Loading...
HomeMy WebLinkAbout012023 Temporary Road ClosureCitycry t r 250 M adison Street, Sete 2R Port Toownsen� , `36; 68 60.7 .5056 wwwAtyofpt ns Pw� Townsen PUBLIC WORKS Contact: Public Works Department Name: Steve King, Public Works Director Phone: 360-531-1631 Email: skiing@c1'tyofpt.us For Immediate Release — January 20, 2023 TEMPORARY ROAD CLOSURE PORT TOWNSEND —Water Street between Gaines Street and Sims Way will be temporarily closed Monday January 23rd through Tuesday January 24th. The street will be closed for paving. Paving activity requires closure of the road for safety of the traveling public and workers. Background: City crews discovered a failing sewer main on Wednesday, December 27, 2022. The location of the failed sewer main was near the intersection of Water Street and Gaines Street. This sewer main serves all of Downtown and most of Uptown and thus is an important sewer mainline with relatively high flows. The sewer main was repaired by Seton Construction as an emergency repair during the last week of December 2022. Now, weather permitting, the final step to completing this project is to pave the road. Location of street closure: The road closure is located on Water Street between the Wells Fargo Bank access on Gaines Street and the intersection of Sims Way and Water Street. The area is indicated on the below map, outlined in red. city Port t���1r " %% Townsend PUBLIC WORKS 50 Madison Street, Suite 2R � Port `To'wnsend, WA 98368 68 � 360.3 ,50 6 � wwwacfityofi t.us Business Access: All adjacent businesses will have access throughout this time. The sidewalks on the east side of Gaines Street and the north side of Water Street will remain free and clear for pedestrian travel. Contact: For questions about this project, please contact City of Port Townsend's Public Works Director, Steve King, P.E. 360-531-1631 orslkiiiin&2c'otyof�pt.us.