Geotechnical Evaluation of SloPe
Stability and Sife DeveloPment
Solvik ProPertY
(Lots 2 and 4, Block 6,
Pettyg rove's F i rst Add iti o n)
Port Townsend, Was hi ngton
February 1998
B en t:,k-li t-'
;$ii - e.li""lJ
Mr. Sven Solvik
2624 Northeast Skidmore
Portand, Oregon 97211
ill
-
SI{ANNONAWLSON, ING
GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS
400 N. 34th St. ' Suite 100
P.O. Box 300303
Seattle, Washington 98103
'632 .8020
I
)
)
zrfu) UlV" '|@7rr#"b ,.F i,t'!r 4sta
-t
I
I
=
I l t "s. "mNoN f?Wtt{FpN, I NF,,
SEATTLE
HICHLAND
FAIRBANKS
ANCHORAGE
SAINT LOUIS
BOSION
II
1J
l
I
^.{
I
February 20, L998
Sven Solvik
2624N.8. Skidmore
Portland, Oregon 972tL
RE: GEOTECHNICAL EVALUATION OF SLOPE STABILITY AI\D SITE
DE\ZELOPMENT, SOLYTK PROPERTY (LOTS 2 AND 4, BLOC!( 6,
PETTYGROVE' S FIRST ADDITION), PORT TOWNSEI\ID, WASHINGTON
Dear Mr. Solvik:
This letter summarizes our observations made during a site reconnaissance, and our conclusions
and recommendations for the proposed residential development at the above site. The purpose of
our work was to evaluate the stability of the site as required by the City of Port Townsend's
Environmentally Sensitive Areas ordinance for steep slopes and provide geotechnical
recommendations for the residential development of the site. Our work was conducted in
accordance with our proposal dated January 29, 1998, as authorized by you on January 30, 1998.
SITE AND PROJECT DESCRIPTION
The site is situated on the west side and lower reaches of Morgan Hill in Port Townsend,
Washington, at the southwest corner of Fir Street and H Street (cunently vacated). The property
is approximately 100 feet wide (north-south) by 100 feet long (east-west) and slopes fromFir
Street down to the west. The slopes along the north and south property lines were measured with
an abney level and found to be approximately 11 degrees (19 percent). We understand that you
plan to construct an approximately 27-foot wide (north-south) by 38-foot long (east-west), three
story residence with a basement that daylights out to the west on this site.
A small, single story cottage, approximately 20 feet wide (north-south) by 15 feet long (east-
wes| is located on the northwest corner of the site. The remainder of the property is vegetated
with small, deciduous trees (typically l6-inch diameter or less) and shrubs, including wild rose
bushes which are indicative of relatively well drained soil conditions. Three fir trees, which are
up to about 2 Yz feet in diameter, are located along the west property line. A bowed trunk on one
of these firs is indicative of some slight soil creep. Soil creep, which is present on most hillsides,
is the imperceptibly slow downslope movement of soils under the effects of gravity.
r/4OO NORTH 34TH STREET.SUITE 1OO
PO. BOX 300303
SEATTLE, WASHINGTON 981 03206'632'8020 FAX 206.633.6777
TDD: 1.800.833.6388
!J
w-8242-01
Mr. Sven Solvik
February 20,1998
Page2
SHANNON EWLSON,INC.
No springs, seeps or other indications of near surface groundwater were observed at the site
during our site visit.
Geologic maps of the area indicate that the site is underlain by Vashon lodgment till. Till is a
nonsorted mixture of clay, silt, sand, and gravel with scattered cobbles and boulders deposited by
a glacier. Lodgment till is deposited at the base of a glacier and is subsequently overridden by
the advancing glacier. The Vashon Ice sheet that deposited the lodgment till is estimated to have
been up to 4,000 feet thick in the area and, as a result, the till and underlying soils have been
overconsolidated to a very dense or hard state due to the great weight of the ice. While it is
likely that this site is underlain by the till mapped in this area, no subsurface explorations were
performed at the site confirm its presence or depth.
With time, the surface of the till weathers and topsoil develops from the weathered till. The
combined thickness of the topsoil and weathered till above the very dense unweathered till is
typically about 3 to 6 feet (subsurface explorations would be required to further evaluate the
depth to the unweathered till at this site). The United States Department of Agriculture
(USDA)/Soil Conservation Service Soil Survey for Jefferson County indicates that the topsoil is
a Clallam Series gravelly sandy loam and is described as well drai,ned with only a moderate
erosion hazard on slopes between 15 and 30 percent. l
CONCLUSIONS AND RECOMMENDATIONS
Slope Stability
Based on our observations, it is our opinion that the existing slope on the site is relatively stable
and that the risk of future slope instability affecting the proposed residence will be relatively low
provided the following recommendations contained in this letter are implemented. Our opinion
is based on the following:
' No signs of slope instability (e.g., slide scarps, jack-strawed trees) were observed at
the site.
The slopes are relatively gentle at about 11 degrees or 19 percent.
w-8242-0r
Mr. Sven Solvik
February 20,1998
Page3
SFIqNNCN SWLSON,INC.
The till mapped beneath the site is typically very dense with a relatively high shear
strength and resistant to slope movement.
Near surface groundwater, which often increases the risk of slope instability, does not
appear to be present at the site, based on the vegetation at the site that is indicative of
well drained conditions, and no observation of springs or seeps.
The USDA soil map indicates the surficial soils are well drained with only a moderate
erosion potential. i
Please note that there is present on all slopes, such as those on this site, some risk of future
instability that the owner must be prepared to accept. Such instability could occur because of
future water breaks/leaks, uncontrolled drainage, unwise development in adjacent areas, or other
actions or events on a slope that may cause sliding.
Foundations
We recommend that the footings for the residence bear in the very dense till that presumably
underlies the site and not in the topsoil or weathered material. By locating the footings in the
very dense till, the risk to the residence from potential future soil creep or sliding of the topsoil
and weathered till can be reduced. In addition, spread footings for lightly loaded structures
(including residences) bearing in very dense till typically perform well and are not subject to
significant differential settlements. As previously indicated in this letter, the depth to the very
dense, unweathered till that presumably underlies this site is typically 3 to 6 feet; however
subsurface explorations would be required to further evaluate the depth to the unweathered till at
this site.
While the very dense till will typically provide adequate bearing, it is commonly moisture-
sensitive and may become muddy, unstable and erodable under wet conditions and subjected to
construction traffic. We, therefore, recommend that excavations and footing construction be
conducted during dry weather. In western Washington, May through mid-October are considered
dry weather months. Excavation during wet weather requires extra care and usually results in
greater expenditures. The judicious use of straw bales and silt fences on the down slope side of
the excavations may also be used to further reduce erosion during construction.
w-8242-01
Mr. Sven Solvik
February 20,1998
Page 4
SHANNON SWLSON,INC.
Drainage
As previously noted, groundwater in soils on a slope often increases the risk of slope instability'
Therefore, whatever measures can be taken to reduce the amount of water in the soils on the
slope will have a positive impact on the stability of the slope. In additioq adequate drainage
around the structure will reduce the potential for basement leaks and water beneath crawl spaces.
We recommend that footing drains be installed along the outside perimeter of the structure.
Footing subdrains should consist of slotted, 4-inch-diameter, plastic pipe bedded in washed 3/8-
inch pea gravel. Weep holes should be provided through the down slope exterior footings (west
side of the house) to provide a pathway for water that may occur beneath the house to drain to
the exterior footing drains. Typical installation of these drains is shown on Figure 1"
Roof drains should not be connected to the footing subdrains. The discharge from footing drains
and roof drains should be collected and routed by means of a tightline to suitable discharge point
(e.g., street ditch, storm sewer). Water should not be allowed to discharge onto the surface of the
slope. All hard surfaces adjacent to the structures should be sloped to catch basins and the
collected water disposed of as previously outlined. All outside grades should be sloped away
from the structures.
The need to reduce the water entering the topsoit on the site should be considered in developing
landscape plans and planting. Landscaping and plants that do not need more water than typically
occurs naturally should be used. Plants that require extensive irrigation should not be used.
Additional Considerations
We recommend that we be retained to review those portions of plans and specifications
pertaining to earthwork and foundations to confirm that they are consistent with our
recommendations. We also recommend that we be retained to monitor earthwork, including
placement of drains and subgrade preparation for foundations. In this regard, it may be
advantageous to have us complete explorations on the site to confirm the presence of till and its
depth at the proposed location of structure.
w-8242-01
Mr. Sven Solvik
February 20,1998
Page 5
SHANNON &WLSON,INC.
LIMITATTONS
The conclusions and recommendations in this letter are based on site conditions observed during
our site visit and assume that observed conditions are representative of the subsurface conditions
throughout the site; i.e., the subsurface conditions are not significantly different from those
observed during our site reconnaissance or indicated on geologic and soil maps. I[, during
construction, subsurface conditions different from those inferred in this letter are observed or
appear to be present, we should be advised at once so that we can review those conditions and
reconsider our recommendations where necessary. If there is a substantial lapse of time between
submission of our report and the start of work at the site, we recommend that this report be
reviewed to determine the applicability of the conclusions and recommendations, considering the
changed conditions and/or elapsed time.
Within the limitations of scope, schedule, and budget, the analyses, conclusions, and
recommendation presented in this report were prepared in accordance with generally accepted
professional geotechnical engineering principles and practices in this area atthe time this report
was prepared. we make no other warranty, either express or implied.
This report was prepared for the use of Mr. Solvik in the evaluation of the stability of the site.
With respect to construction, it should be made available for information on factual data only and
not as a warranty of subsurface conditions, such as those interpreted from the site reconnaissance
and discussion of subsurface conditions included in this letter.
Unanticipated conditions are commonly encountered and cannot be fully determined merely by
performing a reconnaissance of a site. Such unexpected conditions frequently require that
additional expenditures be made to achieve a properly constructed project. Some contingency
fund is recommended to accommodate such potential extra costs.
please note that the scope of our services did not include any investigation for the presence or
absence of wetlands or environmental assessment for the presence or absence of hazardous or
toxic material in the soil, surface water, groundwater, or air on or below or around this site. We
are able to provide these services and would be happy to discuss these with you if the need
arises.
w-8242-01
Mr. Sven Solvik
February 20,1998
Page 6
SHANNON SWLSON,INC.
Shannon & Wlson has prepared the attached, "Important Information About Your Geotechnical
Report," to assist you and others in understanding the use and limitations of our report.
If you have any questions regarding the observations, conclusions, or recommendations
contained in this letter, please call us. We appreciate the opportunity to be of service.
Sincerely,
SHANNON & WILSON, TNC.
Lof r?
,y'"/t*
EXPIRES I a5
Gregory R. Fischer, Ph.D., P.E.
Associate
-)
William f. Perkins, R.P.G.
Principal Engineering Geologist
WJP:GRF:HHD/wjp
Enclosures: Figure 1 - Subdrainage and Backfilling
Important Information About Your Geotechnical Report
cc:Ms. Judy Surber, City ofPort Townsend
OREGON
W8242-0 l_ltr.d oc / w8242-Pec/ am
w-8242-01
-l
I
I
I
I
I
i
I
IJ
II
lt
I
I
1
.J
I
f,J
J
1l
*i
Solvik PropertY
Port Townsend, Washington
SUBDRAINAGE & BACKFILLING
February 1998 W-8242-01
FIG. 1SHANNON & WILSON,INC.
Geobchnical and Envhonm€ntal Consultants
Pavement or 10" to 15"
lmpervious Soil
Backlill Meeting Gradation
Requirements lor Structural Fill
(See Note 2)
Excavation Slope
Contractor's
Responsibility
6" Min. Cover of Pea Gravel
(6" Min. on Sides of Pipe)
Sloped to Drain
Away From
Structure
Subdrain Pipe 2" lo 4"
Wall
Drainage Sand &
Gravelor Washed
Pea Gravel
Damp Proofing
Weep Holes
(See Note 1)
Vapor
Barrier
4" Min.Washed Pea
Gravel
Not to Scale
Drainage Sand & Gravelwith
the Following Specifications:
% Passing
Sieve Size by Weight
1-1t2', 100
314" 90 to 100
114" 75 to 100
No. 8 65 to 92
No. 30 20 to 65
No. 50 5 to 20
No. 100 0 to 2
(by wet sieving) (non-plastic)
SUBDRAIN PIPE
4" minimum diameter perforated or slotted pipe;
tight joints; sloped to drain (6"/100' min. slope);
provide clean-outs.
Perforated pipe holes (3/16" to 1/4" dia.)to be
in lower half of the pipe with lower quarter
segment unperforated for water flow.
Slotted pipe to have 1/8" maximum width slots
NOTES
Drainage gravel beneath floor slab should be
hydraulically connected to subdrain pipe on the
downslope side of the floor slabs only. Use of 2"
diameter weep holes on S-foot centers as shown is
one applicable method.
2. lmported structural fill should consist of well-graded
granular soil with not more than 5% fines (by weight
based on minus 3/4" portion) passing No.200 sieve
(by wet sieving) with no plastic fines.
3. Backfill within 18" of wall should be compacted with
hand-operated equipment. Heavy equipment should
not be used for backfill, as such equipment operated
near the wall could increase lateral earth pressures
and possibly damage the wall.
4. All backfill should be placed in layers not exceeding
4" loose thickness and densely compacted. Beneath
paved or sidewalk areas, compact to at least 95%
modified Proctor maximum density (ASTM: D1557'70,
Method C). Otherwise compact 1o92"/o minimum.
MATERIALS
Floor Slab
Min.
19"
o o0oo o0to
D6 0a'o
o
0
t'
o'a
Department of Public Works
5210 KUHN STREET
PORT TOWNSEND, WASHINGTON 98368
360/385-7212
360/385'7675 rnx
CrrvENcrNsnn
MEMORANI)T]M
To:
cc:
From:
Subject:
Date:
S{Iddy'Surber
David
Sven Solvik - Geotech Evaluation
March 13, 1998
I reviewed the Shannon and Wilson Report for the Sven Slovik property. I concur with their
conclusion in their fax dated 3109 that an ESA permit should not be necessary for this site.
One minor not just for the record. The report on page one states that H Street is currently "
vacated." In fact H Street is an unopened right-of-way, but not vacated.
{
,t\$"
frtA
Nt''''
MEMO
To:
f,Yom:
Subject:
Date:
IanTimme\
Judy Surber
Sven SoMk
March 13, I
Spears
development
Mr. SoMk orrrms Lots 2 and4, Block 6, Pettygrove's First Addition. At the request of Colette
Kostelec, I rwiewed the site for ESAs. As tle topography appeared ovet L5%o slope, additional
information was requested. Mr. Bill Perkins of Shannon & Wilson submitted a Geotechnical
Evaluation ofthe site datedd February 20,1998) and a fax dated March 9, 1998. Mr. Perkins
concluded tlat con'ditions on site do not meet the defnition ofESAper oity ordinance. Based on
the additional information received, Dave Peterson and I concur with IvIr. Perkins.
No ESA pemit is required for proposed single-family development on the above referenced
property. I have verbally recoilrmended that the applioants incorporate Mr. Perkins'
recommendations into their design.
TTIANK YOU
MnMo
To:
From:
Subject:
Date:
JanZimmer,
Judy Surber
Sven Solvik
March 13, 1
development
Spears
Mr. Solvik owns Lots 2 and4, Blook 6, Pettygrove's First Addition. At the request of Colette
Kostelec, I reviewed the site for ESAs. As the topography appeared over l5o/o slope, additional
information was requested. Mr..Bill Perkins of Shannon & Wilson submitted a Geotechnical
Evaluation ofthe site datedd February 20,1998) and a fax dated March 9,1998. Mr. Perkins
concluded that conditions on site do not meet the definition of ESA per crty ordinance. Based on
the additional information received, Dave Peterson and I ooncur with Mr. Perkins.
No ESA pemit is required for proposed single-family development on the above referenced
property. I have verbally recomme,nded that the applicants incorporate Mr. Perkins'
recommen dations into their design.
TI{ANK YOU
t]310{f./98 1(J;.lfi FAI l0(J 61,1'87:i7 SH.{}{NUN & IIILS{JN @ oor
ffiffiffiffi SHANNON fu WI LSON.WqWW GEOTECHNICAL AND ENVIRoNMENTAL coNs
INC.
U LTANTS
SAIITIE
RICHLAN0
FAIRBANKS
ANCHOHAGE
SAINT LDUIS
BO.STON
FAX
Sven $olvik Property (lots 2 & 4, block 6, Pettygrove's First Addition), ESA
Determinstion
1 (including cover)
CC:
Fax
Subject:
Proiect No.r W-8242-01
To:
Company:
Fax:
Date:
Timel
Total Pages;
From: Wiltiam J. Perkins, H,P,G.
Direct Phone; 206-633-6879E.mail: wjp@shanwil.com
Judy $urber
City of Port Townsend
(360) 385-42s0
March 9, 1998
Sven $olvik
(503) 287-ee73
Message:
As discussed in our phone conversation this morning, it is our opinion that the above referenced
propefi is gq!located in an Environmentally Sensitive Area (ESA) as described in the Pofi Townsend
Municipal Sode for geologically hazardous areas. We base this opinion on the site conditions observed
during our visit and review of geologic and soils maps of the area. A report of these observations and
reviews is provided in our letter to Mr. $otvik dated February 20, 1998, a copy of which was provided to you.
Please feel lree to call if you have any gue$tions regarding our determination or if we can be of fufther
assistance.
R grdr,E)\ll
Original of this fax may be mailed if requested.
NOTICE: The attached information is proprietary in its entiretil any teproduction 0r u$e of said inlormation by anyone other than its
intended E IJ have recgived this facsimile in enor,Shannon & Wilson
4OO NOR]H 34THSTHEFT. SUITE lOO
P.O. BOX 300303
SEATTLE, WASHINGTON 98109
?06€32-8020 FAX20s633.67f7
TDOr 1-80G833{388