Loading...
HomeMy WebLinkAboutRainier Street Regional Stormwater Addendum No. 5Addendum No. 5 for Construction of ���^�^����������� �����~��M�U �������������� ..~...^~.~. ~~...~~~~ ...~��..~..~~. ~~~.~......,—�~~' City of Port Townsend Work Order 8028 Prepared by� City ofPort Townsend Department ofPublic Works 250 Madison Street, Suite ZR Port Townsend, VvAQ8368 The above mentioned CONTRACT PROVISIONS AND PLANS has been reviewed and approved for advertisement. Such review includes all plans, specifications, and permits associated with the project. Prepared by: Sarah Tiffany Addendum No.5 Page 1of3 Rainier St. Regional Stoirmwater ADDENDUM NO. 5 TO THE CONTRACT PROVISIONS AND PLANS FOR CONSTRUCTION OF 7=- City of Port Townsend Work Order No. 8028 ISSUED: April 20,2020 BID OPENING: 2:00 PM April 22,2020 Acknowledge receipt of this Addendum on the Bid Proposal (Exhibit A), Page 1. TO PROSPECTIVE BIDDERS: The attention of all prospective bidders on the above project is directed to the following modifications and additions to the Contract Documents, which are hereby made a part of the Contract Provisions and Plans. MA,N,UAL COVER, BID SUBMITTAL COVER SHEET AND TABLE OF CONTENTS No Change PART I — CALL FOR BI No Change PART 11 — CON1 RACT SPECIFICATIONS No Change 0=111111MI-1=910 Replace Exhibit A — Bid Proposal with new Exhibit A Addendum Igo. 5 Page 2 of 3 Rainier St, Regional Stormwater Replace Exhibit B Bid Tabulation Form with new Exhibit B PART IV — CONTRACT FORMS No Change PARTY —APPENDICES No Change Bidders shall furnish the City of Port Townsend with evidence of receipt of the Addendum. This Addendum will be incorporated in the contract when awarded and when formally executed. Any questions please contact David L. Peterson, P.E. at dj-)e 1 q David Peterson, P.E. City Engineer City of Port Townsend Attachments: Exhibit A —Bid Proposal Exhibit B - Bid Tabulation Form Addendum No.5 Page 3 of 3 Rainier St. Regional Stormwater Ar1T1r_ Proposal of (Hereinafter called "Bidder"), organized and existing under the laws of the State of, doing business as To the City of Port Townsend ("City"): In compliance with your Invitation for Bids, Bidder hereby proposes to perform all work for the following Project or Contract: Rainier St. Regional Stormwater in strict accordance with the Contract Documents, within the time set forth therein, and at the prices stated below. By submission of this Bid, each Bidder certifies, and in the case of a joint Bid each party thereto certifies as to his own organization, that this Bid has been arrived at independently without consultation, communication or agreement as to any matter relating to this Bid with any other Bidder or with any other competitor. Bidder hereby agrees to commence work under this Contract on or before a date to be specified in the Notice to Proceed. Bidder acknowledges that if the Bid Proposal is made without a requirement for a Bid Deposit, and Bidder is awarded the Contract but fails to execute the Contract, then Bidder shall be disqualified from submitting further Bid Proposals to the City for a period of two years from Notice of Award. Bidder agrees to perform all work as described in the Contract Documents and as shown on the drawings for the Rainier St. Regional Stormwater for the total cost listed on Exhibit B as follows: Receipt is hereby acknowledged of Addendum(s) No(s): write "none" if there were no addendums.] [NOTE: Addendum 5 Page 1 of 2 Rainier St. Regional Stormwater 1. If the Bidder is a sole proprietorship, so state and give the name under which business is 2. lf the Bidder is a co -partnership, so state, giving firm name under which business is transacted. 3. if the Bidder is@corporation, this Proposal must beexecuted h«its duly authorized officials. Bidder's Firm Name Date Authorized Signature (required) Bidder's address and Telephone/Fax numbers for Official communications: STATE CERTIFICATE OF REGISTRATION NO. STATE UNIFIED BUSINESS IDENTIFIER NO. END OFTEXT Addendum Page 2of2 Rainier St. Regional Stonnwater Exhibit B # STD SPEC. Item Description Quantity Unit Unit (Price Total lBase Bid 1 1-09.7 MOBILIZATION I L.S. 2 2-01 CLEARING AND GRUBBING 3 ACRE 3 No Bid Item 0 4 2-03 COMMON BORROW 300 C.Y- 5 2-03 ROADWAY EXCAVATION 1130 C.Y. 6 2-09 STRUCTURE EXCAVATION CLASS B 4850 CY 7 2-03 EMBANKMENT COMPACTION 3150 C.Y. 8 8-15 QUARRY SPALLS 235 TON 9 4-04 PERMEABLE BALLAST 905 TON 10 7-05 CATCH BASIN TYPE I L 6 EACH 11 7-05 CATCH BASIN TYPE 2 48 IN. DIAM, 3 EACH MANHOLE ADDITIONAL HEIGHT 48 IN 12 7-05 DIAM. TYPE 2 5 L.F, 13 7-105 54 IN. CONTROL STRUCTURE 1 EACH 14 7-05 DEBRIS BARRIER I EACH is 7-04 TESTING STORM SEWER PIPE 1975 L.F. 16 7-01 DRAM IPIIIPE 8 IN. DIAM, 20 L.F. SOLID WALL PVC STORM SEWER PIPE 15 17 7-04 IN. DIAM. 36 L. F. CORRUGATED POLYETHYLENE STORM 18 7-104 SEWER RIPE 12 IN. DIAM. 81 L,F. CORRUGATED POLYETHYLENE STORM 19 7-04 SEWER P111PIE 18 IN. DIAM, 1858 L. F, 210 7-102 TRASH RACK 3 EACH 21 4-04 CRUSHED' URFACING TOP COURSE 700 TON 22 8-01 HIGH VISIBILITYSILT FENCE 1980 L.1F, 23 8-01 STABILIZED CONSTRUCTION ENTRANCE 250 S.Y. 24 8-01 ESC LEAD 75 DAY 25 8-01 STREET CLEANING 40 HR Addendum No, 5 iPage 1 of 2 Rainier St. Regional Stormwater Exhibit B Bid Tabulation Form 26 8-01 SEEDING, FERTILIZING, AND MULCHING 3 ACRE 27 8-21 PERMANENT SIGNING I L.S. SHORING OR EXTRAEXCAVATION CLASS 28 7-08 B 16,000 S.F. GRAVEL BACKFILL FOR PIPE ZOIN E 29 7-08 BEDDING 780 C.Y. 310 8-12 CHAIN LINK FENCE TYPE 3 650 L. F. 31 8-12 DOUBLE 14 FT,. CHAIN LINK GATE I EACH CONSTRUCTION GEOTEXTILE FOR 32 2-12 UNDERGROUND DRAINAGE 525 S.Y. 33 SP-8-30 FLOW DISPERSION TRENCH I EACH 34 SP-1-05.18 RECORD DRAWINGS 1 L.S. 35 1-04A MINOR CHANGE EST EST $ Base Bld'Total Bid Alternative 36 2 09 S1 RJXTURE EM"AVA CLASS B 850 C n"y 37 4-04 PERMEABLE BALLAST 1250 TOIN CONSTRUCTION GEOTEXTILE FOR 38 2-12 UNDERGROUND DRAINAGE 735 S.Y„ 39 8-12 CHAIN LINK FENCE TYPE 3 90 L, F. 40 2,03 FN',')A[")\AfAY EX("AVA'1101N,�' 235(li c.Y 41 2 f,�)13 �Total 3200 c'Y' Bi�dAlternative Addendum No.5 Page '2 of 2 Rainier St. Regional Stormwater