Loading...
HomeMy WebLinkAbout21-055 Authorizing the City Manager to Award and Sign all Contracts for Construction of the Gaines Street Pump Station Within the City Budget Resolution 21-055 RESOLUTION NO. 21-055 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, WASHINGTON, AUTHORIZING THE CITY MANAGER TO AWARD AND SIGN ALL CONTRACTS FOR CONSTRUCTION OF THE GAINES STREET PUMP STATION WITHIN THE CITY BUDGET. WHEREAS, The City of Port Townsend Gaines Pump Station is a critical infrastructure facility for the wastewater utility; and WHEREAS, the Gaines Street Pump Station is experiencing some serious corrosion and repair is necessary; and WHEREAS, Jacobs Engineering Group designed a wet well liner repair; and WHEREAS, Interwest Construction submitted the lowest bid for the installation of the wet well liner; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend as follows: to authorize the City Manager to award and sign all contracts for construction of the Gaines Street Pump Station within the City budget. ADOPTED by the City Council of the City of Port Townsend at a regular meeting thereof, held this 7th day of September 2021. Michelle ndo���I..������_._. Mayor Attest, Approved as to form: Joanna Sanders, MMC Hci i G°reer�woo City Clerk City Attorney