter R/W Certification Date if Known.
This is required for Federally Funded projects only.
7-gg
z
0
o m
Z
"0
0
Z
0
~Z
o
~0
oO
z 0 ~ ,-I 0 Z C:: -ir
:: m Z
o ~ O0
3 m
p p p ~ oo~ z~zrnr'
~ zOOm 0 zO:~m ~) zO~ 0 m ~C :~m
:
·
0
~rrm
~oo ~oo oooo 8800
Z
'13
0
0
Z
0
~Z
o
~0
o~
zO ~""-I~ Z ~
~ ....: · '.!':~ ::: . -~ I,a :~ m ~ ~ c: z
-u ~ c~ c0 ~: ~: . .., .....
.~ ~= ~ _. ,, ,~, -. ~ .....
0
rrl
oo~, -o .... o ~
~. o 3=- ~ ~ ~ ~ ~ ~ ~: ~ ~z
~. > ~ > ~ m
Z
' -- o ~ O0
m~o~--
· ~ ~m~
~0~
o o ~ ~ ~ ~ z~gzm~
~ ~--r--~
r ~ ~ ~ r _ r _ r _
0
~ r~~
0
..~
0 O0 0 ~ COO C O0 0 ~ O0 0 0 O0 0 ffi '
0 0 0 0 0 ,.,~ -.~ ~ 0 0 0 0 0 O, 0
oooo ·
oo ~oo ~o~o ~o~ . ~
o ~ ~ ~oo o ~oo ~ ~oo o
.
Z
O>
O'-
Z
0
<
m
.<
rn
:;0
Z
O''
mm
0
Z
0
<
~Z
o ~
~0
Z
'0
0'~
Z
o~'m
Z
Or)
'13
0
0
m
Z
0
Z
Z
""0
0
0
Z
0
ITl
Z
"0
0
0
Z
;0
0
_~m
o ;;0
~0
1997 - 2002 Transportation Improvement Plan
KEY CODES
Functional Classification (Federal Functional Classification)
Rural (under 5.000 area) Urban (over 5.000 area)
01 Interstate
02 Principal Arterial
06 Minor Arterial
07 Major Collector
08 Minor Collector
09 Local Access
O0 No Classification
11 Interstate
12 Freeways & Expressways
14 Other Principal Arterial
16 Minor Arterial
17 Collector
18 Local Access
00 No Classification
Priority Number
Local agency number identifying agency project priority (optional).
Project Identification
(a) Federal Aid Number if previously assigned.
(b) Bridge Number
(c) Project Title
(d) Street/road Name or Number/Federal Route Number
(e) Beginning and Ending Termini (milepost or street names)
(f) Describe work to be completed
Improvement Type Codes
Appropriate federal code number(s)
01 New construction
02 Relocation
03 Reconstuctionl
04 Major Widening
05 Minor Widening
06 Restoration and Rehabilitation
07 Resurfacing
08 New Bridge
09 Bridge Replacement
l0 Major Bridge Rehab
11 Minor Bridge Rehab
12 Savety/Traffic Operations/TSM
13 Environmentally Related
14 Bridge Special (Seismic Etc.)
21 Transit Capital Project
22 Transit Operational Project
23 Transit Planning
24 Transit'Training/Admin
31 Non Capital Improvement
32 Non Motor Vehicle Project
Funding Status
F Project is selected and funding has been secured by the lead agency.
S Project is subject to selection by an agency other that the lead.
P Project is listed for planning purpose and funding is not secured
Total Length
Project length to the nearest hundredth mile (or code "00" if not applicable)
Utilities Code(s)
A code letter(s) for the utilities that would need to be relocated or are impacted by the construction project.
C Cable TV S Sewer (other than agency owned) G Gas
P Power T Telephone W Water
O Other
Pro_iect Phase
Appropriate phase code of the project.
PE Preliminary Engineering only (or planning)
RW Right of Way or land acquisition only ( or equipment purchase)
CN Construction only ( or transit planning)
ALL All phases from Preliminary Engineering through Construction
Phase Start Date
0'< = ~ ~ ~'= =
· Z (1)
> "0 _c.. 0 0
oo ~t
Z
'13
0
0
Z
~'=o 0