HomeMy WebLinkAbout2023-2028 Capital Facilities Plan - Adopted Ord 3301_appendices
Appendix A
Capital Project Budget Sheets
Pink House
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actual 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
ARPA 305,000$ 5,000 30,000 270,000 305,000
- - -
-
Total Revenue 305,000$ - - - 30,000 270,000 305,000 -
Expense Prior Year
Expenditures
2022 Actual 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
Terrapin Contract $12,000 35,000$ 780 5,000 30,000 35,000
- -
- -
- -
- -
Subtotal 35,000$ - -
Construction
General Government 250,000$ 250,000 250,000 -
- -
- -
- -
- -
Subtotal 250,000$ - -
Project Management
General Government 20,000$ 20,000 20,000 -
- -
- -
- -
- -
Subtotal 20,000$ - -
Project Contingency - -
-$ - -
Total Expense 305,000$ - - 5,000 - 30,000 270,000 305,000 -
Evaluate and make repairs to exterior of the Charles Pink House. The siding and trim are in disrepair.
Library Windows
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues
Bond Fund Transfer In 62,209$ - 500 62,209 62,209
Real Estate Excise Tax 7,791$ - 7,791 7,791
Federal Grant (ARPA)100,000$ 100,000 100,000
-
-
-
-
Total Revenue 170,000$ - - 500 70,000 100,000 170,000
Expense Prior Year
Expenditures
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
-
-
-
-
Subtotal -$ - -
Construction -
General Government 167,500$ - 67,500 100,000 167,500
-
-
-
-
Subtotal 167,500$ -
Project Management
General Government 2,500$ 197 500 2,500 2,500
-
-
-
-
Subtotal 2,500$ -
Project Contingency -
-$ -
Total Expense 170,000$ - 197 500 70,000 100,000 170,000
The 1989 additon to the Port Townsend Library has windows with frames that are beginning to rot due to moisture intrusion and window failure. This project replaces the windows for this portion of the library. The source of funds
for this project are bond revenues as well as American Rescure Plan Act funds.
Library Restrooms
Project Description
Project Budget Prior Year
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
RevenueGeneral Government or Federal Funds 33,000$ - 33,000 33,000
-
-
-
-
-
-
33,000$ - - 33,000 - 33,000 - Total Revenue
Prior Year
Expenditures
2022 est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
ExpenseDesign Engineering / Permitting
- -
- -
- -
- -
- -
Subtotal -$ - -
Construction -
General Government 30,500$ 30,500 30,500 -
- -
- -
- -
- -
Subtotal 30,500$ - -
Project Management
General Government 2,500$ 2,500 2,500 -
- -
- -
- -
- -
Subtotal 2,500$ - -
Project Contingency - -
-$ - -
33,000$ - - 33,000 - - 33,000 -
The library restrooms in the 1989 addition to the Library are in need of rehabilitating. The project includes: demolishing and replacing all fixtures, toilet partitions, all toilet accessories and finishes. Also included is: painting, tile
removal, and rot repair in Men’s and Women’s restrooms. The source of funds for this project are bond revenue as well as American Rescue Plan Act funds.
Chetzemoka Kitchen Shelter
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Banked Capacity Transfer In 50,000$ - 7,500 42,500 50,000 -
Donations 50,000$ 50,000 50,000 -
-
-
-
-
-
Total Revenue 100,000$ - - 7,500 92,500 100,000 -
Expense Prior Year
Expenditures
2022 Est.
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
- -
- -
- -
Subtotal -$ - -
Construction
General Government 92,500$ 92,500 92,500 -
- -
- -
- -
- -
Subtotal 92,500$ - -
Project Management
General Government 7,500$ 7,500 7,500 -
- -
- -
- -
- -
Subtotal 7,500$ - -
Project Contingency - -
-$ - -
Total Expense 100,000$ - - 7,500 92,500 100,000 -
The Chetzemoka Kitchen Shelter is currently closed due to failing structural elements. The roof was rebuilt in recent years; however, the remaining elements of this historic structure need to be rehabilitated. This project uses a
combination of banked capacity and a donation for Chetzemoka Park as revenue to fund the project.
Kah Tai Restrooms
Project Description
Revenue Project Budget Prior Year
Revenues
2023 Budget 2024 Budget Future Budget Total Revenues Actuals To Date
2023 Banked Capacity 47,000$ 47,000 47,000 -
RCO 156,400$ 156,400 156,400 -
Volunteer Match 20,000$ 20,000 20,000
-
-
-
Total Revenue 223,400$ - 223,400 - 223,400 -
Expense Prior Year
Expenditures
2023 Budget 2024 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
General Government 50,000$ 50,000 50,000 -
- -
- -
- -
Subtotal 50,000$ - -
Construction
General Government 168,400$ 148,400 148,400 -
- -
- -
- -
- -
Subtotal 168,400$ - -
Project Management
General Government 5,000$ 5,000 5,000 -
- -
- -
- -
- -
Subtotal 5,000$ - -
Project Contingency - -
-$ - -
Total Expense 223,400$ - 203,400 - 203,400 -
Staff submitted for a RCO grant to rehabilitate Kah Tai Restrooms to bring the City into compliance with the original land water conservation grant for the park.
Affordable Housing
Project Description
Revenue Prior Year
Revenues
2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Federal Grant (Anticipated)2,500,000$ 800,000 2,500,000 2,500,000 -
State Utility Grant 1,700,000$ 26,500 1,673,500 1,700,000 -
State Affordable Housing Grant 1,372,000$ 1,355,476 16,523.71 1,372,000 1,372,000
City Funds 43,500$ 30,000.00 13,500 43,500 30,000
Jefferson County ARPA 500,000$ 500,000 500,000
- -
-
Total Revenue 6,115,500$ 1,355,476 46,523.71 800,000 540,000 4,173,500 6,115,500 1,402,000
Expense Prior Year
Expenditures
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Land Purchase / Permitting
Land Purchase 1,372,000$ 1,355,476 16,523.71 1,372,000 1,355,476
Planning and Permitting 500,000$ 500,000 500,000 -
Cultural resources General Government 43,500$ 30,973.20 43,500.00 43,500 30,973
- -
- -
Subtotal 1,915,500$ - - -
Construction -
- -
- -
- -
Sewer Lift Station and Forcemain Sewer 3,150,000$ 3,150,000 3,150,000 -
- -
Subtotal 3,150,000$ - - -
Project Management/Design Engineering -
General Government 2,500$ 1,661.93 2,500.00 2,500 1,662
- -
- -
Sewer 1,047,500$ 133.72 500.00 100,000 40,000 1,007,000 1,047,500 134
- -
Subtotal 1,050,000$ - -
Project Contingency - -
-$ - -
Total Expense 6,115,500$ 1,355,476 32,769 63,023.71 100,000 540,000 4,157,000 6,115,500 1,388,245
The City received two grants for affordable housing in 2021. An additional Federal Grant is anticipated in late 2021 as well. The funding is directed to create land available for affordable housing through acquisition of property and the construction of
sewer infrastructure to support full develompent of the land. An interfund loan will provide cashflow until reimbursement from the State is received for the acquisition of property.
City Hall Upgrades Phase 3
Project Description
Revenue Project Budget Prior Year
Revenues
2023 Budget 2024 Budget Future Budget Total Revenues Actuals To Date
ARPA 400,000$ 400,000 400,000 -
- -
-
-
-
-
Total Revenue 400,000$ - 400,000 - 400,000 -
Expense Prior Year
Expenditures
2023 Budget 2024 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
- -
- -
- -
Subtotal -$ - -
Construction
General Government 350,000$ 350,000 350,000 -
- -
- -
- -
- -
Subtotal 350,000$ - -
Project Management
General Government 50,000$ 50,000 50,000 -
- -
- -
- -
- -
Subtotal 50,000$ - -
Project Contingency - -
-$ - -
Total Expense 400,000$ - 400,000 - 400,000 -
City Hall underwent a remodel in 2007 and left many parts of the project incomplete. In 2021 a front counter was added to the lobby. After space planning in 2022, a continued phased approach to upgrading
the City Hall office spaces on floors 2R and 3 were recommended. These floors were never completed in the earlier remodels of City Hall. The work proposed includes sound control, HVAC, carpet replacement,
furniture, and conference room development.
Project Description
Revenue Project Budget 2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
-
REET 85,000$ 2,000 83,000 85,000 -
In Kind Match - North Side 100,000$ 2,000 48,000 50,000 100,000 -
PIF 185,000$ 30,000 155,000 - 185,000 -
-
-
Total Revenue 370,000$ - 34,000 - 286,000 50,000 370,000 -
Expense 2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
Design Consultant - Port 30,000$ 30,000 30,000 -
- -
- -
- -
- -
Subtotal 30,000$ - - -
Construction -
Construction Contract 225,000$ 225,000 225,000 -
In Kind Match - North Side 100,000$ 2,000 48,000 50,000 100,000 -
- -
- -
- -
Subtotal 325,000$ - - -
Project Management -
Engineering Administration - -
15,000$ 1,376 2,000 13,000 15,000 1,376
- -
- -
- -
Subtotal 15,000$ - -
Project Contingency - -
-$ - - -
Total Expense 370,000$ 1,376 34,000 - 286,000 50,000 370,000 1,376
The Sims Way and Boatyard Expansion project was approved by the City Council, Port of Port Townsend, and Jefferson County PUD on 9/12/22. The construction of the south side of the project will be led by the Port with the City
doing work overtime on the north side. The project involves removal of the existing Poplar trees, expanding the boatyard, and planting new trees on the south side. The project involves selective removal over time on the Kah Tai
side by the City
Pacific & Spruce
Project Description
Revenue Project Budget 2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Banked Capacity Transfer In 87,881$ 5,000 15,000 82,881 87,881 -
Water Transfer In 75,000$ 5,000 75,000 70,000 75,000 -
Sewer Transfer In 60,000$ 5,000 60,000 55,000 60,000 -
Stormwater Transfer In 25,000$ 5,000 25,000 20,000 25,000 -
Total Revenue 247,881$ - 20,000 175,000 227,881 247,881 -
Expense 2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
- -
- -
- -
Subtotal -$ - - -
Construction -
- -
Street 72,881$ 7,560 72,881 80,441 7,560
Water 60,000$ 60,000 60,000 60,000 -
Sewer 49,000$ 49,000 49,000 49,000 -
Storm 19,000$ 19,000 19,000 19,000 -
Subtotal 200,881$ 128,000 200,881 200,881 - -
Project Management -
General Government - -
Street 15,000$ 1,268 5,000 15,000 10,000 16,268 1,268
Water 15,000$ 5,000 15,000 10,000 15,000 -
Sewer 11,000$ 5,000 11,000 6,000 11,000 -
Storm 6,000$ 5,000 6,000 1,000 6,000 -
Subtotal 47,000$ - -
Project Contingency - -
-$ 20,000 47,000 27,000 - 47,000
Total Expense 247,881$ 8,828 40,000 175,000 227,881 247,881 8,828
Pacific Street is currently a gravel street. The street also is part of the Valley Trail leading from Kah Tai to Fort Worden. This project includes the construction of a 16’ wide asphalt shared-use street on Pacific Avenue between
Tremont Street and Cedar Street. This will connect to and pave the Spruce Street trail easement between Cedar Street and Center Street. Banked capcaity funds make this project possible. Water, Sewer, and Stormwater work will
also be performed prior to construction of the street improvements.
9th St Sidewalk
Project Description
Revenue Project Budget 2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Banked Capacity Transfer In 227,500$ 15,000 35,000 212,500 227,500 -
- -
- -
- -
- -
-
Total Revenue 227,500$ - 15,000 35,000 212,500 - 227,500 -
Expense 2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
- -
- -
- -
Subtotal -$ - - -
Construction -
- -
Street 182,500$ 8,325 30,000 182,500 182,500 8,325
- -
- -
- -
Subtotal 182,500$ - - -
Project Management -
- -
Street 45,000$ 584 15,000 5,000 30,000 45,000 584
- -
- -
- -
Subtotal 45,000$ - -
Project Contingency - -
-$ - -
Total Expense 227,500$ 8,909 15,000 35,000 212,500 227,500 8,909
This project constructs a 6’ wide sidewalk on 9th Street between McPherson Street and the recently finished Complete Streets sidewalk which ends at Hancock Street and connects to Sheridan Street. This project will connect the
business park to Sheridan serving pedestrians in the neighborhood with a continuous sidewalk. Banked Capacity funding makes this project possible.
ADA Lawrence St
Project Description
Revenue Project Budget 2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
-
Banked Capacity Transfer In 60,000$ 5,000 60,000 55,000 60,000 -
- -
- -
- -
Storm Transfer In 15,000$ 15,000 15,000 15,000 -
Total Revenue 75,000$ - 5,000 75,000 70,000 75,000 -
Expense 2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
- -
- -
- -
Subtotal -$ - -
Construction
- -
Street 38,000$ 38,000 38,000 38,000 -
- -
- -
Storm 12,000$ 12,000 12,000 12,000 -
Subtotal 50,000$ - -
Project Management
- -
Street 22,000$ 800 5,000 22,000 17,000 22,800 800
- -
Sewer - -
Storm 3,000$ - -
Subtotal 25,000$ 3,000 3,000 3,000 -
Project Contingency - -
-$ - -
Total Expense 75,000$ 800 5,000 75,000 70,000 75,800 800
The Lawrence American Disabilites Act project provides for improved accessibility to the existing sidewalk network. This project is a high priority for Disability Awareness Starts Here and the City given the intensity of pedestrian
activitng in the center of Uptown and proximity to Farmers Market. This project is made possible with revenues from banked capacity.
Kearney St
Project Description
Project Budget Prior Year
Revenues
2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues
RevenueFederal Grant Funds (STBG)476,900$ 74,390 108,125 402,510 476,900
Real Estate Excise Tax 74,500$ 11,610 16,875 62,890 74,500
-
-
-
-
551,400$ - 86,000 125,000 465,400 551,400 Total Revenue
Prior Year
Expenditures
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
ExpenseDesign Engineering / Permitting
-
Street 86,000$ 81,000 100,000 - 81,000
-
-
-
Subtotal 86,000$ -
Construction
-
Street 465,400$ 463,400 463,400
-
-
-
Subtotal 465,400$ -
Project Management
-
Street -$ 1,528 5,000 25,000 2,000 7,000
-
-
-
Subtotal -$ -
Project Contingency -
-
551,400$ - 86,000 125,000 465,400 551,400
Washington State Department Of Transportation is replacing signals at Mill Road/SR20 and Kearney/SR20 with compact roundabouts at each location. The City secured Federal Surface Transportation Block Grant funds through a
competive process adminstered by Jefferson County. The funds will be used to enhance the WSDOT project with improved pedestrian and bike facilities as well as work on the roundabout approaches. The project was approved
by the City Council on August 16, 2021.
2023 Banked Capacity Street Repair Projects
Project Description
Revenue Project Budget 2022 Actuals 2022 Est. Actual
Revenues
2023 Budget Future Budget Total Revenues
Banked Capacity Transfer In 868,000$ 868,000 868,000
Water Transfer In -$ -
Sewer Transfer In -$ -
Stormwater Transfer In 251,970$ 251,970 251,970
-
Total Revenue 1,119,970$ - - 1,119,970 1,119,970
Expense 2022 Actuals 2022 Est. Actual
Expenditures
2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
Street 130,200$ 130,200 130,200
Storm 62,993$ 62,993 62,993
-
-
Subtotal 193,193$ -$ 193,193$ -$ 193,193 -
Construction -
-
Street 694,400$ 694,400 694,400
Water -$ - -
Sewer -$ - -
Storm 188,977$ 188,977 188,977
Subtotal 883,377$ 883,377 883,377 -
Project Management -
- -
Street 43,400$ - - 43,400 43,400
Water -$ - -
Sewer -$ - -
Storm -$ - -
Subtotal 43,400$ -
Project Contingency -
-$ 43,400 - 43,400
Total Expense 1,119,970$ - 1,119,970 1,119,970
The City proposes to invest up to 868,000 of banked capacity (property tax) into repair of streets. This project will include a number of stormwater management improvements prior to
applying repair treatment to the street.
Discovery Road
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actuals 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Transportation Improvement Board - State Grant (UAP)2,629,618$ 28,211 281,396 2,551,133 50,274 2,629,618 28,211
Washington State Department Of Transportation 1,442,082$ - 37,339 1,442,082 1,442,082 -
Federal Grant Funds STP 621,515$ 265,292 303,468 356,223 159,578 621,515 568,759
Local - Street Funds - Bond 270,000$ 270,000 (123,831) 270,000 270,000
Water Transfer In 240,000$ 776 49,224 180,000 180,000 776
Sewer Tranfer In 115,000$ - 20,000 180,000 180,000 -
Storm Transfer In 250,000$ - 250,000 250,000 -
Total Revenue 5,568,215$ 564,278 620,352 4,762,793 50,274 - 5,573,215 867,746
Expense Prior Year
Expenditures
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
Street 755,854$ 339,058 287,592 416,796 339,058 626,649
Water 34,216$ 34,216 - -
Sewer 13,217$ 13,217 - -
- -
Subtotal 803,287$ - -
Construction
- -
Street 3,322,829$ - 4,030,719 4,030,719 -
Water 190,937$ - 150,000 150,000 -
Sewer 92,877$ - 160,000 160,000 -
Storm 250,000$ - 230,000 230,000 -
Subtotal 3,856,643$ - -
Project Management
- -
Street 197,810$ 259,856 54,603 (123,831) 126,867 386,723 314,459
Water 12,833$ 776 1,649 30,000 30,776 2,425
Sewer 6,242$ 1,523 20,000 20,000 1,523
Storm -$ 98 20,000 20,000 98
Subtotal 216,885$ - -
Project Contingency - -
691,400$ - -
Total Expense 5,568,215$ 599,689 340,398 4,767,586 - - 5,367,275 945,154
The Discovery Road Project includes constructing a bicycle way, sidewalks, and curb ramps between the roundabout at Rainier Street and McClellan Street near Salish Coast Elementary School. The project will
completely rebuild the failing pavement as well. The City received several grants to fund this large project. Discovery Road is an important arterial street connecting SR20 to Fort Worden. The City and
stakeholders evaluated options for this project in the spring of 2021. City Council approved the concept design on May 17, 2021. Construction is anticipated in summer 2022.
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actual
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues
-
Water Rates 200,000$ 200,000 200,000
-
Total Revenue 200,000$ - - - - 200,000 200,000
Expense Prior Year
Expenditures
2022 Actual
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
-
-
-
-
Subtotal -$ -
Construction
-
Water 200,000$ 9,894 200,000 209,894
-
-
-
Subtotal 200,000$ -
Project Management
1,110 1,110
-
-
-
-
Subtotal -$ -
Project Contingency -
-$ -
Total Expense 200,000$ - - 200,000 211,004
Miscelaneous capital repairs and replacment work comes up most years. The rate analysis includes $200,000 per year of miscelaneous and unforeseen capital improvements. These funds also support removal and replacment of
several thousand feet of spaghetti lines (4" or smaller pipes) which are a sources of leaks and system service failures. The city has started replacing 20 year old water meters as well.
OGWS Master Meters
Project Description
Revenue Project Budget Actual 2022 2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Water Operating Transfer In 275,000$ 119,000 155,000 156,000 275,000 119,000
- -
- -
- -
- -
- -
-
Total Revenue 275,000$ - 119,000 155,000 156,000 275,000 119,000
Expense Actual 2022 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
RH2 Contract $44,000 Water 55,000$ 40,551 44,000 42,500 11,000 55,000 40,551
- -
- -
Subtotal 55,000$ - -
Construction*- -
- -
- -
Water 200,000$ 33,109 70,000 107,500 130,000 200,000 103,109
- -
- -
Subtotal 200,000$ - -
Project Management
- -
- -
Water 20,000$ 491 5,000 5,000 15,000 20,000 5,491
- -
- -
Subtotal 20,000$ - -
Project Contingency - -
-$ - -
Total Expense 275,000$ 74,151 119,000 155,000 156,000 275,000 149,151
Accurate metering is necessary to ensure equitable water system cost sharing for the Olympic Gravity Water System operations and asset replacement. Port Townsend Municipal and the Mill water consumption will be individually
metered at the point of delivery, located at the intersection of Mill Road and South 8th Street. Engineering and design for the metering is underway in 2021 and installation of the meters will occur in March 2022 during the annual
paper mill maintenance shutdown.
1 MG Standpipe Coating
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actual
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues
Water Operating Transfer In 850,000$ - 150,000 140,000 710,000 850,000
-
-
-
-
-
-
Total Revenue 850,000$ - - - 150,000 140,000 850,000
Expense Prior Year
Expenditures
2022 Actual
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
-
Water 100,000$ - 140,000 100,000 100,000
-
-
Subtotal 100,000$ - -
Construction -
-
-
Water 710,000$ - 710,000 710,000
-
-
Subtotal 710,000$ - -
Project Management -
-
- 10,000 40,000 40,000
Water 40,000$ -
-
-
Subtotal 40,000$ -
Project Contingency -
-$ -
Total Expense 850,000$ - - - 150,000 140,000 710,000 850,000
The 1-million gallon steel standpipe needs periodic repainting to preserve the structure. The tank has not been recoated since it was constructed in 1995. Engineering and design for painting and corrosion protection is scheduled
for 2022 and repainting in 2023. The project will require taking the standpipe offline for approximately 2 months to sandblast and recoat the tank.
Big Quilcene Main Control Valve Building Replacement
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Water - Olympic Gravity Water System Fund 125,000$ 125,000 - 125,000 -
- -
- -
- -
- -
-
Total Revenue 125,000$ - - - 125,000 125,000 -
Expense Prior Year
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
Water 15,000$ 15,000 15,000 -
- -
- -
- -
Subtotal 15,000$ - - -
Construction*-
General Government - -
- -
Water 100,000$ 100,000 100,000 -
- -
Storm - -
Subtotal 100,000$ - - -
Project Management -
- -
- -
Water 10,000$ 10,000 10,000 -
- -
- -
Subtotal 10,000$ - -
Project Contingency - -
-$ - -
Total Expense 125,000$ - - 125,000 - 125,000 -
As part of the water supply agreement, a capital spending plan was developed to address system long term reliability. Investments in the diversions are anticipated in the long-term plan. The main control vavle buidling at the Big
Quilcene Diversion has experienced significant rot and needs replacing at the request of the operating crew.
Pipeline Condition Assessment - 1928 OGWS Pipeline
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Water - Olympic Gravity Water System Fund 550,000$ 150,000 400,000 550,000 -
- -
- -
- -
- -
-
Total Revenue 550,000$ - - - 150,000 550,000 -
Expense Prior Year
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
Water 425,000$ 125,000 300,000 425,000 -
- -
- -
- -
Subtotal 425,000$ - - -
Construction*-
General Government - -
- -
Water - -
- -
Storm - -
Subtotal -$ - - -
Project Management -
- -
- -
Water 125,000$ 25,000 100,000 125,000 -
- -
- -
Subtotal 125,000$ - -
Project Contingency - -
-$ - -
Total Expense 550,000$ - - 150,000 400,000 550,000 -
As part of the water supply agreement, a capital spending plan was developed to address system long term reliability. Evaluation of the 1928 section of the pipeline is included in the plan to accurately assess the remaining useful
life. This study will guide replacement strategies to ensure water delivery is sustained.
Lords Lake
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Water - Olympic Gravity Water System Fund 72,100$ 100,000 72,100 72,100 -
FEMA Grant - Hazard Mitigation Grant 86,900$ 86,900 86,900 -
- -
- -
- -
-
Total Revenue 159,000$ - - 100,000 159,000 159,000 -
Expense Prior Year
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
Water 129,000$ - 95,000 129,000 129,000 -
- -
- -
- -
Subtotal 129,000$ - - -
Construction*-
General Government - -
- -
Water - -
- -
Storm - -
Subtotal -$ - - -
Project Management -
- -
- -
Water 30,000$ 5,000 30,000 30,000 -
- -
- -
Subtotal 30,000$ - -
Project Contingency - -
-$ - -
Total Expense 159,000$ - 100,000 159,000 - 159,000 -
The City is required to retain an engineering consultant to develop alternatives for improving East Dam stability during possible seismic events. The alternatives will also examine minimizing earthquake-induced embankment
deformations which can lead to uncontrolled release of reservoir contents. The City is applying for a High Hazard Potential Dams Grant in 2021 in order to conduct the engineering study in 2022.
Cathodic Protection - 1928 OGWS Pipeline
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
Water - Olympic Gravity Water System Fund 154,000$ 154,000 154,000 -
- -
- -
- -
- -
-
Total Revenue 154,000$ - - - 154,000 154,000 -
Expense Prior Year
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
Water -$ - -
- -
- -
- -
Subtotal -$ - - -
Construction*-
General Government - -
- -
Water 130,000$ 130,000 130,000 -
- -
Storm - -
Subtotal 130,000$ - -
Project Management Cathodic Protection - 1928 OGWS Pipeline
- -
- -
Water 24,000$ 24,000 24,000 -
- -
- -
Subtotal 24,000$ - -
Project Contingency - -
-$ - -
Total Expense 154,000$ - - 154,000 - 154,000 -
As part of the water supply agreement, a capital spending plan was developed to address system long term reliability. Cathodic protection is a key feature in the system needed to extend the life of the pipeline. Cathodic protection
is missing in the area between the Master meters and south past Otto Street. This project will install a new cathodic system for this section of the pipeline.
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues Actuals To Date
-
Water Rates 200,000$ 200,000 200,000 -
-
Total Revenue 200,000$ - - - 200,000 200,000 -
Expense Prior Year
Expenditures
2022 Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
-
- -
- -
- -
- -
Subtotal -$ - -
Construction
- -
Water 200,000$ 200,000 200,000 -
- -
- -
- -
Subtotal 200,000$ - -
Project Management
- -
- -
- -
- -
- -
Subtotal -$ - -
Project Contingency - -
-$ - -
Total Expense 200,000$ - - 200,000 200,000 -
Miscelaneous capital repairs and replacment work comes up most years. The rate analysis includes $200,000 per year of miscelaneous and unforeseen capital improvements. These funds support pipe replacement, and rehabilation
such as CIPP or slip lining.
Sewer Outfall
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total Revenues
Department of Ecology (ECY) Loan/Grant 408,000$ 408,000 408,000
Department of Ecology (ECY) Loan 3,330,000$ 90,000 90,000 3,240,000 3,330,000
Sewer System Development Charge 200,000$ 92,576 107,424 200,000
Sewer Operating Transfer 170,000$ 11,000 10,000 10,000 149,000 170,000
-
-
-
Total Revenue 4,108,000$ 500,576 11,000 100,000 100,000 3,496,424 4,108,000
Expense Prior Year
Expenditures
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
-
-
Sewer 805,000$ 394,222 2,582 10,000 80,000 80,000 320,778 805,000
-
Subtotal 805,000$ - -
Construction -
-
-
-
Sewer 2,710,000$ 2,710,000 2,710,000
-
Subtotal 2,710,000$ - -
Project Management -
-
-
-
Sewer 403,000$ 92,428 126 1,000 20,000 20,000 289,572 403,000
-
Subtotal 403,000$ -
Project Contingency -
190,000$ 190,000 190,000
Total Expense 4,108,000$ 486,650 11,000 100,000 100,000 3,510,350 4,108,000
This project includes permitting, design and construction to replace or rehabilitate the off-shore portion of the existing wastewater treatment plant outfall system with a new outfall and diffuser. The City has secured Department of
Ecology loans to help construct this project.
General Sewer Plan
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actual
Revenues
2022 Est. Actuals 2022 Budget
Sewer
2023 Budget Future Budget Total Revenues Actuals To Date
Sewer System Development Charge 230,000$ 37,777 100,000 210,000 92,223 230,000 37,777
Interlocal Agreement with Jeff. Co 30,000$ 10,000 20,000 30,000 -
-
-
-
-
Total Revenue 260,000$ 37,777 - 110,000 210,000 112,223 260,000 37,777
Expense Prior Year
Expenditures
2022 Actual
Expenditures
2022 Est. Actuals 2022 Budget
Sewer
2023 Budget Future Budget Total
Expenditures
Actuals to Date
Design Engineering / Permitting
- -
- -
- -
RH2 Contract = 198522+30000 Sewer 230,000$ 27,571 47,566 100,000 180,000 92,223 219,794 75,137
- -
Subtotal 230,000$ - -
Construction -
- -
- -
- -
- -
- -
Subtotal -$ - - -
Project Management -
- -
- -
- -
Sewer 30,000$ 10,206 3,565 10,000 30,000 20,000 40,206 13,771
- -
Subtotal 30,000$ - -
Project Contingency - -
-$ - -
Total Expense 260,000$ 37,777 51,131 210,000 112,223 260,000 88,908
The General Sewer Plan for the City was last updated in 2000. This update involves a signficant review of the entire sanitary sewer system to plan for the next 20 years. The City selected RH2 Engineering in 2021 to complete the plan update in 2022.
The plan will result in an updated Capital Plan as well as project operational needs for operating the sewer system.
Wastewater Nutrient
Project Description
Revenue Prior Year
Revenues
2022 Actuals 2022 Est. Actual
Revenues
2022 Budget
Sewer
2023 Budget Future Budget Total Revenues
Department of Ecology (ECY) Nutrient Grant 160,000$ 160,000 160,000 160,000
Sewer Rates 15,000$ 3,500 11,500 15,000
-
-
-
-
Total Revenue 175,000$ - 3,500 160,000 171,500 175,000
Expense Prior Year
Expenditures
2022 Actuals 2022 Est. Actual
Expenditures
2022 Budget
Sewer
2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
-
-
Sewer 160,000$ 1,655 2,500 155,000 157,500 160,000
-
Subtotal 160,000$ -
Construction
-
-
-
-
-
Subtotal -$ -
Project Management
-
-
Water -
Sewer 15,000$ 98 1,000 5,000 14,000 15,000
-
Subtotal 15,000$ -
Project Contingency -
-$ -
Total Expense 175,000$ - 3,500 160,000 171,500 175,000
The City's Wastewater Treatment Plant does an exceptional job removing nutrients from the waste stream before reclaimed water is released into the Straight of Juan De Fuca. In order to reduce nutrient loading to the Puget
Sound, the Department of Ecology is expected to place new limits on the City's National Pollutant Discharge Elimination System (NPDES) permit. The City will receive a grant to perform a study of the plant to determine what
upgrades are necesary to comply with the new permit.
Project Description
Revenue Project Budget Prior Year
Revenues
2022 Actual
Revenues
2022 Est. Actual
Revenues
2022 Budget 2023 Budget Future Budget Total Revenues
-
Stormwater Rates 50,000$ 5,000 50,000 55,000
-
Total Revenue 50,000$ - - - - 50,000 55,000
Expense Prior Year
Expenditures
2022 Actual
Expenditures
2022 Est. Actual
Expenditures
2022 Budget 2023 Budget Future Budget Total
Expenditures
Design Engineering / Permitting
-
-
-
-
-
Subtotal -$ -
Construction
-
Storm 50,000$ 4,711 5,000 50,000 55,000
-
-
-
Subtotal 50,000$ -
Project Management
54 -
-
-
-
-
Subtotal -$ -
Project Contingency -
-$ -
Total Expense 50,000$ - - 50,000 55,000
Miscelaneous capital repairs and replacment work comes up most years. The rate analysis includes $50,000 per year of miscelaneous and unforeseen capital improvements.
Fund Project Project Budget Actual
Expenditure
Remaining
Budget
Project Status Description
General
Government
ARPA
Pink House 305,000 - 305,000 Architect hired. Work to start fall of 2022
General
Government
ARPA
Library Windows 170,000 197 169,804 Library Windows and Bathroom, goal to start fall
2022.
General
Government
Library Restrooms 33,000 - 33,000 Library Windows and Bathroom, goal to start fall
2022.
General
Government
Chetzemoka Kitchen Shelter 100,000 - 100,000 Reaching out to contractors regarding the
shelter. Everyone is busy and booked for the
foreseeable future.
General
Government
Sewer
Affordable Housing 6,115,500 1,388,245 4,727,255 Property purchased. Cultural resources 90%
complete. Additional funding requested.
General
Government
ARPA
City Hall Upgrades Phase 3 400,000 - 400,000 Space planning underway. Acoustics and blinds
ordered.
Street
REET
PIF
Sims Way and Boatyard
Expansion Project
370,000 1,376 368,625 The project involves removal of the existing Poplar
trees, expanding the boatyard, and planting new
trees on the south side.
Street
Water \ Sewer
Storm
Pacific & Spruce 247,881 8,828 239,053 Waiting for survey and then can proceed with
design. Most of the Construction is targeted for
next year.
Street
9th St Sidewalk 227,500 8,909 218,591 Waiting for survey and then can proceed with
design. Most of the Construction is targeted for
next year.
Street
Storm
ADA Lawrence St 60,000 800 59,200 Waiting for survey and then can proceed with
design. Most of the Construction is targeted for
next year.
Street
REET
Kearney St 551,400 1,528 549,872 WSDOT contracted to perform design and
construction. On target.
Street
Banked
Capacity
2023 Banked Capacity Street
Repair Projects
1,119,970 - 1,119,970 Public process underway. Design fall of 2022.
Street
Water \ Sewer
Storm
Discovery Road 5,568,215 945,154 4,623,061 Design nearly complete. Bidding date is August.
Working with the grant agencies on the billings and
approval to advertise for bids.
Water
General Water Capital
Replacement, Improvements,
and Repairs
200,000 11,004 188,996 Replacing spaghetti lines. This was left out of the
budget and will be included in the next
supplemental.
Water
OGWS Master Meters 275,000 149,151 125,849 95% complete. Waiting on electrical parts.
Anticipated completion in September.
Water
1 MG Standpipe Coating 850,000 149,151 700,849 On hold.
Water
Big Quilcene Main Control
Valve Building Replacement
125,000 - 125,000 WSDOT is considering canceling the Mill Road
compact roundabout in which case we will cancel
utility crossings.
Water
Pipeline Condition Assessment
- 1928 OGWS Pipeline
125,000 - 125,000 Materials purchased, design complete. Bidding for
October install. Material purchase has been
extremely difficult.
Water
Lords Lake 159,000 - 159,000 Lords Lake Dam Stabilization – Consultant selection
under way.
Sewer
Cathodic Protection - 1928
OGWS Pipeline
154,000 - 154,000 Delays and working thru construction
challenges. The goal is to have this work being done
in August and September.
Sewer
Sewer Outfall 4,108,000 500,358 3,607,642 On hold while collecting flow data to evaluate other
options.
Sewer
General Sewer Plan 260,000 88,908 171,093 General Sewer Plan and Nutrient Study – Underway
Complete in 2023.
Sewer
Wastewater Nutrient 175,000 1,753 173,247 Grant secured. Work in 2023.
Totals 21,394,466 3,255,362 18,139,104
2023 Budget Project Status by Fund 2023 Project
Budget
General Government
Pink House 30,000
Library Windows 100,000
Library Restrooms -
Chetzemoka Kitchen Shelter 92,500
Kah Tai Restrooms 203,400
City Hall Upgrades Phase 3 400,000
Subtotals 825,900
Street
Sims Way and Boatyard Expansion Project 286,000
Pacific & Spruce 82,881
9th St Sidewalk 212,500
ADA Lawrence St 55,000
Kearney St 465,400
2023 Banked Capacity Street Repair Projects 868,000
Discovery Road -
Subtotals 1,969,781
Water
Discovery Road -
Pacific & Spruce 70,000
1 MG Standpipe Coating 140,000
General Water Capital Replacement, Improvements, and Repairs 200,000
OGWS Master Meters 156,000
Lords Lake 159,000
Big Quilcene Main Control Valve Building Replacement 125,000
Pipeline Condition Assessment - 1928 OGWS Pipeline 150,000
Cathodic Protection - 1928 OGWS Pipeline 154,000
Subtotals 1,154,000
Sewer
Discovery Road -
Pacific & Spruce 55,000
2023 General Sewer Capital Replacement, Improvements, and Repairs 200,000
Sewer Outfall 100,000
General Sewer Plan 112,223
Wastewater Nutrient 171,500
Affordable Housing 540,000
Subtotals 1,178,723
Storm
General Stormwater Capital Replacement, Improvements, and Repairs 50,000
ADA Lawrence St 15,000
Discovery Road -
Pacific & Spruce 20,000
2023 Banked Capacity Street Repair Projects 251,970
Subtotals 336,970
TOTALS 5,465,374
Appendix B
Capital Facilities Plan Tables
Capital Facilities Element - Information Technology
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded 86,500 40,000 60,000 60,000 60,000 60,000 366,500
ERP Upgrade, 4-5 year
cycle IT-ERR 70,000 70,000 70,000 70,000 70,000 70,000 420,000
Upgrade Laserfiche ARPA 25,000 25,000
Upgrade SQL Server ARPA 15,000 15,000
-
Subtotal Funded 196,500 110,000 130,000 130,000 130,000 130,000 826,500 -
Unfunded -
Secure WiFi; wiring &
access points for City Hall 30,000 30,000
Chamber upgrades; big
screen, upgrade recording
equipment & cameras 35,000 35,000 70,000
Modernize stairwell switch
room 50,000 50,000
Subtotal Unfunded -$ 115,000 35,000 - - - - - -
Total Projects -$ 311,500 145,000 130,000 130,000 130,000 130,000 826,500 -
Capital Facilities Element - Housing/Econ. Dev
PROJECT NAME Source of
Funds 2,023 2,024 2,025 2,026 2,027 2,028
Total (2023-
2028) 2029+
Funded -
Evans Vista - Plan and
Entitlements Jeff. Co. ARPA 500,000 500,000
Sims Way Gateway and
Boatyard Exp. PIF, REET 150,000 150,000
Cherry Street - Carmel
Building Bond 100,000 100,000
Buildable Lands Inventory Gen Fund 60,000 60,000 60,000
2025 Comprehensive Plan
Update
Grants, Gen
Fund, ARPA 125,000 75,000 75,000
Tech. upgrades: Timely
permit processing ARPA 8,400 20,000 10,000 38,000 20,000
Subtotal Funded $ - 943,400 95,000 75,000 - - 10,000 848,000 80,000
Unfunded -
Economic Development
Downtown Restrooms LTAC, Sewer 500,000 500,000
Thayer Street - Wash. to
Sims LID -
Review and Modify subarea
plans (CP Land Use
Element Implementation
Strategy No. 6). Gen Fund
Electric Vehicle Charging
stations Grants, LTAC
Bikeshare and escooters Grants, LTAC
Water walk - Urban
Waterfont Plan
Gen. Fund,
Grants 100,000 100,000 50,000
Childcare Facility
Resources
EDC contract
Facade Improvement
Grants
Wayfinding and interpretive
heritage signage
improvements (CP Econ.
Dev Implementation
Strategy)250,000 250,000 25,000
Downtown Market Study in
conjunciton with Main Street
Program 100,000 100,000 100,000
Downtown Parking
Management Plan (CP
Economic Development
Implementation Stragey No.
2)
Creative District grants
Olympic Discovery Trail
extension across City
owned property
Evans Vista Development
Marketing 25,000 25,000
seasonal weekday public
produce market at old ferry
dock on Quincy Street 25,000 25,000 5,000
Parking structure feasiblity
study downtown - Urban
Waterfront Plan 200,000 200,000
Identify needs and
cumulative impacts of
private ferry proposals with
adequate parking 50,000 50,000
Place utilities underground
downtown.100,000 100,000
Capital Facilities Element - Housing/Econ. Dev
PROJECT NAME Source of
Funds 2,023 2,024 2,025 2,026 2,027 2,028
Total (2023-
2028) 2029+
Environmental
Sea Level Rise Action Plan
Grants, Gen
Fund 250,000 2,000,000
Work with Port to obtain
grand funding for
stormwater, flood, and
economic development
projects (CP Economic
Development Strategy)50,000 50,000 50,000
Climate Action Committee
Action Plan Support
Marketing and Coordination
with other entities (CP
Economic Development
Implementation Strategy
No.
Housing
Surplus City property for
affordable housing Gen Fund 50,000 50,000 50,000 150,000 300,000
affordable housing and
workforce with infrastructure
grants, Gen
Fund 500,000 500,000 500,000
Establishment of up to two
Tax Increment Financing
Districts REET 500,000 500,000
Support a Community
Housing Land Trust (CP
Housing Element
Implementation Strategy
No. 4)
Gen Fund,
grants 100,000 100,000 200,000 300,000
Audit and adjust zoning
code, design standards and
fees to accomdate a variety
of housing types (CP
Housing Element
Implementation Strategy
No. 2)
Gen Fund,
grants 100,000 100,000 100,000 300,000 100,000
Update Housing
Asessment, Update
Housing Action Plan
Gen fund,
grants 75,000 75,000 150,000 100,000
Review and Modify existing
design criteria (CP Land
Use Element
Implementation Strategy
No. 3)
Gen Fund,
grants 25,000 50,000 100,000 50,000
Accept stock plans for
middle housing, waive plan
review fee Gen Fund 15,000 15,000 15,000 15,000 15,000 15,000 90,000 100,000
Research and develop a
housing incentive program
for new development or
renovation of existing
buildings
Gen Fund,
grants 100,000 100,000 50,000
Explore public-private
renovation project for
Historic District upper floors
to accomodate live/work
housing
Gen fund,
grants 50,000 50,000 100,000 50,000
Open space density
transfers (transfer
development rights)
Gen fund,
grants 25,000 25,000 50,000 25,000
Subtotal Unfunded -$ 115,000 465,000 965,000 115,000 215,000 1,990,000 5,640,000 1,805,000
Total Projects -$ 1,058,400 560,000 1,040,000 115,000 215,000 2,000,000 6,488,000 1,885,000
Capital Facilities Element - Stormwater
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded -$
General Stormwater Capital
(Annual) Rates 50,000 50,000 50,000 50,000 50,000 50,000 300,000
Pacific and Spruce Rates 20,000 20,000
Lawrence Rates 15,000
2023 Banked Capacity
projects storm portion Rates 251,970
Discovery Road Rates 250,000
16th Sheridan to Landes Rates 210,000 210,000
Center Street Rates 400,000 400,000
Lawrence Rates 850,000 850,000
Basin Planning Rates 50,000 50,000
Capital Plan per Rate Model
to 2039 Rates - 2,200,000 -
Subtotal Funded 586,970 260,000 50,000 100,000 450,000 900,000 1,830,000 2,200,000
Unfunded -
Placeholder for Water
Quality Imp. Grants, Rates 500,000 500,000 1,000,000 2,000,000 -
Subtotal Unfunded - - - 500,000 - 500,000 1,000,000 2,000,000
Total Projects 586,970 260,000 50,000 600,000 450,000 1,400,000 2,830,000 4,200,000
Capital Facilities Element - Wastewater/Compost
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
New Outfall Rates, Loan 100,000 3,400,000 3,500,000
Eng. Report for WWTP
Upgrades Rates 140,000 140,000
General Wastewater
(Annual) Rates 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000
Maintenance Holes Rates 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Mill Road Lift Station Rates, Grant 1,700,000 1,700,000
Discovery Road Rates 93,000
Carry forward for Gen.
Sewer Plan Rates 100,000 100,000
Nutrient Study Grant 160,000 160,000
Additional Pickup Rates 40,000
Subtotal Funded 793,000 5,540,000 300,000 300,000 300,000 300,000 7,400,000
-
Unfunded
Pipe under Belt press
replace Rates 150,000 150,000
Mill Road Lift Station Grants, LFC 2,500,000
New Influent PS Coating
System Rates 315,000 315,000
Headworks Plastic Liner
Repair Rates 210,000 210,000
Secondary Clarifier
Mechanism Recoating Rates 350,000 350,000
Concrete Launder Coating Rates 105,000 105,000
Influent Pump Instrument
Replacement Rates 70,000 70,000
PLC Replacement Rates 630,000 630,000
UPS Replacement Rates 14,000 14,000
VFD Replacement Rates 105,000 105,000
Flow Meter Replacement Rates 14,000 14,000
Arc Flash Rates 42,000 42,000
Non-Pot pump rebuild Rates 40,000 40,000 80,000
Emergency Generator for
Monroe Rates, FEMA 400,000
Slip lining of main lines Rates 300,000 300,000 600,000 3,000,000
Placeholder for WWTP
Upgrades
Grants, Loan,
Rates -
Placeholder for Nutrient
System Upgrades Rates -
Kuhn St. House Siding and
Windows Rates 60,000 60,000
Kuhn St. House Deck Rates 10,000 10,000
WWTP expansion land
purchase Rates 1,200,000 1,200,000
Sewer Trunkline extensions
placeholder
Grant, Loan,
LFC, LID 300,000 300,000 300,000 900,000
Inflow removal (ie Lawrence
ST)
Grant, Loan,
Rates 750,000 750,000 5,000,000
COMPOST FACILITY -
Placeholder for expansion Rates, SDC 1,500,000 1,500,000
Placeholder for septic (Jeff
Co.) Jeff. Co., Fees 2,500,000 2,500,000
Placeholder for Mech. Sys.
Repl. Rates 1,000,000 1,000,000
Subtotal Unfunded - 3,935,000 1,620,000 1,600,000 1,350,000 5,000,000 10,605,000 8,000,000
Total Projects 793,000 9,475,000 1,920,000 1,900,000 1,650,000 5,300,000 18,005,000 8,000,000
All items in blue are from the Jacobs Report for the Treatment Plant and the cost is in 2019 number 40% was added to those numbers for today's cost.
We are in the process of updating our 20 year sewer plan and that will show us where we need to look at spending money for the next 20 years.
These evaluations should be included in the SPU
As part of our sewer plan update we are evaluating the entire Compost Facility as to capacity and options.
We will get 20 year spending options from the report.
Capital Facilities Element - Water
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
OGWS Master Water Meter
Installation Rates 175,000 175,000
Pacific & Spruce Rates 70,000 70,000
Water Main Replacements
& Upgrades
Rates
100,000 100,000 200,000 200,000 200,000 200,000 1,000,000 2,000,000
Standpipe Painting and
Corrosion Protection Rates 140,000 750,000 890,000
Discovery Road Rates 190,000
2023 Ford Ranger Adding
New Vehicle Rates 35,000 35,000
Water Meter Replacement
and Upgrades Rates 438,247 321,437 321,437 321,437 1,402,560 321,437
Filter Membrane
Replacement Rates 328,687 328,687
Master Water Plan Update Rates 100,000 100,000 50,000
Subtotal Funded 710,000 850,000 638,247 521,437 850,125 621,437 4,001,247 2,371,437
Unfunded
Solar Roof at Water
Treatment Fac. Grant 750,000
Subtotal Unfunded - - - 750,000 - - - -
Total Projects 710,000 850,000 638,247 1,271,437 850,125 621,437 4,001,247 2,371,437
Capital Facilities Element - Fleet
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
Streets
2023 10yd Dump Truck
Replacing #54
ERR
300,000 300,000
2024 P/U 3/4Ton
Replacing #45
ERR
40,000 40,000
2027 IR Roller Replacing
#41
ERR
60,000 60,000
Bucket Truck Replacing
#52 10% Facilities
ERR
150,000 150,000
Streets/Storm
Grader Replacing #27
ERR
375,000 375,000
2023 Street Sweeper
Replacing #43A
ERR
425,000 425,000
New Holland Mower
Replacing #24
ERR
80,000 80,000
Streets, Sewer, Storm
2024 5yd Dump Truck #70
ERR
300,000 300,000
2024 Ford Ranger
Replacing #77
ERR
35,000 35,000
2025 Ford Ranger
Replacing #18
ERR
35,000 35,000
Streets, Sewer, Storm and
Water Distrbution
2028 Internationa Dump
Replacing #46
ERR
300,000 300,000
Miller Tilt Deck Trailer
ERR
40,000 40,000
Water Distribution
2023 P/U W/Service Body
Replacing #61
ERR
60,000 60,000
2024 Ford Ranger
Replacing #88
ERR
35,000 35,000
2025 Backhoe 310D
Replacing #48
ERR
150,000 150,000
Biosolids
2024 Screen Replacing
#128
ERR
275,000 275,000
2024 F-150 Replacing
#122
ERR
40,000 40,000
2025 F-150 Replacing #55
ERR
40,000 40,000
2027 Mixer
Biosolids
100,000 100,000
2028 Loader Replacing
#151
ERR
250,000 250,000
2026 f-250 Replacing #22
ERR
36,000 36,000
Water Quality
2024 Ford Ranger Crew?
Replacing #67
ERR
38,000 38,000
2025 Ford Ranger
Replacing #152
ERR
35,000 35,000
Sewer Collections
Sewer TV Trailer #10 ERR $ 33,407 $ 33,407
Subtotal Funded 785,000 986,407 635,000 36,000 160,000 630,000 2,932,407 -
Capital Facilities Element - Fleet
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Unfunded
Biosolids 2024 Dump Truck
15 YD Box Replacing
ERR $ 350,000 $ 350,000
WD 2024 Vactor Replacing
#42A
ERR $ 500,000 $ 500,000
Streets/Storm Kick off
Broom
ERR $ 70,000 $ 70,000
S.S.S.WD 544G Loader
Replacing #20
ERR $ 250,000 $ 250,000
Subtotal Unfunded - 1,170,000 - - - - 1,170,000 -
Total Projects 785,000 2,156,407 635,000 36,000 160,000 630,000 4,102,407 -
Capital Facilities Element - General Fund - Fleet
PROJECT NAME Source of
Funds 2,023 2,024 2,025 2,026 2,027 2,028 Total (2023-
2028) 2029+
Funded -
(2) Police Cars
ARPA,
Reserves
170,000
170,000
Subtotal Funded
170,000 - - - - - 170,000 -
Unfunded
(2) Police Cars Replacing
#317 & #314
Reserves 150,000
150,000
(2) Police Cars Replacing
#321 & #328
Reserves
150,000 150,000
(2) Police Cars Replacing
#318 & 300
Reserves
150,000 150,000
(2) Police Cars
Reserves
150,000 150,000
(2) Police Cars
Reserves
150,000 150,000
(2) Police Cars
Reserves
150,000 150,000
Police Fusion Chief Car
Replacing #322
Reserves
30,000 30,000
Police Ford Ranger
Replacing #324
Reserves 35,000
35,000
Police SUV Tahoe
Replacing #329
Reserves
100,000 100,000
Police SUV Escape
Replacing #327
Reserves
30,000 30,000
Police Malibu Replacing
#323
Reserves
30,000 30,000
Parks F-150 Replacing #11
Reserves 35,000
35,000
Parks Cab & Chassis
w/dump Replacing #131
Reserves 50,000
50,000
Parks/Bio/Streets
Kubota/Brush Hog
Reserves
10,000 10,000
Parks Ford Ranger
Replacing #19
Reserves
35,000 35,000
Parks F-250 Replacing
#306
Reserves
40,000 40,000
PWA 2024 SUV or p/u
Replacing #94
Reserves
32,000 32,000
PWA Hybrid or EV
Replacing E1
Reserves
30,000 30,000
PWA Hybrid or EV
Replacing E2
Reserves
30,000 30,000
PWA Explorer Replacing
#303
Reserves
40,000 40,000
Facilities Ford Ranger
Replacing #145
Reserves
35,000 35,000
Facilities Ford Ranger
Replacing #123
Reserves
35,000 35,000
DSD Ford Ranger
Replacing #101
Reserves 35,000
35,000
Library Car? Replacing
#119
Reserves
35,000 35,000
Subtotal Unfunded 305,000 362,000 215,000 285,000 150,000 250,000 1,567,000 -
Total Projects 475,000 362,000 215,000 285,000 150,000 250,000 1,737,000 -
Capital Facilities Element - Streets
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
2023 Banked Cap. Street
Repair
2023 Banked
Capacity 868,000 868,000
Discovery Road
Grants, REET,
Loan, Storm 4,628,127 4,628,127
Pacific and Spruce
2022 Banked
Capacity 82,881 82,881
9th St. Sidewalk
2022 Banked
Capacity 212,500 212,500
Lawrence ADA Upgrades
2022 Banked
Capacity 55,000 55,000
Discovery Rd Grant to
Sheridan HSIP 50,000 183,000 233,000
Kearney Street
STP Federal
Funds 465,400 465,400
-
Subtotal Funded 6,361,908 183,000 - - - - 6,544,908 -
Unfunded
Annual Rehab. and
Preservation
TBD, Prop. Tax,
Gen. Fund 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,000,000 14,000,000
Six Year Trans. Imp. Plan
Grants, Gen.
Fund,300,000 1,070,000 1,824,000 1,874,000 81,809,000 86,877,000
-
Subtotal Unfunded - 1,300,000 2,070,000 2,824,000 2,874,000 82,809,000 91,877,000 14,000,000
Total Projects 6,361,908 1,483,000 2,070,000 2,824,000 2,874,000 82,809,000 98,421,908 14,000,000
Capital Facilities Element - Facilities
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
Library Windows and
Restroom Rehab
Grant, Bond,
ARPA 352,000 352,000
Facilities Strategic
Management Plan ARPA 75,000 75,000
City Hall Space Upgrades
Phase III, & Carpet 1,3 floor ARPA 400,000 400,000
-
Subtotal Funded 827,000 - - - - - 827,000 -
Unfunded
Mountain View
Mountain View Campus
Assessment
Gen Fund,
REET 30,000 30,000
Mountain View Campus
Redevelopment
Gen Fund,
Bond, Grant 10,000,000 10,000,000
Mountain View Pool Roof
Assessment
Gen Fund,
REET 10,000 10,000
Mountain View Pool Roof
Replacement
Gen Fund,
REET 200,000 200,000
Mountain View Pool Liner
Replacement
Gen Fund,
REET 75,000 75,000
Mountain View Boiler Pipe
Replacement
Gen Fund,
REET 1,000,000 1,000,000
Mountain View Parking Lot
Resurfacing
Gen Fund,
REET 150,000 150,000
City Hall -
City Hall Phase Space
Upgrades IV
Gen Fund,
REET 500,000 500,000
City Hall Elevator
Replacement (1)
Gen Fund,
REET 200,000 200,000
City Hall Carpet
Gen Fund,
REET -
Exterior Brick and Mortar
Work
Gen Fund,
REET 75,000 75,000
City Hall Roof
Gen Fund,
REET 250,000 250,000
Library -
Charles Pink House Roof
Assessment
Gen Fund
-
Charles Pink House
Siding/Roof/Gutters/Porch
Gen Fund,
REET 250,000 250,000 60,000
Library HVAC Upgrades
Gen Fund,
REET 200,000 200,000
Library Elevator
Replacement (1)
Gen Fund,
REET 200,000 200,000
Pope Marine Buidling
Siding
Gen Fund,
REET 60,000 60,000
Public Works Shops
Gen Fund,
REET
PW City Shop Predesign
Gen Fund,
REET 250,000 250,000
PW City Shop Maintenance
Buildings
Gen Fund,
REET - 15,000,000
Bell Tower Repairs/Painting
Gen Fund
15,000 15,000
Cotton Building
Cotton Building Roof
Assessment
Gen Fund,
REET 2,000 2,000
Cotton Roof Replacement
Gen Fund,
REET 75,000
Cotton Sound Control
Gen Fund,
REET 100,000 100,000
Water Barn Repairs
Gen Fund,
REET 100,000
Land
Gen Fund,
REET
Art
Gen Fund,
REET
Capital Facilities Element - Facilities
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Energy Retrofits
Gen Fund,
REET
Subtotal Unfunded 40,000 267,000 10,360,000 525,000 650,000 1,900,000 13,567,000 15,060,000
Total Projects 867,000 267,000 10,360,000 525,000 650,000 1,900,000 14,394,000 15,060,000
Capital Facilities Element - Parks
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
Chetzemoka Kitchen
Shelter
ARPA,
Donations
100,000
100,000
Kah Tai Nature Park
Redevelopment RCO, REET
23,500
23,500 47,000
Golf Course Master Plan REET2
125,000
125,000
Community Health and
Wellness Center (Pool)
RCO, REET,
Bond,
30,000
30,000
Subtotal Funded
278,500 23,500 - - - - 302,000 -
Unfunded
Community Health and
Wellness Center (Pool)
RCO, REET,
Bond, 50,000 10,000,000 10,050,000
Chetzemoka Park
Chetzemoka Master
Planning
Gen Fund
40,000
Chetzemoka Slope Erosion
and ADA Repairs
RCO, REET,
Bond, - 500,000
Chetzemoka Open Air
Shelter Replacement
Gen Fund
100,000 100,000
Chetzemoka Restroom
Replacement
Gen Fund
250,000 250,000
Chetzemoka Maintenance
Shop Replacement
Gen Fund
300,000 300,000
Bobby McGarraugh Park
Bobby McGarraugh Park
Master Plan
Gen Fund 25,000
25,000
Bobby McGarraugh Park
Revitalization
RCO, REET,
Bond, 400,000 400,000
Golf Course -
Golf Course Revisioning
and Redevelopment
RCO, REET,
Bond, 2,000,000 2,000,000 2,000,000 6,000,000
Adams Street Park Irrigation
Replacement -
Bishop Park -
Bishop Park Master
Planning
Gen Fund
25,000 25,000
Bishop Park
Redevelopment/ Sims Way
RCO, REET,
Bond, 500,000 500,000
Howards End Trail/ Wet
Lands -
Howards End Master
Planning
Gen Fund
25,000 25,000
Howards End
Redevelopment
RCO, REET,
Bond, 200,000
Skate Park Resurfacing
Gen Fund
- 350,000
Tyler Street Stairs Railing
Replacement
Gen Fund 20,000
20,000
35th Street Park
35th Street Park Master
Planning
Gen Fund 25,000
25,000
35th Street Redevelopment
RCO, REET,
Bond, 300,000 300,000
Haller Stairs Landscape and
Tree Removal
Gen Fund 50,000
50,000
Dog Park Improvements
RCO, REET,
Bond, 350,000
Land/Park Aquisiton
Opportunity Fund
RCO, REET,
Bond, 50,000 50,000 50,000 50,000 50,000 250,000 5,000,000
Buildable Lands & Open
Space Plan
Gen Fund 50,000
Subtotal Unfunded - 2,260,000 10,725,000 3,000,000 50,000 2,675,000 18,320,000 6,050,000
Total Projects 278,500 2,283,500 10,725,000 3,000,000 50,000 2,675,000 18,622,000 6,050,000
Capital Facilities Element - OGWS
PROJECT NAME Source of
Funds 2023 2024 2025 2026 2027 2028
Total (2023-
2028)2029+
Funded
Pipeline and Appurtenances
Easement Survey Marking
(2042)
Raw Water
Rates - 96,882
Vegetation clearing -
contracted
Raw Water
Rates 79,877 79,877 223,728
Road maintenance
Raw Water
Rates - 81,195
Culvert replacement (5
culverts per 5 years)
Raw Water
Rates 29,264 29,264 121,294
Land swaps - easement
right purchases (2051)
Raw Water
Rates 249,338 249,338
Air Valves and Boxes (25)
Raw Water
Rates 146,322 146,322
Pipeline Condition
Assessment
Raw Water
Rates 150,000 399,552 549,552
Cathodic Protection
Raw Water
Rates 154,428 154,428
Steel Pipe Replacement
(1928) Phase 1 (High
Raw Water
Rates 800,000 800,000 1,600,000 27,312,803
Steel Pipe Replacement
(1928) Phase 2
Raw Water
Rates - 21,412,839
Install Drain Valve at
Woodsman Gulch
Raw Water
Rates 8,000
Reservoirs
Lords Lake Security
Cameras
Raw Water
Rates 1,800 1,800
Lords Lake Seismic
Assessment
Grant, Raw Water
Rates 159,000 159,000
Lords Lake East Dam
Rehabilitation
Grant, Raw
Water Rates 200,000 200,000 4,448,177 4,848,177
City Lake Fencing
Replacement (2041)
Raw Water
Rates - 187,756
Lords Lake Fencing
Replacement (2041)
Raw Water
Rates - 187,756
City Lake House and
Outbuildings (2036)
Raw Water
Rates - 982,182
Diversions
Replacement of Control
Valve Building and Control
Raw Water
Rates 125,000 125,000
Big Quilcene Diversion
House and Buildings (2036)
Raw Water
Rates - 678,300
Equipment
Tractor and Implement
Replacement
Raw Water
Rates 49,000 49,000
Truck Replacement (3)
Raw Water
Rates 148,000 148,000
Spare Parts
Pipe (4 sections 24"
diameter, 1/4" thick, 20'
Raw Water
Rates 22,962 22,962
Pipe (4 sections 30"
diameter, 1/4" thick, 20'
Raw Water
Rates 34,454 57,416 91,870
Subtotal Funded 784,521 656,969 348,000 4,623,763 800,000 1,049,338 8,254,591 51,284,735
Unfunded
Develop Hydro Generator
for Big Quilcene Residence 20,000
Subtotal Unfunded 20,000
Total Projects 804,521 656,969 348,000 4,623,763 800,000 1,049,338 8,254,591 51,284,735
Department
Funded
(2023-2028)
Unfunded
(2023-2028)2029+
Facilities (Buildings) 827,000$ 13,567,000$ 15,060,000$
Parks and Recreation 302,000$ 18,320,000$ 6,050,000$
Water 4,001,247$ -$ 2,371,437$
OGWS 8,254,591$ -$ 51,284,735$
Wastewater 7,400,000$ 10,605,000$ 8,000,000$
Stormwater 1,830,000$ 1,000,000$ 4,200,000$
Transportation (Streets) 6,544,908$ 91,877,000$ 14,000,000$
Fleet 2,932,407$ 1,170,000$ -$
General Fund (Fleet) 170,000$ 1,567,000$ -$
Information Technology 826,500$ -$ -$
Housing Economic Development 848,000$ 5,640,000$ 1,885,000$
Totals 33,937,000$ 143,746,000$ 102,852,000$
Appendix C
Six Year Transportation Improvement Program
Six Year Transportation Improvement Program (2023 - 2028)County Name Jefferson County
Port Townsend MPO/RTPO:NON/PEN
Co. No.:16
City No.:1005
Fund Source Information Expenditure Schedule
Fu
n
c
t
i
o
n
a
l
C
l
a
s
s
Pr
i
o
r
i
t
y
N
u
m
b
e
r
Project Pr
o
j
e
c
t
L
e
n
g
t
h
Ph
a
s
e
Ph
a
s
e
S
t
a
r
t
Y
e
a
r
Fu
n
d
i
n
g
S
t
a
t
u
s
Federal
Fund
Code
Federal
Funds
State Fund
Code State Funds Local Funds 1st 2nd 3rd 4th 5th 6th En
v
i
r
o
n
m
e
n
t
T
y
p
e
RW
R
e
q
u
i
r
e
d
16 Discovery Road Bikeway, Roadway and Sidewalk Project0.82 CN 2022 S Ped/Bike 1,442,082 4,544,671 CE N
from: Rainier Street to: Sheridan Street TIB 2,262,589 840,000
Rebuild roadway, sidewalks, drainage, shoulder improvements,
bike lanes
14 Kearney Street Intersection 0.10 ALL 2023 S 74,365 WSDOT 11,635 86,000 CE N
from: Kearney Street to: Washington Street 402,535 62,865 465,400
Intersection improvements
14 Sims Way (SR 20) Intersection Improvements 0.10 ALL 2023 P WSDOT 1,500,000 - 1,500,000 CE N
from: Kearney Street to: Washington Street
Intersection improvements less compact roundabout
contructed in 2023
9th Street Sidewalks ALL 2023 S 225,000 225,000 CE N
from: Hendricks to: McPherson
Funded in 2022 throught Banked Capacity. Continuation of
sidewalk
Pacific and Milo ALL 2023 S 80,000 80,000 CE N
from: Tremont to: Cedar
Funded in 2022 throught Banked Capacity. Pave existing gravel
road as part of the Loop Trail and fix drainage problems.
Lawrence and Blaine ADA Improvements ALL 2023 S 75,000 75,000 CE N
from: to:
Funded in 2022 throught Banked Capacity. Fix ADA ramps at
Tyler Street and near Mountain View at Blaine Street
14 Bank Capacity - Various projects ALL 2023 P 1,362,000 454,000 454,000 454,000 CE N
from: to:
Per Res 18-062, Non-fed aid and Non motorized plan are only
eligible projects
16 Admiralty - San Juan Improvements 0.26 ALL 2028 P 1,520,000 380,000 1,900,000 CE N
from: 49th Street to: Spruce Street
Shoulder improvements, sidewalk, bike lanes, drainage
0 Local Safety Plan/HSIP Projects - Various Locations ALL 2024 P HSIP 900,000 300,000 300,000 300,000 CE N
from: to:
See Local Road Safety Plan - Traffic calming, intersection
improvements, sidewalks, separated bike facilities, signing,
striping, crosswalks
16 SR 20 Pedestrian Walkway 0.14 ALL 2028 P WSDOT 1,760,000 440,000 2,200,000 CE Y
from: Logan Street to: Hancock Street
Construction of an elevated walkway over a ravine that is an
800' gap along a popular, heavily used route by both
pedestrians and bicyclists.
0 19th - Blaine 0.90 ALL 2028 P 5,200,000 1,300,000 6,500,000 CE N
from: Sheridan to: Walker
Traffic calming, intersection improvements, sidewalks,
separated bike facilities
16 Discovery Road Improvements III 0.80 ALL 2028 P Safe Route 2,250,000 3,500,000 CE N
from: San Juan Avenue to: 19th Street TIB Urban 1,000,000 250,000
Rebuild roadway, shoulder improvements, bike lanes,
sidewalks, drainage, intersection improvements
1
2
11
9
3
8
4
5
6
7
10
12
7/6/2022 1 of 4
Six Year Transportation Improvement Program (2023 - 2028)County Name Jefferson County
Port Townsend MPO/RTPO:NON/PEN
Co. No.:16
City No.:1005
Fund Source Information Expenditure Schedule
Fu
n
c
t
i
o
n
a
l
C
l
a
s
s
Pr
i
o
r
i
t
y
N
u
m
b
e
r
Project Pr
o
j
e
c
t
L
e
n
g
t
h
Ph
a
s
e
Ph
a
s
e
S
t
a
r
t
Y
e
a
r
Fu
n
d
i
n
g
S
t
a
t
u
s
Federal
Fund
Code
Federal
Funds
State Fund
Code State Funds Local Funds 1st 2nd 3rd 4th 5th 6th En
v
i
r
o
n
m
e
n
t
T
y
p
e
RW
R
e
q
u
i
r
e
d
14 Sims Way Improvements III 0.73 ALL 2028 P WSDOT 800,000 200,000 1,000,000 CE N
from: SR 20 Ferry Terminal to: Benedict
Turn lanes, shoulder improvements, intersection
improvements, bike lanes, transit pullouts, sidewalks,
mitigation of ferry traffic impacts
14 Sims Way Improvements Port 0.26 2023 P WSDOT 1,000,000 500,000 500,000 1,000,000 CE N
from: Benedict Street to: Haines
Turn lanes, shoulder improvements, intersection
improvements, bike lanes, transit pullouts, sidewalks
14 Sims Way Improvements II 0.59 2028 P WSDOT 480,000 120,000 600,000 CE N
from: Haines Street to: Sheridan St
Turn lanes, shoulder improvements, intersection
improvements, bike lanes, transit pullouts, sidewalks
14 Washington Street 0.30 PE 2027 P 350,000 350,000 CE N
from: Monroe Street to: Taylor Street CN 2028 P 1,600,000 400,000 2,000,000
Streetscape improvements; new curb, gutter, pavement,
sidewalk repair and replacement
16 Discovery Road II 0.74 PE 2028 P OTHER 300,000 200,000 500,000 CE N
from: City Limits to: Rainier Street CN 2028 P OTHER 3,000,000 300,000 3,300,000
Rebuild roadway, bike lanes, sidewalks, pathway, drainage,
intersection improvements
16 San Juan Improvements II 0.75 ALL 2028 P 1,360,000 340,000 1,700,000 CE N
from: Lopez & San Juan to: 49th & Jackman
Grind and install new road surface. Replace utility lines.
Sidewalk and bike lanes.
16 Jackson / Walnut Improvements 0.45 ALL 2028 P 800,000 200,000 1,000,000 CE N
from: Reed Street to: W Street
Shoulder improvements, overlay, drainage improvements,
sidewalks
16 Lawrence Street Improvements 0.50 ALL 2028 P 1,200,000 300,000 1,500,000 CE N
from: Kearney Street to: Harrison Street
Grind, base upgrade, repave, sidewalks, shoulder
improvements, ADA upgrades
16 Monroe Street Improvements 0.22 ALL 2028 P 800,000 200,000 1,000,000 CE N
from: Washington Street to: Lawrence Street
Address road settlement, re-do subgrade, repave
16 McPherson Street Improvements 0.57 ALL 2028 P 1,440,000 360,000 1,800,000 CE N
from: Sims Way SR 20 to: Discovery Road
Roadway rebuild, sidewalks, bike lanes
16 Blaine Street Improvements 0.50 ALL 2028 P 800,000 200,000 1,000,000 CE N
from: Walker Street to: Tyler Street
Sidewalk, shoulder improvements, drainage, curb and gutter
00 Non-Motorized Multi Modal Loop Trail 1.94 ALL 2028 P OTHER 500,000 200,000 700,000 CE N
from: Kearney Street to: Discovery Rd
Loop trail as identified in Non-Motorized Transportation Plan
22
23
24
21
16
15
13
14
17
18
20
19
7/6/2022 2 of 4
Six Year Transportation Improvement Program (2023 - 2028)County Name Jefferson County
Port Townsend MPO/RTPO:NON/PEN
Co. No.:16
City No.:1005
Fund Source Information Expenditure Schedule
Fu
n
c
t
i
o
n
a
l
C
l
a
s
s
Pr
i
o
r
i
t
y
N
u
m
b
e
r
Project Pr
o
j
e
c
t
L
e
n
g
t
h
Ph
a
s
e
Ph
a
s
e
S
t
a
r
t
Y
e
a
r
Fu
n
d
i
n
g
S
t
a
t
u
s
Federal
Fund
Code
Federal
Funds
State Fund
Code State Funds Local Funds 1st 2nd 3rd 4th 5th 6th En
v
i
r
o
n
m
e
n
t
T
y
p
e
RW
R
e
q
u
i
r
e
d
19 10th Street 0.33 ALL 2028 P 480,000 120,000 600,000 CE N
from: SR 20 to: Sheridan
Sidewalks, bike lanes, drainage, shoulders
16 12th Street 0.38 ALL 2028 P 560,000 140,000 700,000 CE N
from: Landes to: Sheridan
Sidewalks, shoulders, drainage improvements
16 14th Street 0.82 ALL 2028 P 1,200,000 300,000 1,500,000 CE N
from: Landes to: McPherson
Sidewalks, shoulders, drainage improvements
16 Cherry / Redwood Improvements 0.80 ALL 2028 P 1,200,000 300,000 1,000,000 CE N
from: F St to: W St
Shoulder improvements, overlay, drainage improvements
16 49th Street / Cook Ave Improvements 2.00 ALL 2028 P 960,000 240,000 1,200,000 CE N
from: Jackman Avenue to: City Limits
Shoulder widening, drainage improvements, pavement overlay,
bike and pedestrian accommodations
16 W Street Improvements 0.70 ALL 2028 P 1,200,000 300,000 800,000 CE N
from: Walnut Street to: Admiralty Avenue
Shoulder widening, overlay, drainage improvements, sidewalks
16 Lawrence 0.46 ALL 2028 P 2,800,000 700,000 3,500,000 CE N
from: Monroe to: Harrison
Road rebuild (roadway, drainage, sidewalks, bikeways)
16 Washington II 0.64 ALL 2028 P 4,400,000 1,100,000 5,500,000 CE N
from: Taylor to: Sims Way
Pavement preservation, traffic calming, sidewalks
16 Monroe 0.30 ALL 2028 P 3,600,000 900,000 4,500,000 CE N
from: Roosevelt to: Reed
Road rebuild
16 Sheridan Street 0.25 ALL 2028 P 560,000 140,000 700,000 CE N
from: 10th St to: 15th St
Sidewalks, bike lanes
16 Water Street 0.12 2028 P 1,200,000 300,000 1,500,000 CE N
from: Taylor St to: Quincy St
Road improvements, ADA ramps, drainage improvements
16 Washington Street 0.30 2028 P 1,600,000 400,000 2,000,000 CE N
from: Sims Way to: Benedict
Sidewalks, pavement preservation
16 Water Street 0.11 2028 P 640,000 160,000 800,000 CE N
from: Sims Way to: Gaines St
Sidewalks, pavement preservation
34
25
26
27
28
29
30
35
36
37
31
32
33
7/6/2022 3 of 4
Six Year Transportation Improvement Program (2023 - 2028)County Name Jefferson County
Port Townsend MPO/RTPO:NON/PEN
Co. No.:16
City No.:1005
Fund Source Information Expenditure Schedule
Fu
n
c
t
i
o
n
a
l
C
l
a
s
s
Pr
i
o
r
i
t
y
N
u
m
b
e
r
Project Pr
o
j
e
c
t
L
e
n
g
t
h
Ph
a
s
e
Ph
a
s
e
S
t
a
r
t
Y
e
a
r
Fu
n
d
i
n
g
S
t
a
t
u
s
Federal
Fund
Code
Federal
Funds
State Fund
Code State Funds Local Funds 1st 2nd 3rd 4th 5th 6th En
v
i
r
o
n
m
e
n
t
T
y
p
e
RW
R
e
q
u
i
r
e
d
0 City Wide Sidewalks/ADA/Multi Use Trail ALL 2025 P 200,000 50,000 50,000 50,000 50,000 CE N
from: to:
City wide sidewalks/ADA/enhanced crossings/multi-use trail.
0 Pavement preservation City Wide ALL 2025 P 4,000,000 1,000,000 1,000,000 1,000,000 1,000,000 CE N
from: to:
0 Neighborhood Traffic Calming ALL 2025 P 80,000 20,000 20,000 20,000 20,000 CE N
from: to:
0 Non-Motorized Plan Update ALL 2028 P 100,000 100,000 CE N
from: to:
City wide sidewalks/ADA/enhanced crossings/multi-use trail.
0 Downtown Parking Plan ALL 2028 P 100,000 100,000 CE N
from: to:
0 ADA Transition Plan ALL 2028 P 35,000 35,000 CE N
from: to:
0 47th Street Improvements 0.10 ALL P 600,000 150,000 750,000 CE N
from: San Juan Ave to: Pettygrove Street
Non-motorized improvements connecting to the Fairgrounds
16 Hastings Avenue Improvements 1.60 ALL 2028 P 9,200,000 2,300,000 11,500,000 CE N
from: Discovery Road to: City Limits
Shoulder widening, bike lanes, pavement overlay, drainage
improvements, sidewalks or multi use pathway
14 Mill Road Intersection Improvements 0.03 ALL 2028 P WSDOT 10,000,000 10,000,000 CE Y
from: Discovery Rd to SR20/Jacob Miller
Intersection improvements including Jacob Miller. Partnership
with the Coutny
16 Rainier Street Extension III 0.10 ALL 2028 P 640,000 160,000 800,000 CE N
from: Water Treatment Facility to: 20th Street
New street extension through water plant
Total Federal Total State Total Local
1,376,900 71,854,671 21,121,500
44
42
43
7/6/2022
41
38
39
40
45
47
46
7/6/2022 4 of 4