Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
97-088
RESOLUTION NO 97- ~/ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND AUTHORIZING THE MAYOR TO SIGN AND SUBMIT THE 1998-2003 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM. WHEREAS, The Transportation Committee of the City Council has reviewed the 1998-2003 Six Year Plan; and WHEREAS, The City is required by the State of Washington Department of Transportation to submit an approved Transportation Improvement Plan by July 31 of each year; and WHEREAS, Many City streets presently are of substandard construction; and WHEREAS, Traffic and weight on many City streets have increased substantially; and WHEREAS, The City receives ½ cent gas tax from the State for road improvements accounting to approximately $55,000.00. NOW THEREFORE, be it resolved that the City Council of the City of Port Townsend authorizes the Mayor to sign this resolution approving the attached Six-Year Transportation Improvement Program for 1998-2003 for submission to the State Department of Transportation. Adopted by the City Council of the City of Port Townsend and signed by the Mayor this 21st day of July, 1997. ?91ie McCulloch, Mayor ATTEST: CM:C:\COUNCILW, ESOLIJT~STREETS\98TIP.WPD ~tnot~yI ~rney 1998 - 2003 Transportation Improvement Plan KEY CODES F~nclion#l Classification (Federal Functional Classification) Rt~ral (under 5.000 areal Urban (over 5.000 areal Oi Interstate 02 Principal Arterial 06 Minor Arterial 07 Major Collector 08 Minor Collector 09 Local Access 00 No Classification 11 Interstate 12 Freeways & Expressways 14 Other Principal Arterial 16 Minor Arterial ! 7 Collector 18 Local Access O0 No Classification Priority Number Local agency number identifying agency project priority (optional). Project Identification (a) Federal Aid Number if previously assigned. (b) Bridge Number (c) Project Title (d) Street/road Name or Number/Federal Route Number (e) Beginning and Ending Termini (milepost or street names) (0 Describe work to be completed Improvement Type Codes Appropriate federal code number(s) 01 New construction 02 Relocation 03 Reconstuctionl 04 Major Widening 05 Minor Widening 06~Restoration and Rehabilitation 07 Resurfacing 08 New Bridge 09 Bridge Replacement 10 Major Bridge Rehab 11 Minor Bridge Rehab 12 Savety/Traffic OperationsfFSM 13 Environmentally Related 14 Bridge Special (Seismic Etc.) 21 Transit Capital Project 22 Transit Operational Project 23 Transit Planning 24 Transit Training/Admin 31 Non Capital Improvement 32 Non Motor Vehicle Project Funding Status F Project is selected and funding has been secured by the lead agency. S Project is subject to selection by an agency other that the lead. P Project is listed for planning purpose and funding is not secured Total Length Project length to the nearest hundredth mile (or code "00" if not applicable) Utilities Code(s) A code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C Cable TV S Sewer (other than agency owned) G Gas P Power X Telephone W Water O Other Project Ph#s¢ Appropriate phase code of the project. PE Preliminary Engineering only (or planning) RW Right of Way or land acquisition only ( or equipment purchase) CN Construction only ( or transit planning) ALL All phases from Preliminary Engineering through Construction q7-gg 1997 - 2002 Transportation Improvement Plan - KEY CODES Phase Start Date The month/day/year in MM/D.D./Y. format that the selection phase of the project is actually expected to start. Federal Funds Source Federal Fund Source from the table. BR CMAQ DEMO IC IM NHS S16 S18. S3 S9 STP© STP(E) STP(S) STP(R) STP(U) STP OTHER Bridge replacement or Rehab Congested Mitigation Air Quality ISTEA Demo Projects (Selected) Interstate Construction Interstate Maintenance National Highway System FTA Elderly & Disabled Persons FTA Rural Areas FTA Discretionary for Capital Expenditures FTA Urban Areas STP Statewide Competitive Program STP Transportation Enhancement STP Safety including Hazard & RR STP Rural regionally selection STP Urban regionally selected STP other STP project not listed other Federal Funds Sources Federal Cost Total federal code (in thousands) of the phase regardless of when the funds will be spent. State Funds Code Al~propriate code for any of the listed funds to be used on this project. CAPP TIA! PWTF RAP UATA Other County Arterial Preservation Program Transportation Improvement Account Public Works Trust Funds Rural Arterial Program Urban Arterial Trust Account i.e. WSDOT State Funds Funds from State Agencies (in thousands) of the phase regardless of when the funds will be spent. Local Funds Funds from local Agencies (in thousands) of the phase regardless of when the funds will be spent. Total Funds Enter the sum of the columns 10,12 and 14. This field will total automatically in this application. Expenditure Schedules- (lst, 2nd, 3rd 4th thru 6th years) Estimated expenditures ( in thousands) of dollars by the year. This data is for Local Agency use. q7-gg 1997 - 2002 Transportation Improvement Plan - KEY CODES Environmental Data type Type of environmental assessment that will be for this project. This is required for Federally Funded projects only. El Environmental Impact S Statement EA Environmental Assessment CE Categorical Exclusion NA Not Applicable/Unknown R/W Certification Circle Y if Right of Way acquisition is required, lfyes, Enter R/W Certification Date if Known. This is required for Federally Funded projects only. 7-gg z 0 o m Z "0 0 Z 0 ~Z o ~0 oO z 0 ~ ,-I 0 Z C:: -ir :: m Z o ~ O0 3 m p p p ~ oo~ z~zrnr' ~ zOOm 0 zO:~m ~) zO~ 0 m ~C :~m : · 0 ~rrm ~oo ~oo oooo 8800 Z '13 0 0 Z 0 ~Z o ~0 o~ zO ~""-I~ Z ~ ~ ....: · '.!':~ ::: . -~ I,a :~ m ~ ~ c: z -u ~ c~ c0 ~: ~: . .., ..... .~ ~= ~ _. ,, ,~, -. ~ ..... 0 rrl oo~, -o .... o ~ ~. o 3=- ~ ~ ~ ~ ~ ~ ~: ~ ~z ~. > ~ > ~ m Z ' -- o ~ O0 m~o~-- · ~ ~m~ ~0~ o o ~ ~ ~ ~ z~gzm~ ~ ~--r--~ r ~ ~ ~ r _ r _ r _ 0 ~ r~~ 0 ..~ 0 O0 0 ~ COO C O0 0 ~ O0 0 0 O0 0 ffi ' 0 0 0 0 0 ,.,~ -.~ ~ 0 0 0 0 0 O, 0 oooo · oo ~oo ~o~o ~o~ . ~ o ~ ~ ~oo o ~oo ~ ~oo o . Z O> O'- Z 0 < m .< rn :;0 Z O'' mm 0 Z 0 < ~Z o ~ ~0 Z '0 0'~ Z o~'m Z Or) '13 0 0 m Z 0 Z Z ""0 0 0 Z 0 ITl Z "0 0 0 Z ;0 0 _~m o ;;0 ~0 1997 - 2002 Transportation Improvement Plan KEY CODES Functional Classification (Federal Functional Classification) Rural (under 5.000 area) Urban (over 5.000 area) 01 Interstate 02 Principal Arterial 06 Minor Arterial 07 Major Collector 08 Minor Collector 09 Local Access O0 No Classification 11 Interstate 12 Freeways & Expressways 14 Other Principal Arterial 16 Minor Arterial 17 Collector 18 Local Access 00 No Classification Priority Number Local agency number identifying agency project priority (optional). Project Identification (a) Federal Aid Number if previously assigned. (b) Bridge Number (c) Project Title (d) Street/road Name or Number/Federal Route Number (e) Beginning and Ending Termini (milepost or street names) (f) Describe work to be completed Improvement Type Codes Appropriate federal code number(s) 01 New construction 02 Relocation 03 Reconstuctionl 04 Major Widening 05 Minor Widening 06 Restoration and Rehabilitation 07 Resurfacing 08 New Bridge 09 Bridge Replacement l0 Major Bridge Rehab 11 Minor Bridge Rehab 12 Savety/Traffic Operations/TSM 13 Environmentally Related 14 Bridge Special (Seismic Etc.) 21 Transit Capital Project 22 Transit Operational Project 23 Transit Planning 24 Transit'Training/Admin 31 Non Capital Improvement 32 Non Motor Vehicle Project Funding Status F Project is selected and funding has been secured by the lead agency. S Project is subject to selection by an agency other that the lead. P Project is listed for planning purpose and funding is not secured Total Length Project length to the nearest hundredth mile (or code "00" if not applicable) Utilities Code(s) A code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C Cable TV S Sewer (other than agency owned) G Gas P Power T Telephone W Water O Other Pro_iect Phase Appropriate phase code of the project. PE Preliminary Engineering only (or planning) RW Right of Way or land acquisition only ( or equipment purchase) CN Construction only ( or transit planning) ALL All phases from Preliminary Engineering through Construction Phase Start Date 0'< = ~ ~ ~'= = · Z (1) > "0 _c.. 0 0 oo ~t Z '13 0 0 Z ~'=o 0