Loading...
HomeMy WebLinkAbout22-041 Updating and Providing for Public Works Department FeesResolution 22-041 Page 1 of 1 Resolution No. 22-041 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND UPDATING AND PROVIDING FOR PUBLIC WORKS DEPARTMENT FEES WHEREAS, the City Council of the City of Port Townsend, on recommendation of the City Manager and City Public Works Director, determines it appropriate to update fees established in Resolution 11-041 (approved December 19, 2011) and updated in Resolution 14- 007 (approved March 17, 2014) as set forth in this Resolution. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend as follows: SECTION 1. New Fees Established. Effective November 1, 2022 the fees for various Public Works Department fees, as set forth in Exhibits A (attached hereto and incorporated by reference) are hereby established (and prior fees are rescinded) and SECTION 2. Severability. If any provision of this Resolution or its application to any person or circumstance is held invalid, the remainder of the ordinance, or the application of the provision to other persons or circumstances is not affected. ADOPTED by the City Council of the City of Port Townsend at a regular meeting thereof, held this 17th day of October 2022._,........°° David J Faber Mayor Attest: Alyssa Ro11 drigues City Clerk Approved as to form: 1-leap<li C:ir°�°et�wc oil City Attorney Resolution 22-041 Exhibit A Page 1 of 4 Public Works Fees Description Charles Bond administration fee $200.00 Testing fees: Pressure (inspector) $50.00 Bacteria (lab) $40.00 Any other water quality test administrative fee cost plus 10% Limited hydrant use charge and permit fee under Chapter 13.13 PTMC„ Contractors: Permit fee $50.00 Usage fee (bulk water) $2.84/1,000 gallons - city $3.41/1,000 gallons - county Cash deposit for meter $100.00 Failure to return meter orwdamaged rymeter __. Up to $1,500.00.._......_. ..... Water meter installation charges under Chapter 13.16 PTMC 5/8" x 3/4" — Dig - City $1,070.00 (1) County m ... .......... $1,335.00.0.1 ...w.... 1" — Dig City $1,180.00 (1) ..... Dual Service (includes one meter drop-in only) 1"x2@3/4" City $1,240.00 (1) County $1 505 00 (1.)...............ry 1-1/2" — Dig City $2,000.00 (1) County . ........ $2 200..00 0.).......,.... 2" — Dig City $2,275.00 (1) County........ $2,475.00 (1) 8"__I Dig..... 5/8" x 3/4" Drop-in - City $135.00 County $160.00 1" — Drop-in -mm City $185.00 Coin ............. .. $215.00 Resolution 22-041 Exhibit Resolution 22-041 Exhibit A Page 3 of 4 Description ry... Charles Returned check charge $25.00 ,Special review and inspection *Charges based on service actual cost established by the public works director at rates contained in subsection 13 of this section. Hourly labor and equipment charges: Personnel (includes overhead).- verhead):Engineer Engineer $62.00 Inspector $50.00 Public works director $75.00 Operations Manager $65.00 Crew chief/lead equipment operator $56.00 Equipment operator $48.00 Maintenance personnel $38.00 Administrative staff $47.00 Engineering technician $52.00 GIS coordinator $52.00 Equipment: Without operator With operator Tractor -mounted mower $30.00/hr. $78.00/hr. One -ton truck with utility box $15.00/hr. $63.00/hr. John Deere grader $110.00/hr. $158.00/hr. John Deere loader $90.00/hr. $138.00/hr. Street sweeper $115.00/hr. $163.00/hr. 5 -yard dump truck $40.00/hr. $88.00/hr. Street roller $30.00/hr. $78.00/hr. John Deere backhoe $40.00/hr. $88.00/hr. Ingersoll-Rand compressor $20.00/hr. $68.00/hr. Vactor sewer jet and truck $140.00/hr. $188.00/hr. Sewer Inspection Camera N/A $118/hr Septage collection charge 15 cents per ballon* *The city manager shall establish the cost of service with rates not to exceed this maximum (maximum equates to a rate of $36.00 per wet ton). Jefferson County may add an additional charge to cover its administrative,handling, and collection costs as provided by contract with% the city Charge for compost produced at the city's biosolids composting facility (up to $25.00 per cubic yard 10 yards) (includes state sales tax)* Bulk rate for 10 yards per load or greater $20.00 per cubic yard includes state sales tax)* *The city manager shall establish the cost of service with rates not to exceed this maximum. �rrt adi clg,gLjtit q of,r waste not included in tj ,pe pt la_ ifl ac r " ............ ... $25,00 base fee lu $Iper ..gallon Resolution 22-041 Exhibit A