Loading...
HomeMy WebLinkAbout09006pORrT°� CITY OF PORT TOWNSEND y�o DEVELOPMENT SERVICES DEPARTMENT =4 = INSPECTION REPORT WA CALL THE INSPECTION LINE AT 360-385-2294 BY 3:00pm THE DAY BEFORE YOU WANT THE INSPECTION. FOR MONDAY INSPECTION, CALL BY 3:OOPM FRIDAY. DATE OF INSPECTION: L PERMIT NUMBER: O9 -ate SITE ADDRESS:f CONTACT PERSON: PHONE: TYPE OF INSPECTION: ❑ APPROVED ElAPPROVED WITH CORRECTIONS Ok to proceed. Corrections will be checked at next inspection \ Date Inspector ( C_ Y J Acknowledgement Date ❑ NOT APPROVED Call for re -inspection before proceeding. Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may be assessed if work is not ready for inspection. CITY OF PORT TOWNSEND %PERMIT ACTIVITY LOG PERMIT # L� h% DATE RECEIVED SCOPE OF WORK: DATE ACTION INITIALS 1-13 (O ENTERED INTO CHET S -- CHECKED FOR COMPLETENESS Zoning: Setbacks OK? Lot Size: Building Size: Lot Coverage: FAR OK? Height OK? Parking OK? Critical Area? Demo? Historic Rev? Notice to Title? Lots of Record? ��•�A .. 17 114 � � �_.� ! 1•� ��� � 1Y �..�f'f ■ MI����� •S/R � ���`I.� =777,7-3 7 7 February 5, 2009 Mr. Rick Taylor Department of Community Development City of Port Townsend 250 Madison Street Port Townsend, WA 98368 Re: Golf Course Storage Building Permit: BLD09-006 Tax Parcel: 001023005 Dear Mr. Taylor, As a follow up to our telephone discussion of February 2, 2009, we would like to make the following changcs on Drawing S-1 of the Golf Course Storage Building project: (1) Revise the note on CONCRETE, to read: "CONCRETE — f c= 2,500 psi, 3/4:" maximum aggregate. Maximum Slump: 3 -inches. Use 5-1/2 sack concrete mix." (2) Delete the note entitled "CONCRETE TESTING". Please contact me if you have any questions. Sincerely, Michael W. Biggs, PE s;a� �F B E MERrON SPOKANE 4040V.4-1-AVC,N WAY 933W--si TiF4)Am--Ni v S-n i e202 S.m i_ 214 [3F"4 M=1 tR N. WA 98310 9 -t -KW -*WA SCJ 1 F) 360/40 0 1420 R r � : 59/85332<3F ZE:1 f - nom 3C3D/3/7 X1153 FAX 50 9/74-75876 sThomas L. Aumock Consulting Fire Code Inspector 2303 Hendricks Street, Port Townsend, WA 98368 (360) 385-3938 Email: taumock@cablespeed.com Fax: (360) 643-0272 PLAN REVIEW MEMORANDUM To: Scottie Foster, Suzanne Wassmer, City of Port Townsend Development Services Department Fr: Thomas L. Aumock, Consulting Fire Code Inspector, East Jefferson Fire & Rescue Dt: 24 January 2009 Re: BLD09-006: PT Golf Course Storage Building I am in receipt of the set of plans for the above -referenced proposal from your office, have reviewed the proposal with the International Fire Code [I.F.C.], 2006 Edition and Washington State Amendments, and applicable N.F.P.A. code sections. The following constitutes this plan examiner's findings and determinations based upon the plans of record submitted. Findings & Determinations: 1. The proposal was reviewed as a one-story Group U occupancy with a Type V -B construction classification, for a 2,400 square foot storage building. 2. Addressing is not required for this building as it is an accessory building to the existing PT Golf Course address. 3. Key box access to or within the subject structure for emergency services delivery is an owner option. Contact East Jefferson Fire & Rescue at 385-2626 to obtain the proper forms, should this option be exercised. 4. Existing access to building opening[s] is found to be consistent with the I.F.C. Section 504, which requires an approved access walkway leading from fire apparatus access road(s) to exterior openings that are required by the Fire Code or Building Code. 5. An automatic fire suppression system (sprinklers) is not required under I.F.C. Section 903. 6. An automatic fire detection alarm system is not required for this occupancy under IFC Section 907. 7. Fire extinguisher sizing and placement shall meet or exceed IFC Section 906 and NFPA Standard 10, which normally requires a 3-A:20-B:C minimum rated fire extinguisher at the main exit door. Any other applicable or relevant sections of said Code not covered herein shall nonetheless apply to this proposal. .75 hours time was logged in the review, reporting, and filing of this proposal. It is the recommendation of this consulting fire code inspector that the proposal be approved subject to the aforesaid requirements of the International Fire Code. 1INISTRATIVE CERTIFICATE OF i-EVIEW For possible HISTORIC STRUCTURE DEMOLITION Design Review Application HPC09-005, City of Port Townsend The Port Townsend Historic Preservation Committee has completed its design review of the: Partial demolition (15' x 30') of a maintenance shed Representative: Bob LaCroix For the building located at: 1945 Blaine Street The building classification: (highlight one): N/A Pivotal Primary Secondary Altered Historic/Recent Compatible Intrusion Review of the project is: Mandatory per Ordinance 2969 Compliance with review is: Mandatory per Ordinance 2969 The review was conducted pursuant to Chapter 17.30 and of the Port Townsend Municipal Code, and was based on the application submitted on January 8, 2009 HPC Subcommittee: Charlie Paul & DSD staff John McDonagh Applicable Guidelines: Criteria for determining historical significance per Section 2 of Ordinance 2969. After review and analysis of relevant criteria (attached), the Historic Preservation Committee finds that the proposed partial demolition: (circle one) DOES NOT INVOLVE A HISTORICALLY SIGNIFICANT STRUCTURE DOES INVOLVE A HISTORICALLY SIGNIFICANT STRUCTURE within the City c Issued this -1 Approved i proved by Bcd Perinits: Form Letters2 Page I oft —Revised 12198 iir, Historic Preservation Committee SD Director (or designee) *a % FMS Export Report From 02/01/2009 To 02/20/2009 Page 1 of 6 Report run on February 24, 2009 1:48 PM A6 f#' Payer ee, Code . . ........ T ransa ctldq- nt, DR Account: 09.0068 BLOEDEL HEIDI 09.006 awwomm-- 09 Ont MIP08-1 09-0 0 0 NifilmemnAw a y 2/24no g� 11,11!!= way -,-M9r--FEW ER I-IV -ul 0-00 Iii0#11, 09-C v 0900-r- Y 14110111110"RF $ , 111ri 1 -0 960111108*0 BL DOR 09-( 0. !/2009 t,;lq OF PORT TOWNSEND ,BPF sl[60S olo-000-iii.loo.00 BLD0q09-, t 0; 009 t;1"4' OF PORT TOWNSEND BPF -RR sib -0 010.000-111-100-00 BLD09t 09-1 0', /2009 F PORT TOWNSEND BPF -TECH Z -1-1 & 7,14, 500.000-111-100-00 BLDOQ-60 � 09. Oi /2009 OF PORT TOWNSEND PRF $ 11 010.000-111-100-00 BLDOCI-WI, 09. 02 '2009 b;1140F PORT TOWNSEND �STATE-CODE 44.50 $ 4.501 613.000-111-100-00 SNP09-.M SNP09.003 SNP09-003 BLD09-017 MIP09.003 MIP09-003 MIP09-003 MIP09-003 �BLD09.018 �BLD09-009 BLD09.009 BLD09.009 BLD09-009 LUP08.063 LUP08.063 LUP08.063 SDP09.005 pttpmtrtra n posted 09-0064 09.0064 kh.0064 09-0065 09-0066 09-0066 09-0066 09-0066 09.0067 09-0068 09.0068 02/03/2009 VILLAGE BAKER SIGN $ 35.001 1 010-000-111.10 00 1 02/03/2009 VILLAGE BAKER SIGN S 20.001 010-000-11 ;?0. 02/03/2009 VILLAGE BAKER SIGN -RR 02/03/2009 jo 00 02/03/2009 VILLAGE BAKER SIGN -TECH i 02/03/2009 Sk)ULUN JANEIr r% r � 2 0 9 HOGLUND DONNA D 01 !INSP-ENG 0 0 LU M ' G ND DONNA D !MIP 2/0 0 21031 2009 DONNA D 02/03/2009 HOGLUND-VOW 02/04/2009 McFadin & Davi< 02/04/2009 BLOE IDI 02/04/2009 -� �DEL HEIDI 09-0068 9' 6 02/0 9 0 2 '0 BLOEDEL HEIDI 09.0068 04/2009 BLOEDEL HEIDI 09.006 02/05/2009 KOLFF CORNELIS A 09 69 02/05/2009 KOLFF CORNELIS A _0069 02/05/2009 KOLFF CORNELIS A 09-0070 0 /0 / 02/05/2009 Jsack Dinniene 09-0070 02/05/2009 Jsack Dinniene 09-0071 02/06/2009 WORDEN WILLIAM N 7 0 4 10 010.022-322-100-00 010.080-369-900-00 500.601-349-280-03 010.022-322-100-00 613.043-386-000-00 010.022-345-810-00 010-022.345-810-00 z- -zci_ Oq MIP -TECH -------- -- SP R IBP IBPF-TECH ISTATE-CODE BSP BSP -RR .0p. 'BSP -TECH MAP -LARGE . ......... . .. - ------ -- ---- - ------ - --- - ------- MAP -LARG E. T AX SDP -PR -STREET r OF 90AT TOk ti ys WA u a FMS Export Report From 02/01/2009 To 02/20/2009 pttpmtrlranposted Page 1 of 6 Report run on February 24, 2009 1:48 PM RT f= i 0-00 $ t11.0 !90 ;BPF ll�1.75 - $ll6l.1s 010.000.111.100-00 ;BPF -RR $l'OAV 010.000.111.100.00 'i 4, Applicatlyonr�t Rec®ipt # RE pt Dt� Payer �Zt 1PRF / S• Y $ 010.000-111-100-00 STATE -CODE 44. 50 $ 4.50 09 -Ont 0 ilinnn n owwwwwway 00 010.000 -111 -;?0.00 09.0 0 2/ way 4tt 09-C 0 reenway (SIGN -TECH 09-f 0 :/2009 t,;lgOF PORT TOWNSEND // BLD09 10 (o 09- 0; 009 G.1�i OF PORT TOWNSEND BLDOf �% 09-A 0, /2009 ► "I IF PORT TOWNSEND BLD0Q_.6c w 09• 0: 12009 OF PORT TOWNSEND BLDOCI t0l/r 09• 02 '2009 C4'jLf OF PORT TOWNSEND 03 09-0064 02/03/2009 VILLAGE BAKER SNP09• 09-0064 02/03/2009 VILLAGE BAKER SNP09.003 064 02/03/2009 VILLAGE BAKER SNP09.003 09- 02/03/2009 VILLAGE BAKER BLD09-017 09-006 02/03/2009 SOUZON JANE C MIP09-003 09.0066 2009 HOGLUND DONNA D MIP09-003 09-0066 02/0 OGLUND DONNA D MIP09-003 09-0066 02/03/2009 DONNA D MIP09.003 09-0066 02/03/2009 HOGLUND BLD09.018 09.0067 02/04/2009 McFadin & Davi BLD09.009 09.0068 02/04/2009 BLOED IDI BLD09.009 09.0068 02/04/2009 DEL HEIDI BLD09-009 09-0068 0210 9 BLOEDEL HEIDI BLD09-009 09-0068 04/2009 BLOEDEL HEIDI LUP08.063 09.006 02/05/2009 KOLFF CORNELIS A LUP08.063 09 69 02/05/2009 KOLFF CORNELIS A LUP08-063 -0069 02/05/2009 KOLFF CORNELIS A 09-0070 02/05/2009 Jsack Dinniene 09-0070 02!05/2009 Jsack Dinniene SDP09-005 09-0071 02/06/2009 WORDEN WILLIAM N pttpmtrlranposted Page 1 of 6 Report run on February 24, 2009 1:48 PM RT f= i 0-00 $ t11.0 !90 ;BPF ll�1.75 - $ll6l.1s 010.000.111.100-00 ;BPF -RR $l'OAV 010.000.111.100.00 BPF-TECH7J • ZL- Z_Z207, 500.000.111-100.00 �Zt 1PRF / S• Y $ 010.000-111-100-00 STATE -CODE 44. 50 $ 4.50 613.000-111.100-00 SIGN $ 35.00 00 010.000 -111 -;?0.00 SIGN $ 20,00 010-000-11 SIGN•RR $ 3.00 010• 11.100-00 (SIGN -TECH $ 5.00.000-111-100-00 500-000-111-100-00 !PRF .00 010.000.111-100-00 IINSP•ENG S 12.401 411.000.111-100-00 MIP $ 100,00! 110.000.111-100-00 $ 5.00! 010.000.111.100-00 !MIP -TECH i $ 5.00! 500.000.111.100-00 I $ 150.00 010-000.111-100-00 BPF $ 307.25 010-000-111.100-00 BPF•RR $ 10.00 010-000.111.100-00 BPF -TECH � _ $ 6.15 500-000-111-100-00 STATE -CODE 0! 613.000.111.100-00 TBSP $ 300. 010-000-111-100.00 ;BSP -RR $ 10,00 000-111.100-00 jBSP-TECH $ 6.00 500- 111.100-00 MAP -LARGE $ 25.00 010.000• 00-00 ,MAP-LARGE•TAX $ 2.101 010-000.111.1 ISDP-PR-STREET $ 50,001 110-000.111-100.00 41 19.10 010.022.322.100.00 010-080-369-900-00 500-601.349.280.03 010.022.322-100.00 613-043.386-000-00 010-022-345-810-00 010.022-345-810-00 010.080.369.900-00 500.601.349-280.03 010-022-322.100-00 411-000-322-900-00 110-000-343-900-00 010-080.369-900.00 500-601-349.280-03 010.022.322.100.00 010-022.322-100-00 010.080.369-900.00 500-601.349-280.03 613-043-386-000-00 010-022-345.810-00 010-080-369-900-00 500-601.349-280-03 010-022-369-900-00 010-022.369-900.00 �00-343-900.00 O� VoRT Tp� ti City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 ¢ wns� (360)379-5095 CITY OF PORT TOWNSEND 250 MADISON ST, STE 1 PORT TOWNSEND WA 98368 Application No BLD09-006 Project: STORAGE BLDG. AT GOLF COURSE Application Type Commercial - New Parcel # 001023005 Subdivision: Block/Lot Site Address 1948 BLAINE STREET Description Building Permit Fee Plan Review Fee State Building Code Council Fee Technology Fee for Building Permit Record Retention Fee for Building Permit Fee Amount Paid/Credit Balance Due $1161.75 $0.00 $1161.75 $755.14 $0.00 $755.14 $4.50 $0.00 $4.50 $23.24 $0.00 $23.24 $10.00 $0.00 $10.00 Total Fee Amount: $1954.63 Total Paid/Credits: S0.00 Balance Due: $1954.63 Payment due within 30 days Invoice Date: 24_FEB_09 Invoice # 671 Page 1 TO 03/23/2009 16:16 3606977316 WIS PAGE 01 WIS WELDING INSPECTION SERVICES Ingpe*tlon, KDE, Testing P. O, BOX 1044 SUQUAMISH, WASHINGTON 98392 (380) 897-1771 FAX (360) 697-7318 Grant Steel Buildings, In -- Ownar-City of Port Townsend Building Official -City of Port Tcwnsand, WA DATE 3fz3/D9 No. 827 PROJECT VP Gaff Coome Maintenance Building LOCATION '1948 Maine 3t. Port Townsend, WA CONTRACTOR Grant OWNER City P.T. WEATHER Overcast TEMP. 39 IF PRESENT AT SITE Grant Steel, bolting crew, owner PERMIT NO. SLD 0$006 � SPECIAL CODE REQUIRED HS BOLTING INSPECTION, VP PRE-ENGINEERED BUILDING Requested by Grant Steel Buildings for third party, independent special HS bolting inspection per IBC 1744 and VP specifications. Arrived at the job site 0930 hours, set up Skidmore -Wilhelm tension unit, SN# 11238, for bolting crew to demonstrate "turn of the nut" tensioning of HS ,A,32.5 bolts and verify that tested bolts meet the tension values per RCSC/AISC. Findings: i. Reviewed VP specifications and drawing notes. Main frames and portal beam. connection bolts to be fully tensioned using turn of the nut method, minimum tension value, as installed 28kips. 2. Tested two A325 SIS bolts, 3/4x2, manufacture JH, in the Skidmore unit. Bolting crew demonstrated turn of the nut method, 1/3 rotation beyond snug tight condition, bolts "match marked" for rotation. 3. VP building 40x60, two main frames and two portal frames with critical connections requiring :fully tensioned bolts. VT (visual) inspected bolted connections, A325 HS bolts installed per specifications and connection plates tight together. Installed and fully tensioned bolts (3!4x2) match marked for rotation. 4. Test results, min. tension as tested in Skidmore unit 29kips (5 % above installed value): Bolt 1 tested 35kips, Bolt 2 tested 36kips. 5. HS A325 bolts installed and tightened and CONFORM TO SPECIFICATIONS AND RCSC/AISC. Ken havens, SelliOt Inspector, AWS1CW1, ASNT 111 SIGN � PERMIT # SCOPE OF WORK: CITY OF PORT TOWNSEND PERMIT ACTIVITY LOG DATE RECEIVED DATE ACTION INITIALS ENTERED INTO CHET CHECKED FOR COMPLETENESS 2ij 6 q C4,11 cLi o f C� /Y? c' .No,� Q o b C -a a n, a/ylS In C0,4 kk n-ctj 2-3& cq— v d - r'SS &Q_ n n_ 2 7/0 7 6'1 ,F—V /Eur -- i s Zef 01 APHAQUOS 2r Q Cir c t Zoning: elC) Setbacks OK? - 11 Lot Size: Building Size: ' Lot Coverage: FAR OK? Height OK? Parking OK? ()A Critical Area? Demo? ' Historic Rev? Notice to Title? Lots of Record? o�PORTTo�ti BUILDING PERMIT U �O _ City of Port Townsend �w Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD09-006 Permit Type Commercial - New Project Name 40X60 storage building Site Address 1948 BLAINE STREET Parcel # 001023005 Project Description Construct a 40X60 Unheated Storage Building tr Names Associated with this Project License Type Name Contact Phone # Type License # Exp Date Applicant City Of Port Townsend Owner City Of Port Townsend Contractor Grant Steel Buildings (360) 379-3236 CITY 5034 01/31/2009 Contractor Grant Steel Buildings (360) 379-3236 STATE GRANTSB9731 12/01/2009 Fee lnformation Project Details Project Valuation 5130,000.00 Entered Bid Valuation 130.000 DOLL Building Permit Fee 1.161.75 Units: Heat Type: Plan Review Fee 755.14 Bedrooms: Construction Type: State Building Code Council Fee 4.50 Bathrooms: Occupancy Type: Technology Fee for Building Permit 23.24 Record Retention Fee for Building 10.00 Permit Total Fees $ 1,954.63 Conditions 10. Special Inspection required for high strength concrete and placement of reinforcing steel. Special Inspection reports shall be copied to the Building Department. 20. Special Inspection required for field welding of structural steel. Special Inspection reports shall be copied to the Building Department. ***SEE ATTACHED CONDITIONS *X* Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. 1 further certify that 1 am the owner of the property or authorizedagentof the owner. Print Name/J/�9� k' L'7L7�/r / Date Issued: 01/30/2009 G Issued By: SWASSMER Signa tUre _�' Date /"?� �/ _. Date Expires: 07/29/2009 of poRr Tod CONSTRUCTION PROGRESS RECORD v ysi CITY OF PORT TOWNSEND wAs Development Services Department 2.50 Madison Street, Suite 3, Port Townsend, WA 98368 POST THIS CARD IN A SAFE, CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. PARCEL NO. 001023005 PERMIT NO. BLD09-006 ISSUED DATE 01/30/2009 EXPIRATION DATE 07/29/2009 ADDRESS 1948 BLAINE STREET CONSTRUCTION TYPE OCCUPANT LOAD OWNER CITY OF PORT TOWNSEND PROJECT DESCRIPTION Construct a 40X60 Unheated Storage Building CONTRACTOR GRANT STEEL BUILDINGS LENDER INSPECTION INSP DATE COMMENTS TESC FOOTING SLAB FRAMING STRUCTURALSTEEL INSULATION SPECIAL FINAL BUILDING FINAL PUBLIC WORKS GWB INSPECTION INSP DATE COMMENTS TO REQUEST AN INSPECTION CALL (360) 385-2294. INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO 3:00 PM FOR NEXT DAY INSPECTION. 41 CITY' OF PORT TOWNSEND GOLF COURSE STORAGE BUILDING KEY DESIGN STANDARDS WASHINGTON ENGINEERING DRAWING SCHEDULE PLATE SHEET DESCRIPTION T-1 1 OF 3 TITLE SHEET A-1 2 OF 3 FLOOR PLAN S-1 3 OF 3 FOUNDATION PLAN GRANT METAL BUILDING SYSTEMS COUNCIL 2006 PRE-ENGINEERED METAL BUILDING DRAWINGS VP -1 1 OF 19 COVER SHEET VP -2 2 OF 19 ERECTION NOTES VP -3 3 OF 19 ANCHOR ROD PLAN VP -4 4 OF 19 PRIMARY AND ROOF BRACING PLAN VP -5 5 OF 19 FRAME CROSS SECTION AT FRAME LINE 1 VP -6 6 OF 19 FRAME CROSS SECTION AT FRAME LINE 2 VP -7 7 OF 19 FRAME CROSS SECTION AT FRAME LINE 3 VP -8 8 OF 19 FRAME CROSS SECTION AT FRAME LINE 4 VP -9 9 OF 19 ROOF SECONDARY PLAN VP -10 10 OF 19 SECONDARY ELEVATION AT 1 VP -11 11 OF 19 SECONDARY ELEVATION AT A VP -12 12 OF 19 SECONDARY ELEVATION AT 4 VP -13 13 OF 19 SECONDARY ELEVATION AT D VP -14 14 OF 19 ROOF COVERING PLAN VP -15 15 OF 19 COVERING ELEVATION AT 1 VP-16 16 OF 19 COVER NG VP -17 17 OF 19 COVERT NG ELEVATION AT 4 VP -18 18 OF 19 COVERING ELEVATION AT D VP -19 19 OF 19 BUILDING STANDARD ERECTION DETAILS KEY DESIGN STANDARDS WASHINGTON ENGINEERING EDITION/ 4040 Wheaton Way, Suite 202 PUBLISHER DATE TITLE INTERNATIONAL CODE Architecture Tel: 360-405-1420 COUNCIL 2006 INTERNATIONAL BUILDING CODE INTERNATIONAL CODE GRANT METAL BUILDING SYSTEMS COUNCIL 2006 INTERNATIONAL MECHANICAL CODE INTERNATIONAL CODE Metal Building Erection Contact: Mark Grant COUNCIL 2006 INTERNATIONAL PLUMBING CODE INTERNATTONAL CODE E-mail: grantgc@olympus.net COUNCIL 2006 INTERNATIONAL FIRE CODE NATIONAL FIRE Memphis, TN 38125 PROTECTION LEAVITT INDUSTRIES Sitework ASSOCIATION 2006 NFPA 70 - NATIONAL ELECTRIC CODE NATIONAL FIRE Tel: 360-385-4200 PROTECTION ASSOCIATION 2006 NFPA 101 - LIFE SAFETY CODE WASHINGTON STATE NON - WASHINGTON STATE 2006 RESIDENTIAL ENERGY CODE WASHINGTON STATE INDOOR AIR WASHINGTON STATE 2006 QUALITY AND VENTILATION CODE s-% dwt 1 3 ,rsr ,, s. R NORTH BEALH - 07 CZO fa. hOba15 lake C^e " ,� 9 NORlx B9A.9 �� - C street mapr` PORT TOWNSEND '§ fi -°d �/ G�q p F fi P JEFFERSON COUNTY— Washington P - 0 Vi Ya i y M 4'4, ti • y r4y y "nd :....x: FORT'-WOROEN �Pof19d AAA Waawqu.. tau �/.T �d4 .�`� �'p/,t`� a, 3 � F c0uxt '.STATE PA0.N : ,. ry •.� REVt9E0 1999 �fi IR4ROUM0} A 9 xo'� g � no ;' Rvcwman9 Lake • y♦ r h a, N dr � P � • f i +M afATON C: a rF \ ' �O ° u�Et`A s; s+ 4 i» .1', o• tr „ is �`' . '1 ti t '' a , �+r n.. s' .,et xraa«»,a. �; t � 4 'k c •n°� # a ,• ` a-� 8 � e E•. �+ �'�If ,j. �L � dR y 4. i hWt101tf UYXfN ` I i f sAA T(,G P a+ a �. d. • w°° p t r a A l` 8 d u�nIWu. D 3y B y y i v' q �f •.••� h 3 ,i, . -n"i`� of �'^ Ar ^ +v' MORGAN Rr,e^ s — 4 .ti,' t . p s �?t t '°^n .t �, �,� 4• ^.s� t .,,� , J �. ,ty,, ,,, es rt ,� .r 3„` c � ax t s � � � , F• a*J�, .S' f �yy4" e € e E y' S ? ,e.� J �+/, '4 +� x5 + � r" 'F o fr�a - E t I a^ h,. F Kta s. � 3 _ t4 r. ^{ o''♦P �. a„,..<n ,. � ,r y . ' y, �'�•,• ° tr tiF r y d s' .s sr �� ,ry"Yy"ry � R ` r tz'� m ~ • fr � ° e.rr. � x t i Ax = 5 . �l 'ee s � /��droM ; y1 t 3% .r ♦ NaF T tN K, a,. U T 0 W u' of u � 5 c z t �I � :.c h;. n� ' •S „�_, r .x Ce. s y Pond • � `. °r s• xv „ �', � L„a x A n. J v y GEN COVE : ..... • . : - .._ :, rov eoAt,xAVE F 20 ORT TOWNSEND BAY ' 4 Glyn co e 3 � J..:.®«..-..li.--.,�',�._ 6 mE1•--- V DESIGN-BUILD TEAM AND KEY VENDORS WASHINGTON ENGINEERING Prime Design Firrm 4040 Wheaton Way, Suite 202 Civil Engineering Bremerton, WA 98310 Structural Engineering Contact: Michael Biggs, PE Architecture Tel: 360-405-1420 Fax 360-377-4153 E-mail: mikebiqqs@wa-eng.net GRANT METAL BUILDING SYSTEMS Construction Project Manager 75 Haada Laas Drive Metal Building Procurement Port Townsend, WA 98368 Metal Building Erection Contact: Mark Grant Concrete Foundations/Slabs Tel: 360-379-3236 Fax 360-379-6676 E-mail: grantgc@olympus.net VP BUILDINGS Metal Building Provider 3200 Players Club Circle Memphis, TN 38125 LEAVITT INDUSTRIES Sitework Port Townsend, WA 98368 Utilities Contact: Bill Leavitt Tel: 360-385-4200 PARCEL INFORMATION TAX PARCEL 001 023 005 LEGAL DESCRIPTION PORTION OF THE SOUTHWEST QUARTER OF SECTION 2, TOWNSHIP 30N, RANGE 1W, W M OWNER/APPLICANT CITY OF PORT TOWNSEND SITE ADDRESS 1948 BLAINE STREET PORT TOWNSEND, WA 98368 ZONING P/OS EXISTING PARK OR OPEN SPACE LIMITATIONS ON SCOPE OF WORK: WASHINGTON ENGINEERING SCOPE LIMITED TO ARCHITECTURAL AND STRUCTURAL DESIGN, AND DOES NOT INCLUDE OFFSITE UTILITIES, STORMWATER MANAGEMENT, MECHANICAL SYSTEMS, PLUMBING OR ELECTRICAL SYSTEMS. GENERAL CONSTRUCTION NOTES: 1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH JEFFERSON COUNTY STATE OF WASHINGTON STANDARD STANDARDS AND THE MOST CURRENT COPY OF THE SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION. 2. ALL SAFETY STANDARDS AND REQUIREMENTS SHALL BE COMPLIED WITH, AS SET FORTH 8 OSHA. WISHA AND THE WASHINGTON STATE DEPARTMENT OF LABOR AND INDUSTRIES. 3. WHEN NOISE PRODUCING OPERATIONS ARE IN PROGRESS, THE CONTRACTOR'S WORK HO Q ARE LIMITED TO MONDAY THROUGH SATURDAY, FROM 7:00 AM TO 6:00 PM, UNLESS OTHER��' 1 ARRANGEMENTS ARE MADE THROUGH THE CITY OF PORT TOWNSEND, DEPARTMENT OF I I COMMUNITY DEVELOPMENT. CONCURRENCE: 1 L_ BY: CITY OF PORT TOWNSEND _ DATE BUILDING CODE ANALYSIS: OWNER: CIN OF PORT TOWNSEND LOCATION: 1948 BLAINE STREET PORT TOWNSEND, WA 98368 JEFFERSON COUNTY, WASHINGTON CODE ENFORCEMENT. INTERNATIONAL BUILDING CODE 2006 TYPE OF FACILITY: LOW HAZARD STORAGE BUILDING PROPOSED BUILDING: A SINGLE STORY PRE-ENGINEERED METAL BUILDING 40 FEET BY 60 FEET WITH AN EAVE HEIGHT OF 12 -FEET, FOR A TOTAL BUILDING AREA OF 2,400 SF. CODE ANALYSIS/CHECK: 1. BUILDING OCCUPANCY GROUP U (UTILITY AND MISCELLANEOUS. GROUP) 2. CONSTRUCTION TYPE V -B 3. FIRE SPRINKLERS REQUIRED NO ALLOWABLE CONSTRUCTION: CONSTRLr_nON TYPE: ALLOWED V -B PROPOSED V -B ALLOWABLE AREA: ALLOWED 9,000 SF ACTUAL 2,400 SF MIXED OCCUPANCY ALLOWED NO ACTUAL NO MINIMUM EGRESS REQUIREMENTS: 1. OCCUPANT LOAD FACTOR EQUAL TO 100 SNPERSON OR 24001100 EQUALS 24 PN 24 LESS THAN 50 REQUIRED: ONE 30' EGRESS DOCK ACTUAL: OTE 30' EGRESS DOOR 2. TOTAL EXITWIDTH REQUIRED: W ACTUAL: 30 3, TOTAL EXITS REQUIRED: 1 ACTUAL: 1 MI NI MUM DOOR HEIGHT 7FEET MINIMUM DOOR WIDTH 3 FEET EROSION CONTROL NOTES: 1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO BEGINNING CONSTRUCTION. 2. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES. THE CONTRACTOR SHALL TAKE ACTIONS TO PREVENT SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES. 3, THE CONTRACTOR SHALL MAKE A DAILY SURVEILLANCE OF ALL EROSION CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES. 4. IF CONSTRUCTION OCCURS DURING DRY WEATHER, WATER SHALL BE USED TO CONTROL DUST. 5. IF TRENCH DEWATERING DEVICES ARE REQUIRED THEY SHALL BE DISCHARGED IN A MANNER THAT WILL NOT ADVERSELY AFFECT DRAINAGE SYSTEMS OR OFF-SITE PROPERTIES. 6. ALL OFF-SITE CATCH BASINS IMMEDIATELY ADJACENT TO THE SITE SHALL BE PROTECTED FROM SILTATION. 2' 0' 2' 4 6' S GALE: 1/4” = V-0" 4' 0' 4' 8' 12' J SCALE: 1/8” = T-0" BURIED UTILITIES IN AREA JAN 1 3 2009 CALL 2 BUSINESS DAYS BEFORE YOU DIG 1-800-424-5555 CITY OF PORT TOWNSEND EXISTING UTILITIES SHOWN ARE FROM THE BEST AVAILABLE INFORMATION AND NO DSD GUARANTEE IS MADE AS TO THE EXACT SIZE, TYPE, LOCATION, OR DEPTH. BLD U 9 ® 0 ® IF SHEET SIZE IS LESS THAN 22x34, REDUCE SCALE ACCORDINGLY snEEr. 1 OF 3 T• 60'-0' 20'-0" I 20'-0" I 20'-W 10'-0" DOOR OPENING 5'-0- 1 �I METAL BUILDING SYSTEM SCHEDULE BUILDING MANUFACTURER VP BUILDINGS SECONDARY FRAMING SECONDARY FRAMING MEMBERS SHALL BE LIGHT -GAUGE, COLD FORMED MEMBERS 3200 PLAYERS CLUB CIRCLE, MEMPHIS, TN 38125 MATERIALS WITH A MINIMUM THICKNESS OF 16 -GAUGE AND CONFORMING TO ASTM A-570, GRADE BUILDING ERECTOR GRANT STEEL BUILDINGS AND CONCRETE SYSTEMS 55, WITH A MINIMUM YIELD POINT OF 55,000 PSI. CONTRACTOR LICENSE: GRANTSB973RA COLOR ALL WALL PANELS, ROOF PANELS, GUTTERS, DOWNSPOUTS AND TRIM MATERIALS - 75 HAADA LAAS DRIVE, PORT TOWNSEND. WA 98368 ARE TO BE PROVIDED WITH A KYNAR 500 FINISH. COLORS SHALL MATCH EXISTING TEL: 360-379-32361 FAX: 360-379-6676/ BUILDINGS AT THE SITE. THE ROOF PANELS SHALL BE'LEAF GREEN', THE WALL BUILDING CLASSIFICATION THE BUILDING PROPOSED UNDER THIS PROJECT IS CATEGORIZED AS A -U- (UTILITY AND PANELS SHALL BE'COOL SIERRA TAN', AND THE TRIM PIECES SHALL MATCH AND OCCUPANCY MISCELLANEOUS) OCCUPANCY IN THE 2006 IBC. THE BUILDING IS TO BE TYPE V-8 CONSTRUCTION. J/ ADJACENT PANELS. STRUCTURAL DESIGN THE BUILDING MANUFACTURER IS TO PROVIDE STRUCTURAL CALCULATIONS FOR THE WALL SHEETING WALL SHEETS SHALL BE 20 GAUGE MATERIAL. PANEL CONFIGURATION SHALL BE 1-1/8' PRE-ENGINEERED METAL BUILDING, INCLUDING FRAME BASE REACTIONS, STAMPED MAJOR RIBS AT 12 -INCHES ON CENTER. WALL SHEETING SHALL BE FURNISHED FULL BY A PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF HEIGHT. WALL FASTENERS SHALL BE 1112-14X1" HEX HEAD COLOR MATCH WASHINGTON. THE CALCULATIONS ARE TO PROVIDE A STRUCTURAL ANALYSIS AND SELF -DRILLING SCREWS WITH WASHER. WHERE SHOWN ON CONSTRUCTION DESIGN FOR BOTH VERTICAL AND LATERAL LOADS. THE FOLLOWING DESIGN LOADS DRAWINGS, WALLITE TRANSLUCENT PANELS SHALL BE INSTALLED. ARE TO BE USED IN THE BUILDING DESIGN: / ,/ (A) WIND - 85 MPH (3 -SECOND GUST), EXPOSURE C V/ ROOF PITCH THE DESIGN ROOF PITCH IS 4 INCHES PER FOOT. (B) WIND UPLIFT -CLASS 90 / ROOFSHEETING ROOF SHEETS SHALL BE 20 GAUGE MATERIAL. PANEL CONFIGURATION SHALL BE (C) SEISMIC - ZONE D2, SS=1.25, S 1.45 ✓ 1-1/8' MAJOR RIBS AT 12 -INCHES ON CENTER. PANEL COVERAGE SHALL BE 30' AND (D) GROUND SNOW LOAD - 25 PSF SHALL BE FURNISHED FULL LENGTH FROM BUILDING EAVE TO RIDGE PURLIN FOUNDATION THE BUILDING SHALL BE ANCHORED TO A CONCRETE FOUNDATION AT THE BASE OF FRAME COLUMNS USING ANCHOR BOLTS CAST -IN-PLACE AS SPECIFIED BY THE GUTTERS AND THE BUILDING IS TO BE PROVIDED WITH GUTTERS AND DOWNSPOUTS. DOWNSPOUTS BUILDING MANUFACTURER, THE FOUNDATION DESIGN SHALL BE PREPARED BY A DOWNSPOUTS ARE TO DISCHARGE TO SPLASH BLOCKS. REGISTERED ENGINEER LICENSED TO PRACTICE IN THE STATE OF WASHINGTON, BUILDING TRIM BUILDING TRIM SHALL INCLUDE EAVE TRIM, GABLE TRIM, AND ROLLUP DOOR TRIM. SHOWING COMPLIANCE WITH THE BUILDING MANUFACTURER'S FRAME BASE MATERIALS ALL TRIM SHALL BE 26 -GAUGE MATERIAL AND MANUFACTURED OF FLAT STOCK REACTION LOADING. FOUNDATION/FOOTING DESIGN IS BASED ON PRESCRIPTIVE MATERIAL EQUAL IN QUALITY TO WALL SHEETS WITH COLOR TO MATCH WALL CRITERIA USING A DESIGN LOAD OF 1,500 POUNDS PER SQUARE FOOT, UNLESS SHEETING. TRIM PIECES SHALL BE PACKAGED FOR SHIPMENT AT THE FACTORY. DOCUMENTATION IS PROVIDED BY THE DEVELOPER THAT SUBSTANTIATES USAGE OF A HIGHER LOADING. ROOF TRIM ROOF CAULKING SHALL BE APPLIED AT ALL ROOF SHEET SIDE LAPS. ROOF CAULK INSTALLA77ON SHALL BE A TAPE SEALANT TYPE AND SHALL BE PREFORMED BUTYL RUBBER BASE FLOOR SLAB THE BUILDING SHALL BE PROVIDED WITH A MINIMUM 4 -INCH THICK CONCRETE FLOOR. AND SHALL BE SUPPLIED AS A 3(16'X 3/8' EXTRUDED SHAPE. SLAB, REINFORCED USING 6x6/W8xW8 WELDED WIRE REINFORCEMENT. A &MIL / VAPOR BARRIER SHALL BE PLACED BETWEEN THE BASE MATERIAL AND THE ✓ FOAM CLOSURES INSIDE AND OUTSIDE SEMI-RIGID CROSS-LINKED POLYETHYLENE FOAM CLOSURES CONCRETE SLAB. THE CONCRETE MIX SHALL HAVE A MINIMUM COMPRESSIVE SHALL BE PROVIDED AS REQUIRED TO PROVIDE WEATHER TIGHTNESS AND STRENGTH OF 2,5�\I. BIRD -PROOFING. PRIMARY FRAMING MATERIALS ALL MATERIALS USED IN THE CONSTRUCTION OF THE BUILDING ENVELOPE SHALL BE WALL INSULATION NO WALL INSULATION IS TO BE PROVIDED (BUILDING IS UNHEATED). NON-COMBUSTIBLE. ALL PRIMARY STRUCTURAL FRAMING MEMBERS SHALL BE BUILT-UP OR WIDE FLANGE SECTIONS WITH A MINIMUM WEB THICKNESS OF 118" AND ROOFINSULA77ON PROVIDE 2" THICK J-600 INSULATION (VRV) AS VAPOR BARRIER. A MINIMUM FLANGE THICKNESS OF %". 1 2 3 T 60'-0- 1 20'-0- . 20-0- , 20'-V , (eih RIDGE 18' 8" 26GA METAL PANELS, SCREW DOWN ROOF, COLOR: LEAF GREEN WALUTE TRANSLUCENT PANELS EAVE H Y 12'-0" f— 26GA METAL WALL PANELS, COLOR: COOL SIERRA TAN kJ \— 10'x10' CHAIN OPERATED DOOR"i.,— FRONT ELEVATION SCALE: 1/8" = V-0" 4 3 2 1 60'-0' 20'-0" , 20'-0" , 20'-0' 1 UG JO 18 777 '•8 " rI— 26GA METAL PANELS, SCREW jl DOWN ROOF, COLOR: LEAF GREEN WALLITE TRANSLUCENT PANELS EAVE 12'-0" 26GA METAL WALL PANELS, COLOR: COOL SIERRA TAN REAR ELEVATION ✓ SCALE: '1/8" = V-0" 23'-0" 8'-6- I I 1 I EAVE 12'-0" 26GA METAL WALL PANELS, COLOR: COOL SIERRA TAN LEFT ELEVATION SCALE: 1/8" = T-0" D 99 A 23' 9' B't" I 1 1 I EAVE RIGHT ELEVATION SCALE: 1/8" = V-0" r ROOF PANEL L2' J-800 INSULATION (VRV) AS VAPOR BARRIER 26GA WALL PANEL �4-' CONCRETE SLAB W/ THICKENED EDGE VAPOR BARRIER SECTION A EXTERIOR WALL 1-1 A-1 NOT TO SCALE 2 0' 2' 4- 6' SCALE: 1/4" = T-0" 4' 0' 4' 8' 17 SCALE: 1/8" = 1'-0" BLD09®0® BURIED UTILITIES IN AREA CALL 2 BUSINESS DAYS BEFORE YOU DIG 1-800-424-5555 EXISTING UTILITIES SHOWN ARE FROM THE BEST AVAILABLE INFORMATION AND NO GUARANTEE IS MADE AS TO THE EXACT SIZE, TYPE, LOCATION, OR DEPTH. IF SHEET SIZE IS LESS THAN 22x34, REDUCE SCALE ACCORDINGLY 6T-0- 1 201-0 1 20'-0• 1 20 -0- 1 10'-0- DOOR OPENING PER PEMB MANUF. PEMB COL (3) #4 BARS #5 HAIRPIN 1 OR 2 SECTION A THICKENED EDGE SLAB S-1 SCALE: 1/8" = V-0" tHAIRPIN_2 SECTION (aD- 1A_1 D, 4A, AND 4D B FOOTING AT GRID 2 & 3 NO SCALE S-1 SCALE: 1/8" = V-0" RECOMMENDED COMPACTION STANDARD PER PEMB LOCATION MANUF. qy/�6 STRUCTURAL FILL BENEATH e PEMB COL REBAR CAGE ,HAIRPIN -l-' (8) #6 BARS E.W. 1 B, 1 C, 4B, AND 4C STRUCTURAL FILL PLACED MORE NO SCALE THAN 2 -FEET BELOW PAVEMENTS 92% SUBGRADE PRIOR TO FILLING 95% UTILITY TRENCH BACKFILL FROM 20. b ..� �-ol SAME AS ABOVE PIPE CROWN 121 ADJACENTFILL 1'I PERCENTAGE OF MAMMUM DRY DENSITY AS DETERMINED BY ASTM 01557 3.-4. SATISFY MANUFACTURERS SPECIFICATIONS e tHAIRPIN_2 SECTION (aD- 1A_1 D, 4A, AND 4D B FOOTING AT GRID 2 & 3 NO SCALE S-1 SCALE: 1/8" = V-0" RECOMMENDED COMPACTION STANDARD MINIMUM LOCATION COMPACTION I'I STRUCTURAL FILL BENEATH FOUNDATIONS, FLOOR SLABS AND TO A DEPTH OF 2 FEET BENEATH PAVEMENTS 95% STRUCTURAL FILL PLACED MORE THAN 2 -FEET BELOW PAVEMENTS 92% SUBGRADE PRIOR TO FILLING 95% UTILITY TRENCH BACKFILL FROM FINISHED GRADE TO ONE -FOOT SAME AS ABOVE PIPE CROWN 121 ADJACENTFILL 1'I PERCENTAGE OF MAMMUM DRY DENSITY AS DETERMINED BY ASTM 01557 12) PIPE BEDDING AND INITIAL BACKFILL AROUND THE PIPE SHOUL' SATISFY MANUFACTURERS SPECIFICATIONS NOTES: GENERAL: ALL WORK SHALL COMPLY WITH 2006 IBC, STATE, & LOCAL CODES ANCHOR BOLTSIBEARING PLATES: SEE VARCO PRUDEN COMPANY DRAWINGS. SUBGRADE: SUBGRADE SHALL BE UNDISTURBED NATIVE SOIL OR WELL COMPACTED FILL IF FILL, OBTAIN COMPACTION TESTING REPORTS INDICATING 95% COMPACTION. EXCAVATE FOR FOOTINGS AND STEM WALLS FROM THE PREPARED SUBGRADE. REMOVE ALL LOOSE SOIL FROM EXCAVATIONS. CONCRETE: 4000 PSI, 3/4" MAXIMUM AGGREGATE. MAXIMUM SLUMP 3". Pr=600 PSI. PLACE USING MECHANICAL VIBRATION. HARD TROWEL FINISH. APPLY CURE/SEAL WITHIN 4 HOURS OF PLACEMENT, EXTERIOR CONCRETE TO BE LIGHT BROOM FINISH WITH 5% AIR ENTRAINMENT. CONCRETE TESTING: ALL TESTING BY INDEPENDENT LABORATORY. PROVIDE VISUAL INSPECTION OF CONCRETE REINFORCEMENT AND FORMWORK. TEST FIRST CONCRETE BATCH OF EACH MIX DESIGN FOR SLUMP AND OBTAIN 4 CYLINDERS TO BE CURED FOR STRENGTH TESTS. PROVIDE A MINIMUM OF 1 SET OF STRENGTH TESTS FOR EACH 70 YARDS PLACED. CONTRACTOR IS TO ARRANGE AND PAY FOR ALL CONCRETE TESTING SERVICES. REINFORCEMENT: ALL REINFORCEMENT #4 AND LARGER: GRADE 60. #3 REINFORCEMENT: GRADE 40 OR 60 UNLESS NOTED TO BE GR 60. PROVIDE CORNER BARS AT ALL CORNERS. LAP REINFORCEMENT - CLASS B. MINIMUM COVER: 3" TO EARTH FOR FOOTINGS, Q2" TO EARTH FOR SLABS. EXPOSED TO WEATHER 1Y". ANCHOR BOLTS: ANCHOR BOLTS SHALL BE DIAM. INDICATED ON DRAWINGS. CAST IN BOLTS SHALL HAVE 3" HOOK OR STANDARD HEAD. A36 OR A307. DRILLED IN ADHESIVE ANCHORS EMBEDDED 6" MIN. MAY BE SUBSTITUTED. ADHESIVE ANCHOR SYSTEM SHALL BE ICBO RECOGNIZED. THE FOLLOWING BRANDS ARE PREAPPROVED- RAWL CHEM -STUD, HILTI HVA, OR SIMPSON ET. STUD TO BE A36 OR A307. INSTALL STRICTLY PER MANUFACTURERS INSTRUCTIONS. CURE ANCHORS A MINIMUM 24 HOURS BEFORE ERECTING STEEL. INCREASE EMBEDMENT OF BOLTS WHERE INDICATED OR REQUIRED BY DESIGN. SOILS & FOUNDATION DESIGN: ASSUMED 3000 PSF BEARING WITH A MINIMUM EMBEDMENT INTO THE BEARING STRATA OF 2 FEET, FOR LIGHT FOUNDATIONS FOOTING WIDTHS BETWEEN 12 TO 18 INCHES WIDE MAY BE USED PROVIDED FOOTINGS LESS THAN 18 INCHES WIDE ARE DESIGNED FOR 1500 PSF BEARING. FOUNDATIONS ARE DESIGNED TO RESIST UPLIFT, SLIDING AND OVERTURNING WITH A FACTOR OF SAFETY GREATER THAN 1.5 FOR WIND / SEISMIC LOADS. WHERE DESIGN HAS UPLIFT DUE TO DEAD OR LIVE LOADS, THE FACTOR OF SAFETY SHALL BE AT LEAST 2. WHERE DESIGN REQUIRES TENSION TIES, PROVIDE TIE ELEMENT BELOW THE SLAB ON GRADE WITH ALL TIE REINFORCING HAVING STAGGERED SPLICES SO NO MORE THAN 33% OF THE TIE IS SPLICED AT ANY LOCATION. COORDINATE TIE HEIGHTS WITH DRAINS & OTHER UTILITIES. EXCEPT FOR BOTTOM BARS OF PERIMETER THICKENED EDGES, SLAB REINFORCING SHALL NOT BE USED FOR CALCULATED FORCES. PERIMETER WALL FOOTINGS MAY BE EITHER A TYPICAL FOOTING AND STEM WALL OR A THICKENED SLAB EDGE AT THE CONTRACTOR'S OPTION. THICKENED SLAB EDGES SHALL BE DESIGNED FOR WALL DEAD LOADS, PROVIDE FOOTINGS AT THE BEARING DEPTH FOR FLOOR AND ROOF LOADS. STRUCTURAL ENGINEERING: INDICATED STRUCTURAL INFORMATION IS PROVIDED TO ESTABLISH THE GENERAL SCOPE OF THE PROJECT TO FACILITATE ESTIMATING THE REQUIRED WORK EFFORT. THE PRIME CONTRACTOR WOR PRE ENGINEERED METAL BUILDING CONTRACTOR SHALL PROVIDE SEALED CALCULATIONS AND INSTALLATION DRAWINGS FOR THIS PRE ENGINEERED METAL BUILDING COMPLETE AND IN ACCORDANCE WITH THE APPLICABLE INDUSTRY, STATE, AND LOCAL CODES. THE PEMB DESIGN PACKAGE SHALL PROVIDE CALCULATIONS AND DRAWINGS OF ALL STRUCT ELEMENTS OF THE BUILDING TO FORM A COMPLETE SYSTEM IN COMPLIANCE WITH THE CODES, INCLUDING FINAL FOUNDATION DESIGN, COLUMNS, SEISMIC BRACING, LATERAL LOAD SYSTEM, CONCRETE FILLED METAL DECK SLABS, ROOF FRAMING, GIRTS, PURLINS, HIGH BAY DOOR SUPPORT SYSTEM, RIGID FRAMES, TENSION TIES, AND OTHER STRUCTURAL ITEMS. SELECT GRANULAR FILL j US STANDARD PERCENT PASSING B LESS THAN 5 PERCENT PASSING BASED ON THE ' MINUS 3/4 INCH FRACTION BLD av9- 20' 2' 4' 6' SCALE: 1/4" = V-0" 4' 0' 4' 8' 12' SCALE: 1/8" = 1'-0" IF SHEET SIZE IS LESS THAN 2204, REDUCE SCALE ACCORDINGLY MATERIALS Cover Sheet PRELIMINARY DRAWINGS 12/06/08 NOT FOR CONSTRUCTION 3 PLATE WELDED SECTIONS Notes COLD FORMED LIGHT GAGE SHAPES BRACE RODS HOT ROLLED MILL SHAPES \ Anchor Rod Plan HOT ROLLED ANGLES HOLLOW STRUCTURAL SECTION (HSS) Primary Structural CLADDING VP BUILDINGS VARCO PRUDEN A BlueScope Steel Company VP Buildings 3200 Ployers Club Circle Memphis TN 38125 T. ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AN, DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PERFORMANCE REQUIREMENTS SPECIFIED BY VP. GENERAL NOTES ASTM DESIGNATION A529, A572, A1011, A1018 A653, MOT A572 A36, A529, A572, A588, A709, A992 A529, A572, A588, A709, A992 A500 - A653, A792 A325 & A490 BOLT TIGHTENING REQUIREMENTS GRADE 55 GRADE 60 GRADE 50 GRADE 36 KSI UNLESS NOTED GRADE 50 GRADE B GRADE 50 OR GRADE 80 IT IS THE RESPONSIBILITY OF THE ERECTOR TO INSURE PROPER BOLT TIGHTNESS IN ACCORDANCE WITH APPROPRIATE REGULATIONS. THE FOLLOWING CRITERIA IS IN COMPLIANCE WITH THE LATEST SPECIFICATIONS, HOWEVER THE ERECTOR IS RESPONSIBLE TO VERIFY LOCAL AUTHORITY REQUIREMENTS. ALL CONNECTIONS MADE WITH A325 BOLTS MAY BE TIGHTENED TO THE 'SNUG TIGHT' CONDITION AS PERMITTED BY THE -SPECIFICATION FOR STRUCTURAL JOINTS USING 4325 OR A490 BOLTS (2004 ED), UNLESS INDICATED AS 'PRE -TENSIONED' ELSEWHERE IN THESE DRAWINGS, OR AS INDICATED BELOW. - PRE -TENSION BOLTS ON PRIMARY FRAMING, BOLTED BRACING, AND STRUT CONNECTIONS IF LOCATED IN IBC SEISMIC PERFORMANCE / DESIGN CATEGORY D, E OR F, UBC ZONE 3 OR 4. SEE CODES AND LOADS NOTES BELOW FOR SEISMIC DESIGN CATEGORY. PRE -TENSION ALL PRIMARY FRAMING CONNECTIONS IN CANADA. PRE -TENSION BOLTS ON PRIMARY FRAMING, BOLTED BRACING, STRUTS AND CRANE RUNWAY CONNECTIONS IF BUILDING SUPPORTS A CRANE WITH A CAPACITY GREATER THAN 5 TONS. CONNECTIONS THAT SUPPORT RUNNING MACHINERY AND OTHER SOURCES OF IMPACT OR STRESS REVERSAL MUST BE PRE -TENSIONED. ALL SLIP CRITICAL CONNECTIONS AS INDICATED IN THESE DRAWINGS WITH -SC DESIGNATION MUST BE PRE -TENSIONED. SC TYPE CONNECTIONS MUST BE FREE OF PAINT, OIL OR OTHER MATERIALS THAT REDUCE THE FRICTION AT CONTACT SURFACES. CONNECTIONS DESIGNATED AS A325 -X OR A490 -X SHALL BE INSTALLED WITH BOLT HEAD ON SIDE OF THE THINNEST PLATE BEING CONNECTED. SECONDARY MEMBERS AND FLANGE BRACE CONNECTIONS ARE ALWAYS 'SNUG TIGHTENED', EVEN IF ABOVE CONDITIONS EXIST, UNLESS SPECIFICALLY NOTED OTHERWISE ON DETAILS. WASHERS ARE NOT REQUIRED FOR 'SNUG -TIGHT' CONNECTIONS. PRE -TENSIONED A325 OR A490 CONNECTIONS TIGHTENED USING THE TURN -OF -THE -NUT METHOD DO NOT REQUIRE WASHERS. A490 BOLTS MUST ALWAYS BE PRE -TENSIONED. CODES AND LOADS WHEN MULTIPLE BUILDINGS ARE INVOLVED, SPECIFIC LOAD FACTORS FOR DIFFERING OCCUPANCIES, BUILDING DIMENSIONS, HEIGHTS, FRAMING SYSTEMS, ROOF SLOPES, ETC., MAY RESULT IN DIFFERENT LOAD APPLICATION FACTORS THAN INDICATED BELOW. SEE CALCULATIONS FOR FURTHER DETAILS. Building Code: 2006 International Building Code Z Fast -Track Building Use:Low Hazard: Ag, Storage, Temp, Collateral Gravity: 0.00 psf (Not Inducting bldq wt) LIVE LOADS AND RAINFALL Lire Load 20.00 psf (ReducLk) Ranfolk 4.00 inches per hour SNOW LOAD Roof Snow: 25.00 psi, Flat Roof Snot 25.00 psf Snow Exposure Category: 3 Sheltered Snow Importance: 0.800 Thermal Category (Factor): Unheated (1.20) WIND LOAD Wnd Speed: 85.00 mph, Wind Exposure: C Basic Wind Pressure: 11.66 psl find Imporonce factor: 0.870, Ft= Topographic Factor: 1.0000 Wnd Enclosure: Enclosed, 0.180 Note: Al windows, doss, skylights arld other covered openings must be designed for the specified obove lend foods EARTHWAKE DESIGN DATA Lateral Face Resisting Systems using Equivalent Face Procedure Mopped Spectral Response - Ss125.00 xg, S1:45.00 Xg Seismic Hozord / Use Group: Group 1 Seismic Performonce / Design Category D (See Bolt Tightening Note Above) Seismic Snow Load: 0.00 psl Seismic Importance: 1.000 Sod Pro IT Type: Still sol (D, 4) Design Spectral Response - Sds: 0.8333, Shc: 0.4650 Ordinary Sled Moment frames Frame Redundancy Fador:1.3000 Framing R-Foctor: 3.SD00, Frame Seismic Factor 1%# 0.2381, Design Bose Shear = 0.2381 W Ordinary Sled Concentric Braced Frames Brace Redundancy Focla:1.3000 Bracing R-Foctor: 3.2500, Brae Seismic Festa (%s): 0.2564, Design Base Sheor = 0.2564 W BLD p9 m00e THIS DRAWING, INCLUDING THE INFORMATION HEREON, VP REMAINS THE PROPERTY OF BUILDINGS. 1 q \ /P�CSA 66, COVER SHEET IT Is PROVIDED SOLELY FOR ERECTING THE BUn.DING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND �) ,� ButoER Grant Steel BuOdngs and Concrete Systems, Inc DIB SHALL HOT BE MOOIFIED REPRODUCED OR USED FOR ANY OTHER PURPOSE V;nNhgm PRIOR WRITTEN `ASAtt �� G`SfOMER City of Pat Townsend DATE 12/6/2(108 APPROVAL of w Bu1L111 % ` \TtlfiBd,i� VP BUILDINGS THE ERECTOR IS SOLELY L ouTaN GENERAL CONTRACTOR ANO/OR RESPONSIBLE FOR ACCURATE. GOOD ORALITY WORKMANSHIP -- ACCREDITED Porf Towruerd, Washington VARCO PRUDEN DRAM / CHECK IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS DRAWu1G, DETAILS REFERENCED IN THIS DRAWING, VIM AC 172 MLG PROJECT CIL of Port Townsend Golf Course Buil Y Blu A *Scope Sledom Cpany w BUILDINGS ERECTION GUIDES AND INDUSTRY STANDARDS PERTAINING TO PFRWR 7.1c PAGE ERECTION. INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BU4DER5 PO/2008VPC-26 _. VPC VERSION: 1 17/A/7MR R•1P15 FILENAME: Pn<i_Yrnr4VPr. BUILDER/CONTRACTOR RESPONSIBILITIES FIRE CODE COMPLIANCE VP Buildings follows the guidelines as outlined in the AISC and MBMA Codes of Standard Produce. thlyResponsibility of the project design professional and builder to comply with local fir Buildings standard product specifications, design, fabrication, quality criteria shall govern all wivaudlElgssonsideration of, but not limited to, building use and occupancy, all building constr stipulated otherwise in the contract documents. In case of discrepancies between VP Buildingapstrdoorclt%krasnents, egress requirements, fire protection systems, etc. Builder shall odvi and plans for other trades, VP Building structural plans shall govern. special requirements to be furnished by VP. It is the responsibility of the Builder to obtain approvals and SSR ro f fire tested to ASTM E108 -93 -Gloss A rating. p y pp permits from all governing agere t of is ore defined by IBC as Fire Class A roof assemblies (Sec 1505.2). jurisdictions as required. Approval of VP Building drawings constitutes the builders acceptan o st,$el r of systems are available for FM Class 1 fire rating. interpretation of the contract purchase order. Unless specific design criteria concerning interRce1 sWr'g0�d fire rated assemblies listed as Design No. P265, P268 and P516. details ore furnished as part of the contract, VP Buildings design assumptions shall govern. NS VP engineers are not Project Engineers or Engineer of Record for the overall project. VP e�Ierfsprl -- sealed engineering design data and drawings for VP supplied material as port of the overall Mf7tjilikalknsulo kb4s building from details and instructions contained on these drawings must others to obtain permits, approvals, and coordinate with other trades. The Builder or A/E fipmtiage bes'pldn@ Wding engineers, or other licensed structural engineer. This includes, but is for the overall project coordination, including coordination with appropriate inspection and test"oegbrodemofAtir wolf cladding, removing or moving any flonge braces or rod braces, cutti interface and/or compatibility of any materials not furnished by VP ore to be considered ondJowardiviatBuivsbyor RTU's, correction of fabrication errors, etc. The owner shall not impose I the builder or A/E firm. structure beyond what is specified for this building in the contract documents. VP Buildings responsibility for the consequences of any unauthorized additions, alterations, or added loads VP BUILDINGS CERTIFICATIONS cooe regulations PLANT SPECIFIC CERTIFICATIONS Efecti0 Notes e VP of an Alobamo California Missouri No. Carolin Wisconsin IAS FA -377 FA -240 -388 FA -376 FA -378 CSA -A660 VPBULO PBM00 VPBW19 CWB Div. 1 iv. 1 Div, 1 Los Angeles, Div. 1 - ovide drainage of trapped moisture. over VP shop coat that the pointing contractor verifies compatibility between his finish coal and VP's shop Div. 1 be ouston. inApproved 'OLD A proved g Weopdei s for ads(* this Type 1 Fob SP02-002 Butyl Sealants - Service Temperature Range (Degrees): Min -60F (-51C); Max 220F (104C) rtq c no to-tp� s ru :lure. Fab ID 24 INDEPENDENT MEZZANINES s in mess o o��%i�Ca'ti15 s 0 Fob 10(1 12 isolation from the VP building has been provided to avoid structural damage due to differential movements, or CONSTRUCTION & ERECTION RESPONSIBILITY Per VP Builder Memo #BM -001, if the builder intends to invoice VP Buildings for modificotio The Builder is responsible for construction in strict accordance with VP Buildings "FOR CONS111.=Nihe builder must notify VP Buildings immediately, and obtain a Work Authorization frwillo drawings and all applicable product installation guides. VP is not responsible for work done privE1 tonprotlaedilfg. All final claims must be submitted to VP Buildings with all supporting drawings that ore not marked "FOR CONSTRUCTION", nor any drawings prepared by others. within 30 days of the building completion. Claims submitted without work authorizations, or no be a cepted Correction of minor misfits, shimming and plumbing, moderate amount of reaming, drilling, As erected field assemblies of members shall be as specified in 2006 MBMA Metal Building n be minor welding are considered by Code of Standard Practice to be port of erection are (in Canada - CSA S16-01 Clouse 29.7), which generally require L/500 tolerance of ossembff stb claim reimbursement. *For buildings with top riding bridge crones see Crone Data drawing for column plumb tolera�,�e,CRETE/MASONRY/CONVENTIONAL STUD WALLS The building erector shall be properly licensed and experienced in erecting metal building systlWfesengih/el8vddponsible for the design of the wall system is responsible for coordinating wit!riC a�v%Wip n$eRPrts a responsible for having knowledge of, and shall comply with, all OSHA requirements and all VAh86ipt1gsViegy wall to steel compatibility issues such as drift and deflection compatibility, special ��$e Roof System - #ER -5621 e safety criteria. The builder is responsible for designing, supplying, locating and instollingdbitlyWrprld wall to VP steel connections. All fasteners, sealant and counter flashing of wall systems°QAQI (gib Roof and Wall - #ER- 879 pports and bracing during erection of the building. VP bracing is designed for code requibW Pttaddeditlty contractor. The engineer responsible for the wall shall design the anchorage to VP sY McR(tn§Noll - j)ER-4879 building completion and shall not be considered as adequate erection bracing. See VP BuildeteMerde #&A§i9lGA with Code required forces including ASCE7-05 Sec, 12.11. State of Florida Product Approvals EXISTING STRUCTURES PANELS a 8245 - VP PR and VR Walls %% 8043 - VP SSR and PR Roof VP must be advised of any existing structure that is within 20 ft. of VP's building. Looding®iloE�ptpgtiWidNr9, Snherent characteristic of cold formed steel panels. It is the result of several foc;rd7".11 - VP SSR Tuf-Lite may be affected when adjacent buildings are within this distance. VP cannot be responsible idorudbeirdRRi00 Otresses in the raw material delivered to VP, fabrication methods, installation procedu a$ 74 - VP PR Roof Tuf-Lit loading of existing buildings. post installation thermal forces. Thru fastened panels will exhibit some dimpling when instolled, esp oyt BRACIN insulation is installed between panels and secondary supports. Dimpling can be minimized by carefu 29.1 - VP SLR (Listed as pan -Lok HP) installation, taking care not to over drive fasteners. M 3741-R1 - VP TextureClod (Li ted as Tronsomerican Strukluroc, Inc.) Tension brace rods work in pairs to balance forces caused by initial tensioning. Care must a token while D dd Co. Product Approval is phenomenon that is caused by wind gusts lifting up on the roof panels and°t�en n in tightening brace rods so as not to cause accidental or misalignment of components. All ro cc4kkt,d9�E'l �8 Panel Rib Roof; Panel ib Wall; and Vee Rib Wall installed loose and then tightened. Rods should not exhibit excessive sag. For long or he -0 ,°o�IB esAil panels experience this action to some degree, especially with concealed clipp Pa. oborotor Approvals it may be necessary to support the rod at mid -boy by suspending it from a secondary me 6e . and Roof rumble noise may be m nimized by providing a layer of blanket insu�iflRAi161�fdi ri y PP Is ponels and any hard support surface such as steel secondary members, substrates such as ply,R§tUL(jTGKX-113; SSR Co posite Roof Class 90-ULffTGKX-113A; SSR Roof w/Super Bracing for seismic or wind loading of objects or equipment that are not a port of the VP ll�r ANAs dnLAiftoord insulation. A minimum of 3 inch thick blanket is recommended over steel sgbxft�-UL#TGKX-32B; designed by a qualified professional to deliver lateral loads to primary frames and rod brocingedlfFfB, or 2 inch over substrates. Panel Rib Roof UL Class 60 -UL# GKX-60; Panel Rib Roof UL Class 90-UL#TGKX-64; Equipment bracing and suspension connections must not impose torsion or minor axis loads, or cause local y P SL Roof Class 90-U #TGKX-90 distortion in any VP components. VP accepts no responsibility for design or installation of b4fi �W � , �a+pling, and roof rumble do not affect the structural integrity or weather tightssM�utuci proved Assemblies not furnished by VP. on cd ins clot -grounds for rejection of panels. SSR Roof Systems ore approved various type applications and listed in FM Approval Guide FIELD WELDING The SSR/SLR joint detail is designed with an interlocking feature for ease of installation. However, `44isGo SSR (0.0227" Nominal), is available in Class 1-60, 1-75, 1 -90. 22Go SSR (0.0271 All field welding shall be done at the direction of a design professional, and done in occorddgWrjjh)Se,,�{�p�,.,J"olled SSR/SLR panels be secured to the secondary structural members and propolllprrieal)heiB available in Class 1-75, 1-90-, 1-120. requirements (AWS in USA, CWB in Canada) by welders qualified to perform the welding as cippefea°bo ure from the job site each day. SLR Roof Systems ore approved i various type applications and listed in FM Approval Guide applicable welding procedure specification (WPS). A WPS shall be prepared by the contractor Ediftk Bt0welding 24 Go SLR (0.0227" Nominal), is available in Class 1-75 and 1-120. variation specified. Unless otherwise approved, use E70ksi yield, low hydrogen electrodes. T�r� t t r shnu� Potents provide for any special welding inspection as required by code. VF'�`°�urft Fe� and- VP's domed skylight hove been tested to support a 300 Ib. load over a 1 sq. ft.. Vpfl EolosTrussed Purlins : pal. 6,M,881 pot. 6,912,787 well as uniform gravity and uplift load test. Local building departments may require added fall restraint due DELIVERIES to conditions that may affect the skylight structural integrity. It is the responsibility of the builder to determine and provide any added fall restraint under the skylight as may be required by your building NOT F CONSTRUCTION It is the responsibility of the builder to hove adequate equipment ovoilobl OLEt�heN 'ahRs ,Aar o d rucks in ns Dile-011 W-LUOw° NE r6010 MM" MOiEm, p y qpW,Y,t�i q� n¢vub °E amrtnx a w 9Ulnecs. VP Buildings Efecti0 Notes T FF ITISPltll mBED w x rdl E E 3200 Players Club Circle Memphis TN 38125 a safe and timely manner. The Builder will be responsible for all retenti nvAbTLtI�dN� 04 1 �twRcode of job site unloading delays, ft1OUVPENGNEER55EALD�'PPin ge systems must be designed by the prof ENGINEER INEE�a an Gri f SIW W od Concrete m fM ,oa f NpTEPP ar draino a designs, overflow S Per VP Builder Memo (JBM-001, claims for damage or losses MUST ben tex�°EOsNEPeNIDl i PBP �rv� 9 9 that ° 0WRM dPalI'MiSexi a X12/6/2006 s�r re nsible to ensure rima Uniform Commercial Code. It is critical t of damages or loss be noted n t!5@R"yl1� yptfAl akvided as required f r the required i prermet r rid at volt onditi ns rag—, °um+ Tons<nd Wosfmgtm VP BUILgNGS -C0 1_ fora d Port T°.mmd Cdl Caxx 8sTi r° little recourse with the carrier. Immediate upon delivery of material, m teriol !u Ton' fes die eTi tJriDy�Tfi'Ig'ng• mr suo- Y P ry q .x:E °a R u5E aNis 7.Ic EMGE 1 Builder against quantities billed on the shi in document. Neither the M nufacturer nor the P T �� 419:17 20WOC-Y6 w,c wAsxx' -TrakVPC responsible for material shortages against quantities billed on the shipping document if such hort0gees areafn°t , P POP shop VPs coat i to provide rotectio for the steel mem r n n r n cin noted on the shipping documents upon d ivery of material and acknowledged by the carriers AY. nq n— inh �itp storuge and during prp�f;^n Stnni nrd Abo-p-formulation materials ca eeeied i bu dies, boxes, a erates, sherteges at be reported ;r i Should products get wet, bundled and crated materials must be unpacked and unbundled im g t�g aEq hen exposed to environmental conditions. Members shall be kept free of the ground and properly drained 'dur ng job site storage. It is the Builder's responsibility to ensure that if a finish coot is being applied - ovide drainage of trapped moisture. over VP shop coat that the pointing contractor verifies compatibility between his finish coal and VP's shop >LANTS coat. See VP Builder Memo #BM -001 & #BM -002. 'OLD Sealants shall be applied in strict accordance with VP details or weather tightness will be compromised. Sealant must be applied in temperatures and weather conditions consistent with labeling. Butyl Sealants - Service Temperature Range (Degrees): Min -60F (-51C); Max 220F (104C) Tape seolonts - Service Temperature Range (Degrees): Min -60F (-51C); Max 212F (tOOC) INDEPENDENT MEZZANINES Independent mezzanines must be designed by a professional engineer. The engineer must ensure that proper isolation from the VP building has been provided to avoid structural damage due to differential movements, or inadvertently apply loads to the VP structure. VP accepts no responsibility for the design of the independent iJDmm / `• I/2"DIAMETERIETER 'J 2 1/2" (64mm) CONCRETEETE ANCHORS i52mm p E N PROJECTION (U.O.N.) (BY BUILDER) E E 4 N h o E BOTTOM OF COLUMN o N F N _ 1O w in E BASE PLATE ELEV. E H W �s 5 I E WTI H LU m 2 1/2' 4' N r 2 1/2"I L �,2 1/2 J 1 1/4' OPENING WIDTH 1 1/4' 61mm F 64mm 102-64mm i—F� 81 .mm 32mm 32mm L a+ L NOTE: i' (25mm) PROJECTION ABOVE BOTTOM OF JAMB CLIP i(2),3/4'Die. A36A.RDds D2(2),A/4'Ole. ANA.Rafs D3'(4W4'Die. AMA.Rods TYPICAL ANCHOR raw=6'L'To' Plemw�'L'�o' P1a°eW�'L=+`r ROD PROJECTION FRAMED OPENING DETAIL O� Hn I 00 f 0 0 I I o M 7 N to i 00 THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCTOF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. 10'-0" - t"I 10'-0" y15-9= 20'-0" 20'-0" 20'-0" 60'-0" ANCHOR ROD PLAN RnislW Floor Elewlion = 100'-0' (unless Noted Otherwise) M HEREON. vARIES BOTTOM OF '.[j COLUMN BASE PLATE � LSTO = 1/2' (13mm) FLUSH = 0' (Omm) TYPICAL COLUMN BASE PLATE DETAIL 1. CONCRETE. GROUT, ANCHOR ROOS, AND ANT OTHER EMBEDDED ITEMS ARE TO BE FURNISHED BY OTHERS, 2. MISS OTHERWISE SPECIFIED, MANUFACTUER ASSUMES COMO" HAS A COYPRESSVE STRENGTH OF 30DO PSI 3. ANCHOR RDD DIAMETERS WERE DETERMINED BY ALLOWABLE SHEAR AND TENSOM PER NSC SPEC6IGTIONS (FY-mxsj) ANCHOR ROD LENGTH, EFFECTS OF EMBEDDED ANCHOR ROD EDGE ORMENSIONS AND METHOD OF TRANSFERRING FORCES FROM AMCNOR 005 * TO FOOTINGS ARE TO BE DETERMINED BY OTHERS. 4. UNLESS OTHERWISE SPECs1ED. ANCHOR RODS ARE DETAILED WITH A PITCH AND CNZ OF S INCHES ASSUMING 'CAST -IM -RACE' ANCHOR RODS WITH SMUG ncHT' CONHECTONS. a FOUNDATION MUST BE LEVEL, SOLAR AND SMOOTH, ANCHOR RODS MUST DE ACCURATELY PLACED AS SHOWN ON THIS DRAWING OR STEEL WILL NOT FIT. e. THE BUEDER 6 RESPONSIBLE FOR ACCURATE SETTING OF ANCHOR RODS MTNW INOINOIIAL COLIIYN X00 GROUPS -TOLERANCE a -1/e'. DRENSONS f[TWEEN ANCHOR Roo GROUPS - TOLERANCE +-1/4-. ERECTION Or STEEL COMPOHENTS MAT BE AND PLUMB PER MOM CODE OF STANDARD PRACTICE. T. DESIGN LOADS AND REACTORS ARE FURNISHED IN THE REACTIONS REPORT. VP Buildings 3200 Players Club Circle Memphis TN 38125 iEV I DATE 1 Br 1 DESCRIPTION NTS I') /A MAnn 2 -10 -IR NOT FOR CONSTRUCTION IN ROD PLAN Grant Steel Buildings and Concrete City of Port Townsend Pal Townsend, Woshington. City of Port Townsend Golf Course Pot 2008VPC-16 rn i_T., " JOB VVP BUILDINGS VARIED PRUDE.rAG31 A 81-SCOP.Steel COmpOn AVC VERSION: 7.1E i% 3 D 01 6y !`1 2 I 2 iD 3 D D1 10'-0" y15-9= 20'-0" 20'-0" 20'-0" 60'-0" ANCHOR ROD PLAN RnislW Floor Elewlion = 100'-0' (unless Noted Otherwise) M HEREON. vARIES BOTTOM OF '.[j COLUMN BASE PLATE � LSTO = 1/2' (13mm) FLUSH = 0' (Omm) TYPICAL COLUMN BASE PLATE DETAIL 1. CONCRETE. GROUT, ANCHOR ROOS, AND ANT OTHER EMBEDDED ITEMS ARE TO BE FURNISHED BY OTHERS, 2. MISS OTHERWISE SPECIFIED, MANUFACTUER ASSUMES COMO" HAS A COYPRESSVE STRENGTH OF 30DO PSI 3. ANCHOR RDD DIAMETERS WERE DETERMINED BY ALLOWABLE SHEAR AND TENSOM PER NSC SPEC6IGTIONS (FY-mxsj) ANCHOR ROD LENGTH, EFFECTS OF EMBEDDED ANCHOR ROD EDGE ORMENSIONS AND METHOD OF TRANSFERRING FORCES FROM AMCNOR 005 * TO FOOTINGS ARE TO BE DETERMINED BY OTHERS. 4. UNLESS OTHERWISE SPECs1ED. ANCHOR RODS ARE DETAILED WITH A PITCH AND CNZ OF S INCHES ASSUMING 'CAST -IM -RACE' ANCHOR RODS WITH SMUG ncHT' CONHECTONS. a FOUNDATION MUST BE LEVEL, SOLAR AND SMOOTH, ANCHOR RODS MUST DE ACCURATELY PLACED AS SHOWN ON THIS DRAWING OR STEEL WILL NOT FIT. e. THE BUEDER 6 RESPONSIBLE FOR ACCURATE SETTING OF ANCHOR RODS MTNW INOINOIIAL COLIIYN X00 GROUPS -TOLERANCE a -1/e'. DRENSONS f[TWEEN ANCHOR Roo GROUPS - TOLERANCE +-1/4-. ERECTION Or STEEL COMPOHENTS MAT BE AND PLUMB PER MOM CODE OF STANDARD PRACTICE. T. DESIGN LOADS AND REACTORS ARE FURNISHED IN THE REACTIONS REPORT. VP Buildings 3200 Players Club Circle Memphis TN 38125 iEV I DATE 1 Br 1 DESCRIPTION NTS I') /A MAnn 2 -10 -IR NOT FOR CONSTRUCTION IN ROD PLAN Grant Steel Buildings and Concrete City of Port Townsend Pal Townsend, Woshington. City of Port Townsend Golf Course Pot 2008VPC-16 rn i_T., " JOB VVP BUILDINGS VARIED PRUDE.rAG31 A 81-SCOP.Steel COmpOn AVC VERSION: 7.1E O 1 6" F'Imension Key I. !2 X 1 1/2 A325 SNUG TIGHTENED BOLTS FOR PURLIN TO -WE, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. 0 0 O -I T r Y O 0 W 002 CX002 CX001 03Rq.�2o, 03�P220� 03)Yq1300 13,31, 059_1 1 03Rq�300 o3�P2�oo o3Rg22o, 03�P220� CGX001 s x x w w N O x 0 w CGX001 CX001 CX002 CGX002 20'-0" �— 19'— 6" 1 60'-0" PRIMARY AND ROOF BRACING PLAN THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. QLD09 ® 0 C3 NOT FOR CONSTRUCTION Shope Nome = Fast -Trak THIS DRAWING. INCLUDING THE INFORMATION HEREON, J REMNNS THE PROPERTY OF VP BUILDINGS. VP Buildings -PRIMARY AND ROOF BRACING PLAN K PROVIDED SOLELY FOR ERECTING THE BUILDING 3200 Plo Players Club Circle y Memphis TN 36125 knTNDESCRIBED IN _THE APPLKI�BLE�NASE ORDER AND ANy THER YODIF YNDIiiOUT DOR N D i0R APPROVAL OF VP BUILDINGS. MRRTE REy DATE By BOLOER OESCRMICN Gront Steel Builth s and Concrete S tems, Inc 'I°B F THE GENERAL CONTRACTOR AND/OR ERECTOR 5 SOLELY cusTO " City of Port Townsend wTF12 6 / RE5PON9DLE fOR ACCURATE, GOOD d1ALITY M'ORKNANSHIP IN ERECTNo THIS BUILDING IN CONFORMANCE WITH THIS LOCATION pal Townsend, Washington VP BUILDINGS IRA a City of Port Townsend Goll Course Building vARDO PRUDEH DRAWING, NLS REFERENCED IN THIS DRAWING, ALL API'E VP ERECTION GUIDES.PROJE III AND INDUSTRY STANMRDS PERTAINING TO PROPER ERECTgN, IRCLUgNC THE CORRECT USE OF TEMPORARY NTS FAALDCRS Po/ 20OW-26 A BlueScopa Steel Ca^PO VPC vERs*N; 7.IC PACE 4 BRACING. 17/1;hnFt A 1419 FLEN"IE' Fast-Trock.VPC 0Frame Member Schedule WebThk. Part Mem Width CGX001 1 5" )01 2-4 5" BGX002 5-7 5" CGX002 8 5" EGX001 9 5" EGX002 10 5" Thick WebThk. Deptht Depth2 Approx.Lgth .0590 2@.0590 8 1/2" 8 1/2" 10'-8 7/16" .0730 2@.0730 81/2" 81/2" 21'-011/16" .0730 2@.0730 81/2" 81/2" 21'-31/2" .0590 2@.0590 8 1/2" 8 1/2" 10'-8 7/16" .0590 2@.0590 81/2" 81/2" 13'-315/16" .0590 2@.0590 81/2" 81/2" 13'-315/16" M 9 18'-8" Ridge Ht. 8 3 1/2" 7 5/8" 6 V-813/16" 5 V-6 3/4" 4 3'-0" 3 3'-51/4" 2 4'-0" 1 1 5/8" F-'- Imension Key 12 X 1 1/2 A325 —WE. GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. Detail BR25C9 BR25C9 Cee Mark No D o' \ 6 4 00Q:12 Frame Clearances Horiz. Clearance between members l(CGX001) and B(CGX002): 38'-3 3/4" Vert. Clearance at member l (CGX001): 10'-9 7/16" Vert. Clearance at member 8(CGX002): 10'-9 7/16" Vert. Clearance at member9(EGX001): 13-4 1/16" Vert. Clearance at member 10(EGX002): 13'-4 1/16" Finished Floor Elevation = 100'-0" (Unless Noted Otherwise) A ~o 6 2/',/„ 4.000 :12 ,00p:'2 4 ® 41-'9 23'-0" 40'-0- FRAME CROSS SECTION, AT FRAME LINE(S) 1 CBolt Connection & Plate Schedule Id Qty ASTM Bolt Bolt Plate Rows Rows Tension Washer Dia. Length Thick. Out In Bolt A 4 A325 1/2" 1 1/2" 3/8" 1 1 B 6 A325 1/2" 11/2" 1/4" 1 BLD AV 9 a, NOT FOR CONSTRUCTION Shape Nome = Fast -Trak Wall 1, Frorm t THE VP ENGINEER'S SEAL APPUES THIS DRAWING. INCLUDING THE INFORMATION HEREON• REMAINS THE PROPERTY OF VP BUILDINGS. VP Buildings _ 1 ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE IT IS PROWDEO SOLELY FOR ERECTING THE BUILDING TMHEEWAPPLICABLE PURCHASE ORDER AND 3200 Ployers Club Circle Memphis TN 38125 FRAME S SECTION AT FRAME LINE(S) REQUIREMENTS ENG NEER'SCIFIED BY VR SEALL DOES SDEHAStCMBNEOD BINE Atn OTHER PURPOSE wDItHOUT�D R USED FOR APPROVAL OF VP BUILDINGS. TEN REVDATE By �PT� DESCRIPTION 11R Grant Steel Build s and Concrete S tems, Inc doe / NOT APPLY TO THE PERFORMANCE THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY pAT �2�6�2C OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP CUSTOMER City of Part Townsend �PR.W LOCATION Port Townsend, Washington EXCEPT TO ANY DESIGN OR PER- RESPONSIBLE FOR ACCURATE GOOD DUALITY WORKMANSHIP IN ERECTING THIS ACCURATE IN CONFORMANCE WITH THIS /�O MLC FORMANCE REQUIREMENTS SPECIFIED BY VP. DRAWING. DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP ERECTION GUIDES. A BiueScope Steer Com PROJECT City of Part Townsend Golf Course Building AND INDUSTRY STANpARp$ PERTAINING To ppppER NTS BUILDER'S P0/ 2DDB�TT(.-26 MC YERSKW: 7.1c AGE P 5 ERECTION. INCLUDING T/IE CORRECT USE OF TEMPORARY BRACING. 17/F. /?mR A -10•7n FILENAME: FR<I-T—kVPr. - 0Frame Member Schedule WebThk. Part Mem Width CX001 1 T. 001 2 5" hbX001 3 5" CX002 4 5" Thick WebThk. Depthl Depth2 Approx.Lgth .3125 .1345 1'-0" 1'-3" 11'-5 3/8" .1875 .1644 1'-7" 9" 20'-111/16" .1875 .1644 9" V-7" 20'-111/16" .3125 .1345 1'-0" 1'-3" 11'-5 3/8" 10 18'-8" Ridge Ht. 9 3 1/2" 8 5/8" 7 V-813/16" 6 9" 5 9 3/4" 4 3'-0" 3 3'-5 1/4" 2 4'-0" 1 1 5/8" 17171mension Key 1, /2 X 1 1/2 A325 SNUG TIGHTENED BODS FOR PURLIN TO AE, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. D 0p0:,2 �o ®a ,9" -�r Frame Clearances Horiz. Clearance between members l(CX001) and 4(CX002): 37'-2 7/16" Vert. Clearance at member l(CX001): 10'-0 1/16" Vert. Clearance at member 4(CX002): 10'-0 1/16" Finished Floor Elevation = 100'-0" (Unless Noted Otherwise) A °/ ?1',," 4, 000. /? 4 ® 4'-9. 40'-0" FRAME CROSS SECTION AT FRAME LINE(S) 2 0 N O N LO O a_ U M ME31 0 0 E I CBolt Connection & Plate Schedule Id Qty ASTM Bolt Bolt Plate Rows Rows Tension Washer Dia. Length Thick. Out In Bolt A 6 A325 3/4" 2" 3/8" 2 1 B 4 A325 3l4" 2" 3I8" 1 NOT FOR CONSTRUCTION \\� C: Shape Name =Fast -Trak Wall 4, Frame 2 THE VP ENGINEER'S SEAL APPLIES THS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS. VP Buildings FRAME CROSS SECTION AT FRAME LINE(S) 2 ONLY TO THE WORK PRODUCT OF IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING 3200 Pla ers Club Circle %r Memphis TN 38125 VPANODESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. DESCRIBED IN THE APPLN:ABLE PURCWASE ORDER ANO SIULL NOT IE�TRODUCED OR USED FOR ANY i8 PRN)R WRITTEN �. � pTpN BULIER grant Steel Builth and Concrete Systems, Inc JOB E THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT APPROVK OF VP BIALUNGS. ATE T0141 City of Port Townsend TRE CONTRACTOR AND/OR ERECTOR IS SOLELY MT(2/6/2t 1 OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- GENERAL RESPONSIBLE FOR ACCURATE GOOD IXIALITY Wg7I(YANSNIP IN ERECTUN, THIS BUILDING bI CONFORMANCE WRH THISvARca VP BUILDINGS PRUDEN LOCATION Pod Towmend Washington �'/CNEC Or FOR REQUIREMENTS DRAWING. DETAILS REFERENCED IN TH75 pRAMNC, ALLAPPLIrABLE W ERECTION GUIDES LG City of Pori Townsend Coll Course Building SPECIFIED BY VP. SPECIFIED INDUSTRY STANDARDS PERTAININd TO pRppER ERECTION INCLUDING THE CORRECT USE OF TEMPORARY A BIII!$l;o(NI Slod Compo wt YERsom: 7,1C PAGE 6 BULOER'S Po/ 20OW-26 BRACING. NTS t7/A/7rYN B 1997 "LE"""E° Fast-Trock.VPC 0Frame Member Schedule Part Mem Width CX002 1 5" 301 2 5" RBX001 3 5" CX001 4 5" Thick WebThk. Depthl Depth2 Approx.Lgth .3125 .1345 1'-0" V-3" 11'-5 3/8" .1875 .1644 V-7" 9" 20'-1 11/16" .1875 .1644 9" 1'-7" 20'-111/16" .3125 .1345 V-0" V-3" 11'-5 3/8" 10 18'-8" Ridge Ht. 9 3 1/2" 8 5/8" 7 V-8 13/16" 6 9" 5 9 3/4" 4 3'-0" 3 3'-51/4" 2 4'-0" 1 1 5/8" F'Imension Key 1 /2 X 1 1/2 A325 ,,.,ME, GIRT TO FRAME, AND GIRT TO CUP CONNECTIONS UNLESS NOTED OTHERWISE. 1. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. D o' \ 1 4 000.2 2ti ,1" • 4 ®� �9" 0 0 N Frame Clearances Horiz. Clearance between members l(CX002) and 4(CX001): 37'-2 7/16" Vert. Clearance at member 1(CX002): 10'-0 1/16" Vert. Clearance at member 4(CX001): 10'-0 1/16" Finished Floor Elevation = 100'-0" (Unless Noted Otherwise) A �o /„ 9 000.T2 4 ® 4'-91 0 0 0 N THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER. FORMANCE REQUIREMENTS SPECIFIED BY VP. 40'-0" FRAME CROSS SECTION AT FRAME LINE(S) 3 Shape Name = Fost-Trock Wan 4, Frame 3 HEREON, O LO O N LO O a U ❑h f 0 03olt Connection & Plate Schedule Id Oty ASTM Bolt Dia. A 6 A325 3/4" B 4 A325 3/4" , VP Buildings 3200 Players Club Circle Memphis TN 381 EV DATE a DESCRIPTION I NTS Bolt Plate Rows Rows Tension Washer Length Thick. Out In Bolt 2" 3/8" 2 1 g@ 2"— 3 1 BLD Q 9 ®® 0 kV NOT FOR FRAME CROSS SECTION AT FRAME LINE(S) 3 Grant Steel Buildings and Concrete Systems, Inc City of Port Townsend Port Townsend, Washington City of Port Townsend Gall Course Building F LEN E: F-I-T—It VPC JOB f VVp CO BUILDINGSPRUDEN VIJiF31LG7 A &ueSoope Sled Compo VPc YERs*N: TIC 0Frame Member Schedule FRAME CROSS SECTION AT FRAME LINE(S) 4 Part Mem Width Thick. WebThk. Depthl Depth2 Approx.Lgth Detail Cee Mark No CGX002 1 V. .0590 2@.0590 8 1/2" 8 1/2" 10'-8 7/16" 001 2-4 5" .0730 2@.0730 81/2" 81/2" 21'-011/16" b(3XO02 5-7 5" .0730 2@.0730 81/2" 81/2" 21'-31/2" CGX001 8 5" .0590 2@.0590 8 1/2" 8 1/2" 10'-8 7/16" EGX002 9 5" .0590 2@.0590 81/2" 81/2" 13'-315/16" BR25C9 EGX001 10 5" .0590 2@.0590 81/2" 81/2" 13'-315/16" BR25C9 9 18'-8" Ridge Ht 8 3 1/2" 7 5/8" 6 V-8 13/16" 5 V-6 3/4" 4 3'-0" 3 3'-5 1/4" 2 4'-0" 1 1 5/8" F-I'limension Key 1'. /2 X 1 1/2 A325 SNUG TIGHTENED BOLTS FOR PURLIN TO ..-DIE, GIRT TO FRAME, AND GIRT TO CLIP CONNECTIONS UNLESS NOTED OTHERWISE. 2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAME SIDE OF THE WEB AS THE HILLSIDE WASHER. D Or \ 6 4 OOQ•�2 Frame Clearances Horiz. Clearance between members l(CGX002) and 8(CGX001): 38'-3 3/4" Vert. Clearance at member l(CGX002): 10'-9 7/16" Vert. Clearance at member 8(CGX001): 10'-9 7/16" Vert. Clearance at member 9(EGX002): 13'-4 1/16" Vert. Clearance at member 10(EGX001): 13'-4 1/16" Finished Floor Elevation = 100'-0" (Unless Noted Otherwise) A 4.000 4 ® 4'-9, 23'-0" 1 8'-6" 40'-0" FRAME CROSS SECTION AT FRAME LINE(S) 4 molt Connection & Plate Schedule Id City ASTM Bolt Bolt Plate Rows Rows Tension Washer Dia. Length Thick. Out In Bolt A 4 A325 1/2" 11/2" 3/8" 1 1 B 6 ,r'n 0 A325 1/2" 1 1/2" 1/4" 1 JBg D® SDI (1 9 r, NOT FOR CONSTRUCTION Shope Nome = Fost-Trak Woll 4, Frame 4 THE VP ENGINEER'S SEAL APPLIES HEREON, INCLUDING OF VPIN BUILDINGS. REMAINS THE ,P VP Buildings AT FRAME LINE(S) 4 ONLY TO THE WORK PRODUCT OF IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING 3200 Players Club Circle Memphis TN 38125 FRAME CROSS SECTION VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES DESCRIBED IN IN APPLICABLE PURCNASE ORDER AND SHALL NOT BE YOgflED RE DOR USED FOR InR PURPOSE W11TgUT WRITTEN APPROVAL OF VP BUILDINGS. REV OATCJay � p7gN BUlOER (�' onl Steel Bulldl and Concrete Systems, Inc�BUILLDINIGS '� NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT q/5101ER City of Pat Townsend THE GENERAL COMRACTOR µD/OR ERECTOR 6 SOLELY OATT12/6/2G 1 OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- RESPONSIBLE FOR ACCURATE C000 WALITY WORNMµSINP W ERELONG IVIS BUILDING IN COHFORUANCE WfTN THIS �ABIwScope LOCATION Pat Townsend, WOSITIn9tOrl FORMANCE REQUIREMENTS DRAWING DETNLS RE RENCEO IN THIS DRAWING. ALL APPLICABLE VP ERECTION GUIDES SININ Com ms'µ/CNEO MLG PROJECT City of Port Townsend Goll Course Build'mg SPECIFIED BY VP. µ0 INDUSTRY STµDARDS PERTAINWd TO pRpp[R IHCLUOWG TME CORRECT Oi TEMPORARY NTS BULDEWS POE 2008VPC-26 Vpc VERs*N; 7 I PAGE B ERECTION, USE BRACING. 11101W R•10d5 FILENAME: FmI-TfrckVPC 0Sag Angle Schedule Id Qty Mark No 1 3 SA3013 2 24 SA4107 3 6 SA0025 See SED: BR09A4 for installation Secondary Part Schedule 1R21311 Mark Part Thick. E1 03EH1911417 • 0.0590 E2 01EH1911417 0.0590 P2 24P2301014 0.0820 P3 40P2202417 0.0590 Spacing 3'-1 1/2" 4'-g" 5/8" O 1 6" F-imension Key V. i NOTED, USE 1/2 X 1 1/2 A-325 SNUG TIGHTENED BOLTS FOR .JN LAP, PURLIN TO FRAME, FIANCE BRACE TO FRAME, AND FLANGE BRACE TO PURUN CONNECTIONS. 2, WIND, FLANGE, AND PURLIN BRACING ARE AN INTEGRAL PART OF THE ROOF STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF ROOF BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. G>- 0 Sag / 0 b a Depth Lap 8 1/2" 81/2" 2 3 4 8 1/2" 3'-0" 8 1/2" 1'-0" IR283 1111282 1R21311 BLD 0 �NOTFORONSTRUCTIONb P (Typ•) P3( yp•) P2(Ty •) P (Typ•) P3( yp•) P2(Ty •) THE VP ENGINEER'S SEAL APPLIES THIS DRAWNG, INCLUDING THE WFORMATON HEREON, REMAINS THE PROPERTY OF, VP BUROOCS. VP Buildings 1R1B1 1R1B2 1R1B3 1 19'-6" 20'-0" —� 19'-6" 1 60'-0" ROOF SECONDARY PLAN BLD 0 �NOTFORONSTRUCTIONb . , snDPe Nome =Fast—Trott THE VP ENGINEER'S SEAL APPLIES THIS DRAWNG, INCLUDING THE WFORMATON HEREON, REMAINS THE PROPERTY OF, VP BUROOCS. VP Buildings ROOF SECONDARY PLAN ONLY TO THE WORK PRODUCT OF PERFORMANCE IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING PURCHASE AND 3200 Plo ers Club Circle Y Mem hiS TN 38125 P VP AND DESIGN AND REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES DESCRIBED IN THE APPLI Er ORDER SHALL TMNOR K EIE"PROOIICED OR UNED FOR ANY APPROVAL Di BUILDINGS.T PRgR N'RITTE REV DATE BY �R DESCRPTON Grant Steel Build and Concrete Systems, Inc JOB A NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT CLISIOMER City of Pod Townsend THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY DAT �2l OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP IN ERE"AG THIS BUILDING IN CONFORMANCE WITH THIS VP BUILDINGS VARcO PRUDEN LOCA m Pal TorrnsEnd, WDshington �'� MLG FORMANCE REQUIREMENTS DRAWING. DETAILS REFERENCED IN TMIS ORAINNG, ALL APPLIGBLE VP ERECTION GUIDES City 01 Part TOWtISefld GOB GOUTSe BUIId'Ing SPECIFIED BY VP. AN INDUSTRY STANpARDS PERTAININd TO PROPER E; INCLUDING THE CORRECT USE OF TEMPORARY A AIueS[ope Steel Compo TIC PAGE 9 BIALDCR'S PDA BRACING. NTS 20098-26 vPc VERSKW: »/R/,)Am A-10.96 nLENANE; Fntl-Trw.k.VPr. aart Mark Key Secondary Part Schedule THIS THEAHEREON. 1 G1(Typ.) Mark Part Thick. Depth 2 G2 G1 05GO703517 0.0590 81/2" 1 G2 05GO603217 0.0590 81/2" 4 GFA106 G3 05G2209417 0.0590 81/2" 5. GFA200 G4 05G1501417 0.0590 81/2" P1 JCP0521 H 0.0590 81/2" Lap 8'-6" 1 4'-0" Dimension Key S NOTED, USE 1/2 X 1 1/2 A-315 SNUG TIGHTENED BOLTS FOR GIRT LAP, TO FRAWE, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. 2. WIND AND FIANCE BRACING ARE AN INTEGRAL PART Of THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION Of WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 23'-0" 40'-0" SECONDARY ELEVATION AT 1 Shope Norse = Fost-Trak Woll = 1 THIS THEAHEREON. THE VP ENGINEER'S SEAL APPLIES REMAINS THE 'PROPEL OF BUILDINGS. ONLY TO THE WORK PRODUCT OF IT IS PROVIDED SOLELY FOR ERECT NG THE BULGING VP ANDDESIGN AND PERFORMANCE DESCRIBED BI THE APPLICABLE PURCHASE ORDER AND CISFI�EDDB�VP. RT SFULL 1gR%R WFIDt PTRODUCED OR�USED FOR PRIOR WRO HOE VREMENTS P ENGINEER'S NOT APPLY TO THE PERFORMANCE ES APPROVAL OF M BInLWNGS. THE GENERAL CONTRACTOR AND OR ERECTOR 5 SOLELY OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP RESPONSIBLE FOR ACCURATE, D OUALRY WORKMANSHIP EXCEPT TO ANY DESIGN OR PER- IN ERECTING THIS SURDWG IN CONFORMANCE WITH TNS FORMANCE REQUIREMENTS DRAWING, pETNLS REFERELACED IN 7HS DRAWING, SPECIFIED BY VP. ALL APPLIGBLE M ERECE IOM GUIDES AN INOISTRY STANOAROS PERTNNINd TO PROPER ERECTION, wICLUDINC THE CORRECT USE OF TEMPORARY EUtACINC. 8'-6" 101 NOT FOR CONSTRUCTION VP Buildings SECONDARY ELEVATION AT 1 3200 Ployers Club Circle Memphis TN 36725 IEV OATE BY DESORPTION BUILDER Grant Steel Buildings Ond Concrete OuST011""City of Port Townsend LOCATION Port Townsend, Washington PROJECT City of Port. Townsend Golf Course NTS BUILOER'S PO/ 2009R_26 t9/R/91YN R-19:27 "LENA"E: Fast-Trock.VPC BLD 0- -0 0 110 VBUILDINGS oaAWN/ � VARCO PRUDEI MILN A BlueScope SIee1 Compos PACE YPc vERSION: TIC 10 Bracing Member Schedule Id Part Description PPBX001 3P 6"x 3/16" fig -0.1345"x 8" web 65 01 KBD03071 2L 3.0 x 3.0 x 0.1875 - 0.375 x325 Bolt Schedule Id Qty Bolt Diam Bolt Length Washer 1 4 3/4" 1 1/2" 2 2 3/4" 2" Length Vert. Clear 20'-6" 3'-7 1/8" 8'-6 1/16" 1 1 W2B2 mart Mark Key Secondary Part Schedule Shape Nome = Fost-frock, Wall = 2 1 36(Typ.) Mark Part Thick. Depth Lap 2 GFA106 G5 05(31903417 0.0590 81/2" ODER Steel r B own and Concrete Systems, Inc a� �X City �Ta"ER City of Port Townsend G6 05G0407417 0.0590 81/2" H1 G7 05G1909417 0.0590 81/2" A BlueScope Sint Compo we VERsiow: 7.1c H1 D H 1000017 0.0590, 8 1/2" C' 11 001,11011217 0.0590 8 1/2" Bracing Member Schedule Id Part Description PPBX001 3P 6"x 3/16" fig -0.1345"x 8" web 65 01 KBD03071 2L 3.0 x 3.0 x 0.1875 - 0.375 x325 Bolt Schedule Id Qty Bolt Diam Bolt Length Washer 1 4 3/4" 1 1/2" 2 2 3/4" 2" Length Vert. Clear 20'-6" 3'-7 1/8" 8'-6 1/16" 1 19'-6" 6 9" 5 9 3/4" 4 3'-0" 3 3'-51/4" 2 4'-0" 1 6" F-himension Key 1_ i NOTED, USE 1/1 X 1 1/2 A-325 SNUG TIGHTENED BOLTS FOR GIRT TO FRAME, FIANCE BRACE TO FRAME, FIANCE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 5'-0" —� 10'-0" 20'-0" 60-0 SECONDARY ELEVATION AT A 5'-0" Ig' -6" 1 W2B2 Shape Nome = Fost-frock, Wall = 2 NOT FOR CONSTRUCTION 2 THE VP ENGINEER'S SEAL APPUES ONLY TO THE WORK PRODUCT OF VPANDOESIGNAND PERFORMANCE REQUIREMENTS VP ENGINEERS SFIED BY VP. EAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FO REQUIREMENTS SPECIFIED BY VP. G7 VP Buildings 3200 Players Club Circle - D2 ODER Steel r B own and Concrete Systems, Inc a� �X City �Ta"ER City of Port Townsend VVP BUILDINGS —RCO PRUDEN , THE GENERAL CONTRACTOR ANO/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD OUALITr WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORwACE WITH THIS GRAYING OE�AIIS RErERENCED IN ilAS DRAWING, ALL APPLIC'ABAI vP ERECTION GUIDES AND INDUSTRY STANMRDS PERTANINd TO PROPER IRE ON RICLU THE CORRECT USE OF TEMPORARY BRACING. H1 LOCATION Port Townsend, Washington AIAWN/�E� MLG PACE I1 �'kCT City of Port Townsend Goll Course Buildng A BlueScope Sint Compo we VERsiow: 7.1c NTS BUIaR'S Po/ 2OWK-26 2 C' R -10 -IR FILENAME: F,xl_TNr4 VPr. 2 T— 2 1 W2B1 G5(Typ.) �` � 1 W2B3 G5(TYp•) 2 19'-6" 6 9" 5 9 3/4" 4 3'-0" 3 3'-51/4" 2 4'-0" 1 6" F-himension Key 1_ i NOTED, USE 1/1 X 1 1/2 A-325 SNUG TIGHTENED BOLTS FOR GIRT TO FRAME, FIANCE BRACE TO FRAME, FIANCE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 5'-0" —� 10'-0" 20'-0" 60-0 SECONDARY ELEVATION AT A 5'-0" Ig' -6" Shape Nome = Fost-frock, Wall = 2 NOT FOR CONSTRUCTION THE VP ENGINEER'S SEAL APPUES ONLY TO THE WORK PRODUCT OF VPANDOESIGNAND PERFORMANCE REQUIREMENTS VP ENGINEERS SFIED BY VP. EAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FO REQUIREMENTS SPECIFIED BY VP. THIS DRAWING, INCLUDING THE INFORMATION HEREON. REMAINS THE PROPERrY OF VP BUILDINGS. IT 5 PROVIDED SOLELY FDR ERECTING THE BUILDING DESCLLRIBNNEppD77 IBNE THE APPLICABLE PURCHASE ORDER AND � OTNER PUR AHt LPRO T pRIpRED rt515ED FOR APPROVAL OF VP BUILDINGS. to VP Buildings 3200 Players Club Circle - Memphis TN 36125 SECONDARY ELEVATION AT A ODER Steel r B own and Concrete Systems, Inc a� �X City �Ta"ER City of Port Townsend VVP BUILDINGS —RCO PRUDEN , THE GENERAL CONTRACTOR ANO/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE, GOOD OUALITr WORKMANSHIP IN ERECTING THIS BUILDING IN CONFORwACE WITH THIS GRAYING OE�AIIS RErERENCED IN ilAS DRAWING, ALL APPLIC'ABAI vP ERECTION GUIDES AND INDUSTRY STANMRDS PERTANINd TO PROPER IRE ON RICLU THE CORRECT USE OF TEMPORARY BRACING. OAT r12/6/20C LOCATION Port Townsend, Washington AIAWN/�E� MLG PACE I1 �'kCT City of Port Townsend Goll Course Buildng A BlueScope Sint Compo we VERsiow: 7.1c NTS BUIaR'S Po/ 2OWK-26 t7/S /9fVN R -10 -IR FILENAME: F,xl_TNr4 VPr. aart Mark Key Secondary Part Schedule A 0 1 G1(Typ.) Mark Part Thick. Depth 2 G2 G1 05G0703517 0.0590 81/2" 1 G2 05GO603217 0.0590 81/2" 4 GFA106. G3 05G2209417 0.0590 81/2" 5 GFA200 G4 05G1501417 0.0590 81/2" P1 JCP0521 � 0.0590 81/2" Lap 8'-6- 1 4'-0" r"imension Key 13 NOTED, USE 1/2 X 1 1/2 A-315 SNUG TIGHTENED BOLTS FOR GIRT LAP, v.nl TO FRAME, FLANGE BRACE TO FRAME, FIANCE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. 2. WIND AND FLANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACK WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 23'-0" 40'-0" SECONDARY ELEVATION AT 4 8'-6" 12 A 0 LNOTFOR CONSTRUCTION Shope Norrie = Fost-Trock, Won = 3 THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF TNS DRAWING, INCLUDING THE INFORMATION HEREON, REIWNS THE PROPERTY OF VP BUILDINGS. VP Buildings SECONDARY ELEVATION AT 4 VP AND DESIGN AND PERFORMANCE IT IS PROVIDED SOLELY FOR ERECTING THE WRONG THEAPPLICABLEAPPLICABLE PURCHASEORDEROUR5DEER AND 3200 Ployers Club Circle Memphis TN 38125 REQUIREMENTSIED BY VP. THE VP ENGINEER'S SEAL DOES SOEESµC�RI13ED RWM IORDwRftiEN D F� ANY O7NER PURPOSEFM1�YIgUT PRO APPROVAL OF VP BUILDINGS. �y OTE By DESMvTKW BLXLOER Grant Sled Baldi s and Concrete S tems, Irk JOB NOT APPLY TO THE PERFORMANCE ERECT SOLE THE GENERAL CONTRACTOR ANO/at ERECTOR 5 SOLELY THE GENERAL UATI OR DESIGN OF ANY OTHER PRODUCT cus'01E1 Gly of Port Townsend OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- OLE FOR ACCURATE, 0000 Y WS SMP IN ERECnOG TH5 BU40oJG W CONFORMANCE wnH THIS VP BUILDINGS LOCAMw1 Port Townsend, Washington DRA MI FORMANCE REQUIREMENTS SPECIFIED BY VP. DRAWING, DETNL$ REFERENCED W THIS DRAWING, M.L APPLICABLE VP EREciION GUIOEs VARCO vRUDEH PROJE07 Gly of Pal Townsend Goff Course Building ANO INOVSTRY STANpARpS pERTAlNRId 70 R TEYPCI7MY A BluaScope 51wN Co..._ P� �S B ILDERS PO/ 20OW-26 ERECTION,'Z.NC THE CORRECT USE OF BRACING. WC VERsow: 7.1C »/c/1mR A•10d0 FRENAW: 17—f_LM6VPC 12 Bracing Member Schedule Id Part Description PPBX001 3P 6" x 3/16" flg - 0.1345" x 8" web 65 01 KBDO3071 2L 3.0 x 3.0 x 0.1875 - 0.375 a325 Bolt Schedule Id Qty Bolt Diam Bolt Length Washer 1 4 3/4" 1 1/2" 2 2 3/4" 2" Length Vert. Clear 20'-6" 3'-71/8" 8'-61/16" 4 1 W4B2 • Q'art Mark Key Secondary Part Schedule 2 1 G6(Typ.) Mark Part Thick. Depth Lap 2 GFA106 G5 05G1903417 0.0590 81/2" G6 05G0407417 0.0590 81/2" THIS DRAWING, INCLUDING THE INFORMATION HEREON.-- REMAINS THE PROPERTY OF VP BUILDINGS. G7 05G1909417 0.0590 81/2" r H1 DH1000017 0.0590 81/2" 3200 Players Club Circle J1 001J1011217 0.0590 81/2" Bracing Member Schedule Id Part Description PPBX001 3P 6" x 3/16" flg - 0.1345" x 8" web 65 01 KBDO3071 2L 3.0 x 3.0 x 0.1875 - 0.375 a325 Bolt Schedule Id Qty Bolt Diam Bolt Length Washer 1 4 3/4" 1 1/2" 2 2 3/4" 2" Length Vert. Clear 20'-6" 3'-71/8" 8'-61/16" 4 19'-6" 6 9" 5 9 3/4" 4 3'-0" 3 3'-5 1/4" 2 4'-0" 1 6" P— pension Key 1: NOTED, USE 1/2 X 1 1/2 A-325 SNUG TIGHTENED BOLTS FOR GIRT M,.I TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. 2. WIND AND RANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 5'-0" 10'-0" �--- 5'-0" GV —V 60'-0„ SECONDARY ELEVATION AT D 19'-6" 1 W4B2 �P 2 NOT FOR CONSTRUCTION G7 2 Shape Nome = Fost-Trock, Wall = 4 THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF THIS DRAWING, INCLUDING THE INFORMATION HEREON.-- REMAINS THE PROPERTY OF VP BUILDINGS. H1 2 r O —J I 2 3200 Players Club Circle '7 r 2 1W4131 G5(Typ.) 1 $iNL` NNppT MODInED REPRODUCED OR U$EO FOR ANY /STHER PURPOSE Y/I &P PRIOR WR&e. APPROVAL OF VP BURDINGS. pLV DATE BY DESCRIPTION BUEDR Grant Steel Buildings and Concrete S lams, InC 1W4B3 2 G5(Typ.) '� 19'-6" 6 9" 5 9 3/4" 4 3'-0" 3 3'-5 1/4" 2 4'-0" 1 6" P— pension Key 1: NOTED, USE 1/2 X 1 1/2 A-325 SNUG TIGHTENED BOLTS FOR GIRT M,.I TO FRAME, FLANGE BRACE TO FRAME, FLANGE BRACE TO GIRT, JAMB AND HEADER CONNECTIONS. 2. WIND AND RANGE BRACING ARE AN INTEGRAL PART OF THE WALL STRUCTURAL SYSTEM AND SHOULD BE PROPERLY INSTALLED PRIOR TO ERECTION OF WALL AND ROOF SHEETS. REMOVAL OR ALTERATION OF WALL BRACING WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 5'-0" 10'-0" �--- 5'-0" GV —V 60'-0„ SECONDARY ELEVATION AT D 19'-6" �P NOT FOR CONSTRUCTION Shape Nome = Fost-Trock, Wall = 4 THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF THIS DRAWING, INCLUDING THE INFORMATION HEREON.-- REMAINS THE PROPERTY OF VP BUILDINGS. VP Buildings SECONDARY ELEVATION AT D VP AND DESIGN AND PERFORMANCE IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND 3200 Players Club Circle Memphis TN 38125 REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES $iNL` NNppT MODInED REPRODUCED OR U$EO FOR ANY /STHER PURPOSE Y/I &P PRIOR WR&e. APPROVAL OF VP BURDINGS. pLV DATE BY DESCRIPTION BUEDR Grant Steel Buildings and Concrete S lams, InC '� NOT APPLY To THE PERFORMANCE THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RITE 2 N 1 / OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP OUSIO l" City of Pat Townsend - EXCEPT TO ANY DESIGN OR PER- RESPONSIBLE FOR ACCURATE. GODO ODALITY WORKMANSHIP IN ERECTING THIS BUILDING p CONFORMANCE WITH THIS VP BUILDINGS VARGO PRUDfH LOCATION Port Townsend, Washington ` FORMANCEREOUIREMENTS SPECIFIED BY VP. DRAWING DETAILS IWF[FENCED IN THIS DRAWING, ALL APPLICABLE W ERECTION CURIES MLORAG PROJECT City of Port Townsend Goll Course Bui�rg µp Wp I151RY STAN PERTNNINd TO PROPER 7HE CORRECT TEMPORARY A BIueSCope SINN Compo P AGE NTS eufDERs Po/ 2008yf'C-26 ERECDON, INauDI USE OF BRACING. veC vERSIOHN: 7.1c 13 II/CIM" R•ia•V) FILENAW: Fncl–Tmrk VPf. Covering Schedule Id Qty Length #9 20 20'-10 1/2" 20 20'-101/2" Oper. Code:1=SQ,SQ Finish:K=KXL Color:LG=Leaf Green Type Gage OP Fin. Color Direction PR 26 1 K LG Left to Right PR 26 1 K LG Right to Left (H 0 I 0 a Accessory Schedule Qty Part U 1 3-0 x 7-0 Door - Advantage 1 3070 Pre -Assembled Door Trim Kit 36 Wallite Kit 5'-3" Panel Rib NR White OM Ice Damming Conditions Exist - (Field Repair Fastener) (1 bags) #55308 #17-14x1" S.S. Roof Fastener F'"mension Key RIWNG 1/8 DIAMETER HOLES FOR ROOF STRUCTURAL FASTENERS —I BE REQUIRED AT 11 GAGE PURLINS, NESTED PURUNS, PURUN LAP LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS 2. ROOF SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 3. PANELS SHOWN WITH A LENGTH LESS THAN 1-0, 5-0 FOR SSR, MAY HAVE TO BE FIELD CUT. /. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFDTION. B1 A 1, WA04A2 THE VP ENGINEER'S SEAL APPUES ONLY TO THE WORK PRODUCT OF VPAND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. Trim Schedule Id Parts T1 (8)HT14,(2)HT05,(6)RGC143 2 T2 RRC40,SPC40 3 (20)#10 T1 (20)#3 ROOF COVERING PLAN Shape Nome = Fost-Trak Color Match Roof Color T Green Details EN52A1,RCOOAI,RC03B 1,RC04B1,RC34D1 RC38C4 C�BLDAV NOT FOR CONSTRUCTION VP Buildings ^� 3200 Ployers Club Circle Memphis TN 38125 ROOF COVERING PLAN In arc By DESCRIPTION "u"O" Grant Steel Buiklings and Concrete Systems, Inc 10B A 04TO"'ER Cly of Port Townsend V2 oATr12/6/20( LOCATIM Pat Townsend, Washington VP BUILDINGS ORA+vwyo+Ecx VARCO PRUDEN °1iC' Gly of Port Townsend Coll Course BOding A Blue rope steel Compa MLG NTS BULaER's Pot 2008VPC-26 VPc VERS": Tic °� 14 ra re lima 0.10-11 FILENAME: rn I_Tr-6XW Covering Schedule Id Qty Type Start Length #2 7 PR 18'-51/4" 7 PR 18'-51/4" Oper. Code:K=CR,RT Oper. Code:J=CR,LF Finish:K=KXL Color:ST=Cool Sierra Tan 0 Trim Schedule Gage OF Fin. Color Increment Direction Id Parts Color 26 K K ST 1'-0" Left to Right From Peak T1 (2)BG2 Cool Sierra Tan 26 J K ST 1'-0" Right to Left From Peak T2 CT12 Match Wall Color T3 (3)RCHB15,(5)RCL10,(3)RKF16 Leaf Green A � Details EN52A1,RCOOAI,WCOIDI,WC04A1,WS27A2,WS27C2 WC20A1 RC30E1 I MILLING 1/8 DUETER HOLES FOR WALL STRUCTURAL FASTENERS —I BE REWIRED AT 11 CAGE GIRTS, NESTED GIRTS, GIRT LAP LOCATIONS, AND/OR SECONDARY STRXFLIRAL BMS 2. WALL SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, REMOVN. OR ALTERATION WITHOUT PRIOR AUTHORIZATION S PROHIBITED. 3, PANELS SHOWN WITH A LENGTH LESS THAN 1-0, 5-0 FOR SSR, MAY HAVE TO BE FIELD CUT, 4. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. 40'-0" COVERING ELEVATION AT 1 Shape Name = Fast–Trock, Wall = 1 THIS DRAWING. 'INCLUDING THE INFORMATION HEREON, REMNNS THE PROPERTY OF VP BUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING SD�ENSSCC�RIBED TBNE Ty14EE APPLICABLE PURCHASE R ORDER AND ANY OTHER PURPOSE EMDItIq rf PRIOR WRITTEN FOR APPROVAL OF VP BURDINGS NOT FOR CONSTRUCTION VP Buildings COVERING ELEVATION AT. 1/ 3200 Ployers Club Circle Memphis TN 38125 —__. . EV DATE BY DESCRIPTION BUILDER Grant Sleet Builrfings and Concrete cus'OMER City of Part Townsend LOGTIpN Pori Townsend, Washington PRQJEc' City of Pat Townsend Golf Course NTS BUAocR'S PoA 2008VPC-26 17 /c /'Imo 9.10.11 FILENAME: ;' of _Tnr Wr' 00-J0 Inc A VP BUILDINGS DAT�2/6/20( VANKO PRUDEH MLG 701fDK A BlueScope Steel Compa PAGf VPc vmsiow TIC 15 1 4 TC T7 l �# 0 10 Covering Schedule Trim Schedule :REON, IKR VP Buildings Id Qty Type Start Length Gage OP Fin. Color Direction Id Parts Color Details Memphis 38125 #3 18 PR 12'-1 5/8" 26 F K ST Left to Right T1 DF10,JT10 Cool Sierra Tan WC24A1 2 PR 1'-11 1/8" 26 1 K ST Left to Right T2 DF10,HTS10 Cool Sierra Tan WC24A2 LOCATq" Port Townsend, Washington VOTH T�HIISNIP T3 (2.5)BG2 Cool Sierra Tan EN52A1,RCOOAI,WC01D1,WC04A1,WS27A2,WS27C2 Oper. Code:F=CR,SQ iPER EYPORARY A BlueSCOpe SIeN Compo WC YERsw: 7.1E PAGEwGr PA« 16 T4 DE1,DN1,(2)DS10,(3)DST1 Match Wall Color RC38F1 R 1935 FILENAME: Fast-Track.VPC Oper. Code:1=SQ,SQ T5 CT12 Match Wall Color WC20A1 Finish:K=KXL T6(3)EG204,(6)GRA10,(6)PCA10B,(21)STR2 Leaf Green RC0381,RC04B2,RC32B1,RC39A3,RC6186,WC04A1,W 11A1 Color:ST=Cool Sierra Tan I T7 BS1,GGC4,MCCl.PRF1 Leaf Green RC38A1 (9)#3 1 4 TC T7 25' -0" 1. ALLING 1/8 DIAMETER HOLES FOR WAIL STRUCTURAL FASTENERS — BE REQUIRED AT 11 CAGE GIRT5, NESTED GIRTS, GIRT LAP LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS 2. WALL SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 3. PANELS SHOWN WITH A LENGTH LESS THAN 1-0, 5-0 FOR SSR, MAY CLAVE TO BE FIELD CUT. 4. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. 10'-0" 60'-0" COVERING ELEVATION AT A Shape Nome = Fast -Track, Wal = 2 25'-0" l �# 0 10 ,t. NOT FOR CONSTRUCTION-� " :REON, IKR VP Buildings (2 12 4 µO 3200 Players Club Circle Memphis 38125 ED FOR REV GATE B+' DES[RIPI%IN BUIL�R Grant Steel Buildingsand Concrete Systems, Inc JOB / DATFl2 1 / IS SOLELYau UE sTOR Gly of Port Townsend LOCATq" Port Townsend, Washington VOTH T�HIISNIP VP BUILDINGS PRUDEN l 'K• PROJECTV/UtCO Cily of Port Townsend Golf Course Budding iPER EYPORARY A BlueSCOpe SIeN Compo WC YERsw: 7.1E PAGEwGr PA« 16 NTS BUILDERS POI 2DOWC-26 »/BhmR R 1935 FILENAME: Fast-Track.VPC I (9)#3 I (g)#3 F- H F +25'-0" T3-25'- " 25' -0" 1. ALLING 1/8 DIAMETER HOLES FOR WAIL STRUCTURAL FASTENERS — BE REQUIRED AT 11 CAGE GIRT5, NESTED GIRTS, GIRT LAP LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS 2. WALL SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 3. PANELS SHOWN WITH A LENGTH LESS THAN 1-0, 5-0 FOR SSR, MAY CLAVE TO BE FIELD CUT. 4. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. 10'-0" 60'-0" COVERING ELEVATION AT A Shape Nome = Fast -Track, Wal = 2 25'-0" l �# 0 10 ,t. NOT FOR CONSTRUCTION-� " :REON, IKR VP Buildings \ TA ON AT A EVL I TN `COVERING ELEVATION µO 3200 Players Club Circle Memphis 38125 ED FOR REV GATE B+' DES[RIPI%IN BUIL�R Grant Steel Buildingsand Concrete Systems, Inc JOB / DATFl2 1 / IS SOLELYau UE sTOR Gly of Port Townsend LOCATq" Port Townsend, Washington VOTH T�HIISNIP VP BUILDINGS PRUDEN l 'K• PROJECTV/UtCO Cily of Port Townsend Golf Course Budding iPER EYPORARY A BlueSCOpe SIeN Compo WC YERsw: 7.1E PAGEwGr PA« 16 NTS BUILDERS POI 2DOWC-26 »/BhmR R 1935 FILENAME: Fast-Track.VPC Covering Schedule Id Qty Type Start Length #5 7 PR 18'-5114" 7 PR 18'-5114" Oper. Code:K=CR,RT Oper. Code:J=CR,LF Finish:K=KXL Color:ST=Cool Sierra Tan 0 Gage OF Fin. Color Increment Direction 26 K K ST 1'-0" Left to Right From Peak 26 J K ST 1'-0" Right to Left From Peak T5 Trim Schedule Id Parts T1 (2)BG2 T2 CT12 T3 (3)RCHB15,(5)RCL10,(3)RKF16 T4 BSI,GGC4,MCCI,PRF1 T5 RRC40,SPC40 Color Details Cool Sierra Tan EN52A1,RCOOA1.WC01D1,WC04A1,WS27A2,WS27C2 Match Wall Color WC20A1 Leaf Green RC30E1 Leaf Green RC38A1 Leaf GreenA RC38C4 1 RILLING 1/8 Dt414DER HOLES FOR WALL STRUCTURAL FASTENERS BE REQUIRED AT 11 CAGE GIRTS, NESTED GIRTS, GIRT LAP LOCATIONS, AND/OR SECONDARY STRt1CTURAL BENTS 2. WALL SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, REMOVAL -OR ALTERATION WITHOUT PRIOR AUTWOIRZATION IS PROHIBITED. 3. PANELS SHOWN WITH A LENGTH LESS 1tWI 1-0, 5-0 FOR SSR, MAY PAVE TO BE FIELD CUT, 4. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. 40'-0" COVERING ELEVATION AT 4 Shope Name = Fast -Track, Wall = 3 REYNNf TRIS IT 5P ( NOT FOR CONSTRUCTION VP Buildings COVERING ELEVATION AT 4 3200 Players Club Circle Memphis TN 38125 TEV DATE BY DESCRonioN BuaDER Grant Steel Buildogs and Concrel WS'DNE" City of Pat Townsend LOWm Pod Townsend, Washington IPR"aT City of Pad Townsend Golf Cours NTS 1BUILDEWS POI 20OW-26 17/AMnrR rILENAYE: Fnsl-Trnek.VPC AU".-'qm) �I v VVP BUILDINGS t7' VARCO PRUDEN A BlueStWe Sleel Can+Da4t" VPC VERSION: 7.1C H THE VP ENGINEER'S SEAL APPLIES THIS ORAwM' INCLUDING THE INFORMATION HEREON. REMAINS THE PROPERTY OF VP SUILDe1GS. Covering Schedule Trim Schedule IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING VP AND DESIGN AND PERFORMANCE Id Qty Type Start Length Gage OF Fin. Color Direction Id Parts Color Details #7 18 PR 12'-1 5/6" 26 F K ST Left to Right T1 DF10,JT10 Cool Sierra Tan WC24A1 2 PR 1'-11 1/8" 26 1 K ST Left to Right T2 DF10,HTS10 Cool Sierra Tan WC24A2 T3 (2.5)BG2 Cool Sierra Tan EN52A1,RCOOAI,WC01D1,WC04A1,WS27A2,WS27C2 Oper. Code:F=CR,SQ IN ERECTYiG TMS BUILDING M CONFORMANCE WITM TH5 DRAwWG, DETAILS RETERENCED M THIS ORAwWG, ALLAPPL IGIBLE VP ERECTION GUR1F5 SPECIFIED BY VP. T4 DE1,DN1,(2)DS10,(3)DST1 Match Wall Color RC38F1 Oper. Code:t=SQ,SQ T5(3)EG204,(6)GRA10,(6)PCA10B,(21)STR2 Leaf Green RC03B1,RC04B2,RC32B1,RC39A3,RC61136,WC04A1,W 11A1 Finish:K=KXL T6 BSI,GGC4,MCCI,PRF1 Leaf Green RC38A1 Color:ST=Cool Sierra Tan 4 1 TF T6 0 THE VP ENGINEER'S SEAL APPLIES THIS ORAwM' INCLUDING THE INFORMATION HEREON. REMAINS THE PROPERTY OF VP SUILDe1GS. ONLY TO THE WORK PRODUCT OF IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING VP AND DESIGN AND PERFORMANCE DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND REQUIREMENTS SPECIFIED BY VP. SHALL 1qT BEEIEPTROOI EDUSEO FOR THE VP ENGINEER'S SEAL DOES THE PU PRKKt EN APPROVALOFVP BUILDINGS. NOT APPLY TO THE PERFORMANCE THE GENERAL CONTRACTOR AND/OR ERECTOR K SOLELY ERECT OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP RESPGH9&E FOR ACCURATE, GOOD Y WORKMANSHIP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS IN ERECTYiG TMS BUILDING M CONFORMANCE WITM TH5 DRAwWG, DETAILS RETERENCED M THIS ORAwWG, ALLAPPL IGIBLE VP ERECTION GUR1F5 SPECIFIED BY VP. AHD INDUSTRY STANDARDS PERTAIMNd 70 R WIN N, IAICWpNG THE CORRECT USE OF 7EMPORA/fP aACINc. & (2 12 (9)#7 (9)#7 7 r I— 1= � T -25'-0" T3-25'- " 25'-0" 1': RILUNG 1/8 DIAMETER HOLES FOR WALL STRUCTURAL FASTENERS ,MI BE REQUIRED AT 11 GAGE GIRTS, NESTED GIM, GIRT LAP LOCATIONS, AND/OR SECONDARY STRUCTURAL BEMIS 2. WALL SHEETS ARE AN INTEGRAL. PART OF THE STRUCTURAL SYSTEM, REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. 3. PANELS SHOWN WITH A LENGTH LESS THAN 1-0, 5-0 FOR SSR, MAY HAVE TO BE FIELD CUT. 4. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPEOFICATON. 10'-0" 60'-0" COVERING ELEVATION AT D Shape Now = Fast -Track, wall = 4 THE VP ENGINEER'S SEAL APPLIES THIS ORAwM' INCLUDING THE INFORMATION HEREON. REMAINS THE PROPERTY OF VP SUILDe1GS. ONLY TO THE WORK PRODUCT OF IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING VP AND DESIGN AND PERFORMANCE DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND REQUIREMENTS SPECIFIED BY VP. SHALL 1qT BEEIEPTROOI EDUSEO FOR THE VP ENGINEER'S SEAL DOES THE PU PRKKt EN APPROVALOFVP BUILDINGS. NOT APPLY TO THE PERFORMANCE THE GENERAL CONTRACTOR AND/OR ERECTOR K SOLELY ERECT OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP RESPGH9&E FOR ACCURATE, GOOD Y WORKMANSHIP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS IN ERECTYiG TMS BUILDING M CONFORMANCE WITM TH5 DRAwWG, DETAILS RETERENCED M THIS ORAwWG, ALLAPPL IGIBLE VP ERECTION GUR1F5 SPECIFIED BY VP. AHD INDUSTRY STANDARDS PERTAIMNd 70 R WIN N, IAICWpNG THE CORRECT USE OF 7EMPORA/fP aACINc. & 25'-0" NOT FOR CONSTRUCTION i VP Buildings COVERING ELEVATION AT D 3200 Players Club Circle Memphis TN 38125 m DATE Br DEscRwaDN BUA�ER Grant Steel Buildings and Concret uSTaNER Cily of Port Townsend LOFAIO" Port Townsend, Washington PROTECT City of Port Townsend Golf Cours NTS & °ERS Poe 10WK-26 I1/c f91NR A.10•T7 - rILENAWE: Fnel-Trask VP(: r n � 1) Incuoa VP BUILDINGS DAT�2/I VARCO PRUDEN DI7NALNGT/I A BlueScope Steel Compa YPc vERS10N: 7.1c PAGE 18 f Rr wg R09A4.dwg R25C7.dwg R25C9.dwg N10A1.dwg 7N10A2.dwg N20Al.dwg N30Al.dwg N50A1.dwq N51A1.dwg N52A 1.dwg N53A 1. dwg RC00Al.dwg C0381.dwg C0481. dwg C04B2.dwg C30E 1.dwg RC32Bl.dwg RC34DlAwg RC38Al.dwg C38C4.dwg C38F1.dwg RC39A3.dwg C61 B6.dwg SOI A1.dwg RS02Al.dwg RS11 A1.dwg RS11 A2.dwg NAOlBl.dwg NA04Al.dwg WA04A2.dwg - C01D1.dwg NC04Al.dwg C11At.dwg C20Al.dwg VC24Al.dwg C24A2.dwg tVSOlB2.dwg NS0402.dwq NSlOE2.dwg NS20A2.dwg NS20A8.dwg NS20D2,dwg NS2009.dwg S27A2.dwg NS27C2.dwg A BIMSCope Steel Compo THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP AND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THE VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO ANY DESIGN OR PER- FORMANCE REQUIREMENTS SPECIFIED BY VP. NOT FOR CONSTRUCTION)' THIS ORAVANG, INCLUDING THE INFORMATION HEREON. REMAINS THE PROPERTY OF VP BUILDINGS. VP Buildings SED'S ITIS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDEROURSDEEpR AND 3200 Players Club Circle y Memphis TN 38125 BUILDING OTM[R PURPOSE EYI &P DNiITTEN FORBUIaER APPROVAL OF VP BUILDINGS REV D.TE BY DESCRVTON Gront Steel BuNiolls and Concrete Systems, Inc JOB T THE GENERAL CONTRACTOR AND/DR ERECTOR IS SOLELY CUSTOWR City of Port Townsend MTEZ 1 1 / RESPONSIBLE FOR ACCURATE. 6000 01yILOY wORNMMISMP w ERECTING TMS Bunovec IN CONFORMANCE wTTH THIS CC LOCATCN Ig Port Townsend, Wosh' lOn VP BUILDINGS/t -MCO PRUOEN DNUA' OETARS REFERENCED IN TMS ORAwiNG, ALL APP(IG18LE W ERECTp)N GUIDES 11LG PRO.lECT Gly of Pat Townsend Goll Course Building AND INOUS�RY STANDARDS PERWNINd TO PROPER A BIMSCope Steel Compo PACE NTS BUA.DER'S PO/ 20t18VP(.-26 ERECDON, INCLUDDNG THE CORRECT USE OF TEMPORARY vPc VERSION: TIC 19 BRACING. t1/R/oma R•1Dd9 FILENNrt Fast-Trock.VPC Development Services PORT TOS 250 Madison Street, Suite 3 �mz Port Townsend WA 98368 Phone: 360-379-5095 Fax: 360-344-4619 oFw www.cityofpt.us Commercial Building Permit Application Project Address & Zoning District: y' 13 Legal Description (or Tax #): `Office Use Only 1 s` floor 2 400 4_-hW.,yC 2"d floor Addition: 3`d floor Storage: Basement: Is it finished? Yes No Other: i1nJ%��7a% ;SP.4Gb� Block: /V14 ❑ Remodel/Repair ❑ 'Per i # <� Parcel # 92 Pot, Lot(s): ,UA bdate(i Permits W G s Project Description: G`crrzS'rU�:/O�� t�' �✓� �� ��s'9`� S ! dri7 tt1L41 60�•r iLt.S� S f6'hACiL Applications accepted by mail must include a check for initial plan review fee of $150 See the "Commercial Building Permit Application Checklist" for details on plan submittal requirements. Property Owner: Name: Address: 2''0 ",013Pe �57 ,5 y.° ?-� ! r� City/St/Zip: )r—L4 a l,4 Phone: �lv�y .�7C7 -- ✓�r?8�1 Email: c 17fe?7cd h� & e:/ US Contact/Representative: Name: McirL- & &- Address: 7r 14,"ll.Y"i City/St/Zip: Pert �Dic>r%1.QJCI� lLli�Nw Phone: Email: Contractor - Name: 6 t cz 0Z Address:�J h%iicrz City/SUZip: Phone:%/ Email:y^�>fJ^a.�. �t /v%fi.r1 flr/S : r1lL� State License #: Exp City Business License Lender Information: Lender information must be provided for projects over $5,000 in valuation per RCW 19.27.095. Name: /UA Project Valuation: $ ! 3�i U0,22 Construction Type: y' 13 Occupancy Rating: Building Information (square feet): 1 s` floor 2 400 Restrooms:_ 2"d floor Deck(s):__ 3`d floor Storage: Basement: Is it finished? Yes No Other: i1nJ%��7a% ;SP.4Gb� NewX Addition ❑ Remodel/Repair ❑ Change of Use ❑ Total Lot Coverage (Building Footprint): Square feet: 2400 %�_V1 rl fl— �I/�— � v � U U Impervious Surface: Square feet: �400 o non F0 I hereby certify that the information provided is correct, that I am either the owner or authorized to act Pn behalf of the•owner and that all activities associated with this permit will be in accordance with State Laws and the Port T(fwnserld Municipal Code. Print Name: /4d�^is /4 CITY Of PORT TOWNSEND DSD Signature: Date: ! 7� ULD 0 ILD 0 (c) Parcel Details Home CountyIl;fa Deportments Seordh Parcel Number: ' 001023005I`SEARCH Parcel Number: 001023005 PrinterFriendly Owner Mailing Address: CITY OF PORT TOWNSEND 250 MADISON ST, STE 1 PORT TOWNSEND WA98368 Site Address: Section: 2 School District: Port Townsend (50) Qtr Section: SW 1/4 Fire Dist: Port Townsend (8) Township: 30N Tax Status: City Range: 1W Tax Code: 100 Planning area: Port Townsend (1) Sub Division: lessor's Land_Use CQcie: 9700 - EXEMPT Property Description: S2 T30 R1W I TX 63 1 Click on photo for larger image. Q r:. _,--, No Permit No Assessor Data Tax A/V, Sales Into Map Parcel Plats & Surveys Available Data Available •1 ;JFK -;ti, HOME I COUNTY INFO I DEPARTMENTS I SEARCH _ Best viewed with Microsoft Internet Explorer 6.0 or later Windows - t, 12/12/08 3:16 PM http://www.co.jefferson.wa.uslassessors/parcel/parceldetal1.asp Page 1 of 2 Project: City of Port Townsend Golf Course Storage Building Permit No: Tax Parcel No: 001 023 005 STRUCTURAL CALCULATIONS Date: December 12, 2008 W v 157! 9 �CU4 �ECISTER�� 1� �SSIONAL structural calculations conform to the 2006 Interr and associated manufacturer's design standards. For comments and/or requests for additional information concerning these calculations, please contact: Name: IMichael Biggs, PE � Tel: 360-405-1420`�`_� Fax: 360-377-4153 WASHINGTON ENGINEERING 4040 Wheaton Way, Suite 202 Bremerton, WA 98310 Tel: 360-405-1420 Fax: 360-377-4153 E-mail: admin@wa-eng.net DESCRIPTION OF VARIABLES AS Cross-sectional area in square inches of steel per lineal foot of slab width fy Yield stress of the reinforcement in psi fs Allowable stress in reinforcement, Use 0.75 fy f, compressive strength of concrete (psi) Mr Modulus of rupture for concrete, (psi) fr tensile strength of concrete (psi), calculated as 40% of the Modulus of Rupture Mr F Friction Factor, usually in the range of 1.5 to 2.0 L Distance between joints (the distance between the free ends of the slab that can move d W Dead weight of the slab, psf, usually assumed to ber 12.5 psf per inch of thickness t Thickness of the slab in inches T range of temperature the slab is expected to be subjected to, (°F) thermal coefficient of concrete (in/in°F) ES modulus of elasticity for steel, (psi) SET SLAB PARAMETERS f c = 2500 psi fy = 60000 psi F= 2 L = 15 feet t = 4 inches W = 12.5 psf/in CALCULATE STEEL REINFORCEMENT USING SUBGRADE DRAG PROCEDURE AS = FLW/2fs AS = 0.017 in CALCULATE STEEL REINFORCEMENT USING CONFIRMED CAPACITY PROCEDURE AS = (14.5*(SQRT(fc) * t))/fy As = 0.048 in CALCULATE STEEL REINFORCEMENT USING EQUIVALENT STRENGTH PROCEDURE As = 36*(SQRT(fc))*t/fs As = 0.160 in USE AS = 0.16 in' Select WWR = 6 x 6-W8 x W8 FOOTING CALCULATOR Copyright 2008 12/12/2008 Conc Ftg-Slab v20081211 PROJECT: CITY OF PORT TO. WNSEND = GOLF;( COLUMN LOCATIONS: END WALL COLUMNS LINES 1'AND DETERMINE FOOTING DIMENSIONS (UNREINFORCED) Column/Base Plate Dimensions 8: x 10 Depth to bottom of footing D=24: inches Concrete fo Live Load 3200; lbs Concrete Unit Wt Structure Dead Load 800 lbs Steel Rebar Gr Soil Above Footing 0 lbs Allowable Soil Pressure Ftg/Column Dead Load 500 lbs Soil Unit Wt Ultimate Load Pu=1.2DL+1.6LL 6680 lbs Soil Active Pressure Maximum Uplift Load 2b00f lbs Soil Passive Pressure Maximum Lateral Load 1300. lbs Sliding Friction Coeff Rough Foundation Size = Service Load/Soil Bearing Capacity Minimum Footing Area = 3.00 ft2 Assume a square footing b= 1.73 ft Minimum b = 22 in Use b= 22 in Unreinforced Ftg Thickness t= 8.2 in Footing Weight = 345 lbs FIND FOOTING THICKNESS AND REINFORCEMENT Select trial footing thickness, rebar size and placement t= 8' in C=' ......3 in db= ' 1 in Calculate distance from extreme compression fiber to centroid of reinforcement d d=t-c-(.5'db ) d= 4.5 in Determine Soil Pressure based on factored loads qs=Pu/Atooting 2227 psf Check one-way (beam) shear in footing for trial thickness cpVo=(p2(SQRT(f'o))bd cpVo= 10644 lbs Vu=(Pu/b)(0.5(b-t)-d ) Vu= 759 lbs rpVc»Vu SATISFACTORY WASHINGTON ENGINEERING 4040 Wheaton Way, Suite 202 Bremerton, WA 98310 Tel: 360-405-1420 Fax: 360-377-4185 psi pcf psi psf pcf 933 West Third Ave, Suite 214 Spokane, WA 99201 Tel: 509-535-7292 Fax: 509-242-0840 2/r FOOTING CALCULATOR Copyright 2008 Conc Ftg-Slab v20081211 Check two-way (punching) shear in trial footing cpV,=cp4(SQRT(f`j)bod cpVr= 48383lbs V°=(Pu/b2)(b2-(t+d )2) Vu= 4523 lbs cpVc»Vu SATISFACTORY Determine reinforcement required for footing based on critical moment at edge of column Mu=gsb(0.5)'(0.5(b-t))2 Mu= 695 ft -lbs kbar= Mu/cpbd2 kbar= 0.0208 ksl From Table A8, p= 0.0010 From Table A5, pm,, 0 0033 Use p= 0.0033 Required AS=pbd= 0.33 int Trial Bar Size 4: Trial Number of Bars 3 Provided A5= 0.59 int SATISFACTORY CALCULATE UPLIFT RESISTANCE, Ur Ur = Weight of Footing + Weight of Soil Volume Above Footing + Structure Dead Load Ur = 1489 lbs SATISFACTORY WITH USE OF HAIRPINS 12/12/2008 CALCULATE LATERAL RESISTANCE Lr = ((Weight of Footing and Soil + Structure Dead Load)x( Friction Factor)+ Net Passive Pressure .................... Lr = 1608 lbs LATERAL RESISTANCE IS SATISFACTORTry b- 22 in ,t\ ,fl, i t= d= 8 4.5 FINAL FOOTING CONFIGURATION r ....._..,.... __. ...... b = 22 Inches ........._......._...._.: 4040 Wheaton Way, Suite 202 933 West Third Ave, Suite 214 WASHINGTON ENGINEERING Bremerton, WA 98310 Spokane, WA 99201 Tel: 360-405-1420 Tel: 509-535-7292 Fax: 360-377-4185 Fax: 509-242-0840 317 FOOTING CALCULATOR Copyright 2008 12/12/2008 Conc Ftg-Slab v20081211 TABLE A-5 Design Constants TABLE A-8 Coefficient of Resistance (k) Versus Reinforcement Ratio (p) (f; - 3000 ps'; f'. -= 60,000 psi; t1;u'.s of k Are ksi) 0.0010 3V'f' 200 T- Recommended des' n values k 1-n s (Psi) 0.0086 0.4638 Pb---- n -- (ksi) - --- -- -0.75 f,= 40,000 psi - ---- ---- 3000 4000 5000 6000 --- ----- 0.0050 0.0278 0.0135 0.4828 0.0050 0.0372 0.0180 0.6438 0.0053 0.0436 0.0225 0.8047 0.0058 0.0490 0.0270 _L- 0.9657 f, = 50,000 psi _ _ 3000 4000 0.0040 0.0040 0.0206 0.0275 0.0106 0.0144 0.4828 0.6438 5000 0.0042 0.0324 0.0180 1 0.8047 6000 0.0046 0.0364 0.0216 0.9657 f, = 60,000 psi 3000 0.0033 0.0090 _ 0.4828 4000 0.0214 I 0.0120 0.6438 5000 0.0035 0.0252 0.0150 0.8047 6000 0.0039 0.0283 _0.0180 0.9657 - fy = 75,000 psi 3000 4000 0.0027 0.0027 0.0116 0.0155 0.0072_ 0.4828 0.0096 0.6438 0.8047 5000 0.0028 0.0182 0.0120 6000 0.0031 0.0206 0.0144 0.9657 TABLE A-8 Coefficient of Resistance (k) Versus Reinforcement Ratio (p) (f; - 3000 ps'; f'. -= 60,000 psi; t1;u'.s of k Are ksi) 0.0010 k 0.0593 ...--- k 0.2717 n k 1-n k-- 0.0086 0.4638 0.0124 - 0.6355 .0049 0.2771 0.0087 0.4686 0.0125 0.6397 0.0012 0.0710 0.0050 0.2824 0.0088 0.4733 0.0126 0.6439 0.0013 0.0768 0.0051 0.2876 0.0089 0.4781 0.0127 0.6482 0.0014 0.0826 0.0052 0.2929 0.0090 0.4828 0.0128 0.6524 0.0015 0.0884 0.0053 0.2982 0.0091 0.4875 I 0.0129 0.6565 0.0016 0.0942 0.0054 0.3034 0.0092 0.4923 0.0130 0.6607 0.0017 0.1000 0.0055 0.3086 0.0093 0.4970 0.0131 0.6649 0.0018 0.1057 0.0056 0.3139 0.0094 0.5016 0.0132 0.6690 0.0019 0.1115 0.0057 0.3191 0.0095 0.5063 0.0133 0.6731 0.0020 0.1172 0.0058 0.3243 0.0096 0.5109 0.0134 0.6773 0.0021 0.1229 0.0059 0.3294 0.0097 0.5156 0.0135 0.6814 0.0022 0.1286 0.0060 0.3346 0.0098 0.5202 0.0136 0.6854 0.0023 0.1343 0.0061 0.3397 0.0099 0.5248 0.0137 0.6895 0.0024 0.1399 0.0062 0.3449 0.0100 0.5294 0.0138 0.6936 0.0025 0.1456 0.0063 0.3500 0.0101 0.5340 0.0139 0.6976 0.0026 0.1512 0.0064 0.3551 0.0102. 0.5386 0.0140 0.7017 0.0027 0.1569 0.0065 0.3602 0.0103 0.5431 0.0141 0.7057 0.0028 0.1625 0.0066 0.3653 0.0104 0.5477 0.0142 0.7097 0.0029 0.1681 0.0067 0.3703 0.0105 0.5522 0.0143 0.7137 0.0030 0.1736 0.0068 0.3754 0.0106 0.5567 0.0144 0.7176 0.0031 0.1792 0.0069 0.3804 0.0107 0.5612 0.0145 0.7216 0.0032 0.1848 0.0070 0.3854 0.0108 0.5657 0.0146 0.7255 0.0033 0.1903 0.0071 0.3904 0.0109 0.5701 0.0147 0.7295 0.0034 0.1958 0.0072 0.3954 0.0110 0.5746 0.0148 0.7334 0.0035 0.2014 0.0073 0.4004 I 0.0111 0.5790 0.0149 0.7373 0.0036 0.2069 0.0074 0.4053 0.0112 0.5835 0.0150 0.7412 0.0037 0.2123 0.0075 0.4103 0.0113 0.5879 0.0151 0.7451 0.0038 0.2178 0.0076 0.4152 0.0114 0.592.3 0.0152 0.7489 0.0039 0.2233 0.0077 0.4202 0.0115 0.5967 1 0.0153 0.7528 0.0040 0.2287 0.0078 0.4251 0.0116 0.6010 0.0154 0.7566 0.0041 0.2341 0.0079 0.4299 1 0.0117 0.6054 0.0155 0.7604 0.0042 0.2.395 0.0080 0.4348 0.0118 0.6097 0.0156 0.7642 0.0043 0.2449 0.0081 0.4397 0.0119 0.6140 0.0157 0.7680 0.0044 0.2503 0.0082 0.4445 0.0120 0.6184 0.0158 0.7718 0.0045 0.2557 0.0083 0.4494 0.0121 0.6227 0.0159 0.7756 0.0046 0.2611 0.0084 0.4542 0.0122 0.6269 0.0160 0.7793 0.0047 0.2664- 0.0085 0.4590 I 0.0123 - 0.6312 0.0161 _ 0.7830 4040 Wheaton Way, Suite 202 933 West Third Ave, Suite 214 WASHINGTON ENGINEERING Bremerton, WA 98310 Spokane, WA 99201 Tel: 360-405-1420 Tel: 509-535-7292 Fax: 360-377-4185 Fax: 509-242-0840 -�-'17 FOOTING CALCULATOR Copyright 2008 12/12/2008 Conc Ftg-Slab v20081211 PROJECT: COLUMN LOCATIONS: DETERMINE FOOTING DIMENSIONS (UNREINFORCED) Column/Base Plate Dimensions 8 x 13 MATERIAL PRO Depth to bottom of footing D= 36 inches Concrete f Live Load 6000 lbs Concrete Unit Wt Structure Dead Load 1540lbs Steel Rebar Gr Soil Above Footing 01 lbs Allowable Soil Pressure Ftg/Column Dead Load ._ O lbs Soil Unit Wt Ultimate Load Pu=1.2DL+1.6LL 11448 lbs Soil Active Pressure Maximum Uplift Load 4500 lbs Soil Passive Pressure Maximum Lateral Load 5400 lbs Slidinq Friction Coeff Rough Foundation Size = Service Load/Soil Bearing Capacity Minimum Footing Area = 5.03 ft' psi pcf psi pcf Assume a square footing b= 2.24 ft Minimum b = 28 in Use b= 40 in WIDTH INCREASED FOR LATERAL STABILITY Unreinforced Ftg Thickness t= 14.5 in Footing Weight = 2014 lbs FIND FOOTING THICKNESS AND REINFORCEMENT Select trial footing thickness, rebar size and placement ........................ ....................... . t= 1,8 in .................... . c=' 3 i db= .... 1 in ............................ ....................... Calculate distance from extreme compression fiber to centroid of reinforcement d d=t-c-(.5'd b ) d= 14.5 in Determine Soil Pressure based on factored loads qs=Pu/Afooting 2277 psf Check one-way (beam) shear in footing for trial thickness cpVo=cp2(SQRT(f' j)bd (PVC= 49300lbs Vu=(Pu/b)(0.5(b-t)-d ) Vu= 429 lbs cpVC»Vu SATISFACTORY WASHINGTON ENGINEERING 4040 Wheaton Way, Suite 202 Bremerton, WA 98310 Tel: 360-405-1420 Fax: 360-377-4185 933 West Third Ave, Suite 214 Spokane, WA 99201 Tel: 509-535-7292 Fax: 509-242-0840 _5171 FOOTING CALCULATOR Copyright 2008 12/12/2008 Conc Ftg-Slab v20081211 Check two-way (punching) shear in trial footing TV,=cp4(SQRT(f',))bod cpV,= 221850 lbs V,=(P,,/b2 )(b2-(t+d )2 ) V„= 7826 lbs cpVC>>Vu SATISFACTORY Determine reinforcement required for footing based on critical moment at edge of column M,=q,b(0.5)`(0.5(b-t))2 Mu= 6748 ft -lbs kbar= M„hpbd2 kba 0.0107 ksl From Table A8, p= q.0011'; From Table A5, pn,;n0.00591. Use p= 0.00593 Required AS=pbd= 3.44 int Trial Bar Size 61 Trial Number of Bars 8' Provided As= 3.53 int SATISFACTORY CALCULATE UPLIFT RESISTANCE, Ur U, =.Weight of Footing + Weight of Soil Volume Above Footing + Structure Dead Load Ur = 5063 lbs UPLIFT RESISTANCE IS SATISFACTORY CALCULATE LATERAL RESISTANCE L, = ((Weight of Footing and Soil + Structure Dead Load)x( Friction Factor)+ Net Passive Pressure Lr = 4200 lbs OK - WITH USE OF SLAB RESTRAINING F Try b= 40' in E ft t= d= 36 14.5 FINAL FOOTING CONFIGURATION ..........._........... b = 40 Inches .__... 4040 Wheaton Way, Suite 202 933 West Third Ave, Suite 214 WASHINGTON ENGINEERING Bremerton, WA 98310 Spokane, WA 99201 Tel: 360-405-1420 Tel: 509-535-7292 Fax: 360-377-4185 Fax: 509-242-0840 4! 7 FOOTING CALCULATOR Copyright 2008 12/12/2008 Conc Ftg-Slab v20081211 TABLE A-5 Design Constants (3V/f' 200 Recommended design values I._(psi) -----.... 0.75 Vn n -- - (ksi)- kv--- 0.0593 fy = 40,000 psi 0.2717 30000.0050 4000 5000 0.0050 0.0053 0.0278 0.0372. 0.0436 0.0135 0.4828 0.0180 0.6438 0.0225 0.8047 0.0124 6000 0.0058 0.0490 0.0270 _L 0.9657 0.2771 0.0087 fy = 50,000 psi 0.0125 _ 3000 4000 5000 6000 0.0040 0.0206 0.0040 0.0275 0.0042 0.0324 0.0046 0.0364 0.0108 0.4828 0.0144 0.6438 0.0180 0.8047 0.0216 0.9657 0.2824 0.0088 fy = 60,000 psi 0.0126 0.6439 3000 4000 ®D� 0.0033 0.0214 0.2876 0.0090 0.4828 0.0120 0.6438 0.4781 5000 6000 0.0035 0.0039 0.0252 0.0283 0.0826 0.0150 0.8047 0.9657 0.2929 3000 4000 5000 - _010180 fy = 75,000 psi --- 0.0027 0.0116 0.0027 0.0155 0.0182 -- - 0.0072 0.4828 0.0096 0.6438 0.0120 0.8047 0.6524 6000 0.00381 0.0206 0.0144 0.9657 0.2982 TABLE A-8 Coefficient of Resistance (k) Versus Reinforcement Ratio (p) (f; = 3000 psi; fr 50,000 psi; Uriits of k Are ksi) 0.0010 kv--- 0.0593 0.2717 k- 0.0086 0.4638 0.0124 0.6355 0.0049 0.2771 0.0087 0.4686 0.0125 0.6397 0.0012 0.0710 0.0050 0.2824 0.0088 0.4733 0.0126 0.6439 0.0013 0.0768 0.0051 0.2876 0.0089 0.4781 0.0127 0.6482 0.0014 0.0826 0.0052 0.2929 0.0090 0.4828 0.0128 0.6524 0.0015 0.0884 0.0053 0.2982 0.0091 0.4875 i 0.0129 0.6565 0.0016 0.0942 0.0054 0.3034 0.0092 0.4923 0.0130 0.6607 0-0017 0.1000 0.0055 0.3086 0.0093 0.4970 0.0131 0.6649 0.0018 0.1057 0.0056 0.3139 0.0094 0.5016 0.0132 0.6690 0.0019 0.1115 0.0057 0.3191 0.0095 0.5063 0.0133 0.6731 0.0020 0.1172 0.0058 0.3243 0.0096 0.5109 0.0134 0.6773 0.0021 0.1229 0.0059 0.3294 0.0097 0.5156 0.0135 0.6814 0.0022 0.1286 0.0060 0.3346 0.00980.5202 0.0136 0.6854 0.0023 0.1343 0.0061 0.3397 0.0099 0.5248 0.0137 0.6895 0.0024 0.1399 0.0062 0.3449 0.0100 0.5294 0.0138 0.6936 0.0025 0.1456 0.0063 0.3500 0.0101 0,5340 0.0139 0.6976 0.0026 0.1512 0.0064 0.3551 0.0102 0.5386 0.0140 0.7017 0.0027 0.1569 0.0065 0.3602 0.0103 0.5431 0.0141 0.7057 0.0028 0.1625 0.0066 0.3653 0.0104 0.5477 0.0142 0.7097 0.0029 0.1681 0.0067 0.3703 0.0105 0.5522 0.0143 0.7137 0.0030 0.1736 0.0068 0.3754 0.0106 0.5567 0.0144 0.7176 0.0031 0.1792 0.0069 0.3804 0.0107 0.5612 0.0145 0.7216 0.0032 0.1848 0.0070 0.3854 0.0108 0.5657 0.0146 0.7255 0.0033 0.1903 0.0071 0.3904 0.0109 0.5701 0.0147 0.7295 0.0034 0.1958 0.0072 0.3954 0.0110 0.5746 0.0148 0.7334 0.0035 0.2014 0.0073 0.4004 0.0 11 1 0.5790 0.0149 0.7373 0.0036 0.2069 0.0074 0.4053 0.0112 0.5835 0.0150 0.7412 0.0037 0.2123 0.0075 0.4103 0.0113 0.5879 0.0151 0.7451 0.0038 0.2178 0.0076 0.4152 0.0114 0.5923 0.0152 0.7489 0.0039 0.2233 0.0077 0.4202 0.0115 0.5967 i 0.0153 0.7528 0.0040 0.2287 0.0078 0.4251 0.0116 0.6010 0.0154 0.7566 0.0041 0.2341 0.0079 0.4299 0.0117 0.6054 0.0155 0.7604 0.0042 0.2395 0.0080 0.4348 0.0118 0.6097 0.0156 0.7642 0.0043 0.2449 0.0081 0.4397 0.0119 0.6140 0.0157 0.7680 0.0044 0.2503 0.0082 0.4445 0.0120 0.6184 0.0158 0.7718 0.0045 0.2_557 0.0083 0.4494 0.0121 0.6227 0.0159 0.7756 0.0046 0.2611 - 0.0084 0.4542 0.0122 0.6269 0.0160 0.7793 0.0047 0.2664 0.0085 0_4590 0.0123 0.6312 0.0161 0.7830 4040 Wheaton Way, Suite 202 933 West Third Ave, Suite 214 WASHINGTON ENGINEERING Bremerton, WA 98310 Spokane, WA 99201 Tel: 360405-1420 Tel: 509-535-7292 Fax: 360-377-4185 Fax: 509-242-0840 ��7 Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6.Decernber Z _..ne: 7:38:01 AM Page: 1 of 26 VP Buildings 3200 Players Club Circle Memphis, TN 38125-8843 STRUCTURAL DESIGN DATA Project: City of Port Townsend Golf Course Building Name: Fast -Track Builder PO #: Jobsite: 1948 Blaine Street City, State: Port Townsend, Washington 98368 County: Jefferson Country: United States TABLE OF CONTENTS File: Fast -Track Version: 7.1c Date: 12/6/2008 V,kZ,. tv of'Port Townsend Golf Course Building Reactions Package 6 December 204=90, 1--ne: 7:38:01 AM Letter of Certification Contact: Mark Grant Name: Address: 75 Haada Laas Road City, State: Port Townsend, Washington 98368 Country: United States Page: 2 of 26 Project: City of Port Townsend Golf Course Building Builder PO #: Jobsite: 1948 Blaine Street City, State: Port Townsend, Washington 98368 County, Country: Jefferson, United States This is to certify that the above referenced VP BUILDINGS project has been designed for the applicable portions of the follow ing Building Code and in accordance with the order documents which have stipulated t he following applied environmental loads and conditions: Overall Building Description Shape Overall Overall Floor Area Wall Area Roof Arca Max. Eavc Min. Eave Max. Root' Niin. Roof Peak Width Len h (s . ft.) (sq. ft. (sq. ftJ Ilei ht Height 2 Pilch Pitch Hei ht Fast -Track 40/0/0 60/0/0 1 2400 2667 2530 12/0/0 12/0/0 4.000:12 4.000:12 18/8/0 Loads and Codes - Shape: Fast -Track City: Port Townsend County: Jefferson State: Washington Country: United States Building Code: 2006 International Building Code Built Up: 05AISC - ASD Rainfall: 4.00 inches per hour Building Use: Low Hazard: Ag, Storage, Temp Cold Form: 04AISI - ASD Dead and Collateral Loads Live Load Collateral Gravity:0.00 psf Roof Covering + Second. Dead Load: 2.30 psf Live Load: 20.00 psf Reducible Collateral Uplift: 0.00 psf Frame Weight (assumed for scismic):2.50 psf' Wind Load Wind Speed: 85.00 mph Wind Exposure (Factor): C (0.853) Parts Wind Exposure Factor: 0.853 Wind Enclosure: Enclosed Wind Importance Factor: 0.870 Topographic Factor: 1.0000 NOT Windbome Debris Region Base Elevation: 0/0/0 Primary Zone Strip Width: 8/0/0 Paris / Portions Zone Strip Width: 4/0/0 Basic Wind Pressure: 11.66 psf Snow Load Roof Snow Load: 25.00 psf Design Snow (Sloped): 25.00 psf Snow Exposure Cal egory (Factor): 3 Sheltered (1.10) Snow Importance: 0.800 Thermal Category (Factor): Unheated (1.20) Ground / Roof Conversion: 0.70 % Snow Used in Seismic: 0.00 Seismic Snow Load: 0.00 psf Unobstructed, Slippery Roof Seismic Load Mapped Spectral Response - Ss: 125.00 %g Mapped Spectral Response - SI :45.00 %g Seismic Hazard / Use Group: Group I Seismic Importance: 1.000 Seismic Performance / Design Category: D Framing Seismic Period: 0.2044 Bracing Seismic Period: 0.1289 Framing R -Factor: 3.5000 Bracing R -Factor: 3.2500 Soil Profile Type: Stiff soil (D, 4) Diaphragm Condition: Flexible Frame Redundancy Factor: 1.3000 Brace Redundancy Factor:1.3000 Frame Seismic Factor (Cs): 0.2381 x W Brace Seismic Factor (Cs): 0.2564 x W Per Article 2.9 in the Builder Agreement, VP Buildings assumes that the Builder has called the local Building Official or Pro ject Engineer to obtain all code and loading information for this specific building site. The steel design is in accordance wi ill VP BUILDINGS standard design practices, which have been established based upon pertinent procedures and recommendations of the following organizations: American Institute of Steel Construction (AISC) American Iron and Steel Institute (AISI) American Welding Society (AWS) American Society for Testing and Materials (ASTM) Canadian Standards Association CSA W59 -Welded Steel Construction Limit State Design of Steel Structures Metal Building Manufacturers Association (MBMA) VP Buildings is certified by: CSA A660 Certified (Design and Manufacturing) IAS Approved Fabricator Canadian Welding Bureau Div. I Certified Fife: Fast -Track Version: 7.1c Date: 12/6/2008 of fort Townsend Golf Course Building Reactions Package 6 December „.... _..ne:ty 2 7:38:01 AM Page: 3 of 26 VP Buildings has designed the structural steel components of this building in accordance w ith the Building Code, Steel Spec itications, and Standards indicated above. Steel components are designed utilizing the following steel grades unless noted otherwise: 3 Plate members fabricated from plate, bar, strip steel or sheets ASTM A529, A572, A1011 - All Grade 55 ksi Hot Rolled Shapes (W, S, C, Angles, etc) ASTM A36, or ASTM A36Mod50, A529, A572, A588, A709, A992 -All Grade 50 ksi Tube and Pipe Sections ASTM A500, Grade B (Fy - 42 ksi pipe, Fy - 46 ksi tube) Light Gage Sections ASTM A 101 1 SS Grade .55 ksi, A653 SS Grade 60 ksi Round Rod Bracing ASTM A572 Grade 50 ksi This certification DOES NOT apply to the design of the foundation or other on -site structures or components not supplied by VP BUILDINGS, nor does it apply to unauthorized modifications to framing systems provided by VP BUILDINGS. Furthennore, it is understood that certification is based upon the premise that all components furnished by VP BUILDINGS wi II be erected or constructed in strict compliance with pertinent documents lumished by VP BUILDINGS. Sincerely, P.E. Prepared by: Reviewed by: VP BUILDINGS 3200 Players Club Circle, Memphis TN 38125 -8843 File: Fast -Track Version: 7.1c Date: 12/6/2008 vlkz. ty of Port Townsend Golf Course Building .Reactions Package 6 December 2111 _..ne: 7:38:01 AM Page: 4 of 26 Reactions - Expanded Report Shape: Fast -Track Builder Contact: Name: Address: 75 Haada Laas Road City, State Zip: Port Townsend, Washington 98368 Country: United States Loads and Codes - Shape: Fast -Track Project: City of Port Townsend Golf Course Building Builder PO 4: Jobsite: 1948 Blaine Street City, State Zip: Port Townsend, Washington 98368 County, Country: Jefferson, United States City: Port Townsend County: Jefferson State: Washington Country: United States Building Code: 2006 International Building Code Built Up: 05AISC - ASD Rainfall: 4.00 inches per hour Building Use: Low Hazard: Ag, Storage, Temp Cold Form: 04AIS1 - ASD Dead and Collateral Loads Live Load Collateral Gravity0.00 psf Roof Covering r- Second. Dead Load: 2.30 psf Live Load: 20.00 psf Reducible Collateral Uplift: 0.00 psf Frame Weight (assumed for seismic):2.50 psf Wind Load Wind Speed: 85.00 mph Wind Exposure (Factor): C(0.853) Parts Wind Exposure Factor: 0.853 Wind Enclosure: Enclosed Wind Importance Factor: 0.870 Topographic Factor: 1.0000 NOT Windborne Debris Region Base Elevation: 0/0/0 Primary Zone Strip Width: 8/0/0 Parts / Portions Zone Strip Width: 4/0/0 Basic Wind Pressure: 11.66 psf Snow Load Roof Snow Load: 25.00 psf Design Snow (Sloped): 25.00 psf Snow Exposure Category (Factor): 3 Sheltered (1.10) Snow Importance: 0.800 Thermal Category (Factor): Unheated (1.20) Ground/ Roof Conversion: 0.70 % Snow Used in Seismic: 0.00 Seismic Snow Load: 0.00 psl Unobstructed, Slippery Roof Seismic Load Mapped Spectral Response - Ss: 125.00 %g Mapped Spectral Response - S 1:45.00 %g Seismic Hazard / Use Group: Group Seismic Importance: 1.000 Seismic Perfonnance / Design Category: D Framing Seismic Period: 0.2044 Bracing Seismic Period: 0.1289 Framing R -Factor: 3.5000 Bracing R -Factor: 3.2500 Soil ProtileType: Stiffsoil (D, 4) Diaphragm Condition: Flexible Frame Redundancy Factor:1.3000 Brace Redundancy Factor:1.3000 Frarne Seismic Factor (Cs): 0.2381 x W Brace Seismic Factor (Cs): 0.2564 x W Per Article 2.9 in the Builder Agreement, VP Buildings assumes that the Builder has called the local Building Official or Pro ject Engineer to obtain all code and loading information for this specific building site. Load Type Descriptions D Material Dead Weight C Collateral Load CG Collateral Load for Gravity Cases CU Collateral Load for Wind Cases L Live Load ASL^ Alternate Span Live Load, Shifted Right ^ASL Alternate Span Live Load, Shifted Left PL2 Partial Live, Full, 2 Spans L> Live - Notional Right <L Live - Notional Left S Snow Load us]* Unbalanced Snow Load I, Shifted Right *USI Unbalanced Snow Load I, Shifted Left US2* Unbalanced Snow Load 2, Shifted Right *US2 Unbalanced Snow Load 2, Shifted Left SD Snow Drift Load SS Sliding Snow Load RS Rain Surcharge Load PFI Partial Load, Full, I Span PHI Partial Load, Half, I Span PF2 Partial Load, Full, 2 Spans PH2 Partial Load, Half, 2 Spans S> Snow - Notional Right <S Snow - Notional Left MRS Minimum Roof Snow MRS> Minimum Rool'Snow - Notional Right <MRS Minimum Roof Snow -Notional Left W Wind Load W 1> Wind Load, Case 1, Right <W I Wind Load, Case 1, Left W2> Wind Load, Case 2, Right <W2 Wind Load, Case 2, Lett W3> Wind Load, Case 3, Right <W3 Wind Load, Case 3, Left W4> Wind Load, Case 4, Right <W4 Wind Load, Case 4, Left W5> Wind Load, Case 5, Right <W5 Wind Load, Case 5, Left W6> Wind Load, Case 6, Right <W6 Wind Load, Case 6, Left WP Wind Load, Parallel to Ridge WPR Wind Load, 11 Ridge, Right WPL Wind Load, 11 Ridge, Left WPAI Wind Parallel - Ref A, Case I File: Fast -Track Version: 7.1 c Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6 December 7:38:01 AM Page: 5 of 26 WPA2 Wind Parallel - Ref A, Case 2 WPBI Wind Parallel - Ref B, Case 1 WPB2 Wind Parallel - Ref B, Case 2 WPCI Wind Parallel - Ref C, Case 1 WPC2 Wind Parallel - Ref C, Case 2 WPDI Wind Parallel - Ref D, Case I WPD2 Wind Parallel - Ref D, Case 2 WBI> Wind Brace Reaction, Case I, Right <WBI Wind Brace Reaction, Case 1, Left WB2> Wind Brace Reaction, Case 2, Right <WB2 Wind Brace Reaction, Case 2, Left WB3> Wind Brace Reaction, Case 3, Right <WB3 Wind Brace Reaction, Case 3, Left WB4> Wind Brace Reaction, Case 4, Right <WB4 Wind Brace Reaction, Case 4, Left WB5> Wind Brace Reaction, Case 5, Right <WB5 Wind Brace Reaction, Case 5, Left WB6> Wind Brace Reaction, Case 6, Right <WB6 Wind Brace Reaction, Case 6, Left MW Minimum Wind Load MWB Minimum Wind Bracing Reaction E Seismic Load F> Seismic Load, Right <E Seismic Load, Left EG Vertical Seismic Effect EG+ Vertical Seismic Effect, Additive EG- Vertical Seismic Effect, Subtractive EB> Seismic Brace Reaction, Right <EB Seismic Brace Reaction, Left FL Floor Live Load FL* Alternate Span Floor Live Load, Shifted Right *FL Alternate Span Floor Live Load, Shitted Left FD Floor Dead Load AL Auxiliary Live Load AL*> Auxiliary Live Load, Right, Right *AL> Auxiliary Live Load, Right, Left <AL* Auxiliary Live Load, Left, Right <*AL Auxiliary Live Load, Left, Left AL* Aux Live, Right *AL Aux Live, Left AL*>(1) Auxiliary Live Load, Right, Right, Aisle I *AL>(1) Auxiliary Live Load, Right, Left, Aisle <AL*(1) Auxiliary Live Load, Left, Right, Aisle I <*AL(l) Auxiliary Live Load, Left, Left, Aisle I AL*(1) Aux Live, Right, Aisle I *AL(1) Aux Live, Left, Aisle I AL*>(2) Auxiliary Live Load, Right, Right, Aisle 2 *AL>(2) Auxiliary Live Load, Right, Left, Aisle 2 <AL*(2) Auxiliary Live Load, Left, Right, Aisle 2 <*AL(2) Auxiliary Live Load, Left, Left, Aisle 2 AL*(2) Aux Live, Right, Aisle 2 *AL(2) Aux Live, Left, Aisle 2 AL*>(3) Auxiliary Live Load, Right, Right, Aisle 3 *AL>(3) Auxiliary Live Load, Right, Left, Aisle 3 <AL*(3) Auxiliary Live Load, Left, Right, Aisle 3 <*AL(3) Auxiliary Live Load, Left, Left, Aisle 3 AL*(3) Aux Live, Right, Aisle 3 *AL(3) Aux Live, Left, Aisle 3 AL*>(4) Auxiliary Live Load, Right, Right, Aisle 4 *AU(4) Auxiliary Live Load, Right, Left, Aisle 4 <AL*(4) Auxiliary Live Load, Left, Right, Aisle 4 <*AL(4) Auxiliary Live Load, Left, Left, Aisle 4 AL*(4) Aux Live, Right, Aisle 4 *AL(4) Aux Live, Left, Aisle 4 AL*>(5) Auxiliary Live Load, Right, Right, Aisle 5 *AL>(5) Auxiliary Live Load, Right, Left, Aisle 5 <AL*(5) Auxiliary Live Load, Left, Right, Aisle 5 <*AL(5) Auxiliary Live Load, Left, Left, Aisle 5 AL*(5) Aux Live, Right, Aisle 5 *AL(5) Aux Live, Left, Aisle 5 ALB Aux Live Bracing Reaction ALB> Aux Live Bracing Reaction, Right <ALB Aux Live Bracing Reaction, Left WALB> Wind, Aux Live Bracing Reaction, Right <WALB Wind, Aux Live Bracing Reaction, Left ALB>(1) Aux Live Bracing Reaction, Right, Aisle I <ALB(I) Aux Live Bracing Reaction, Left, Aisle I WALB>(I) Wind, Aux Live Bracing Reaction, Right, Aisle I <WALB(I) Wind, Aux Live Bracing Reaction, Left, Aisle I ALB>(2) Aux Live Bracing Reaction, Right, Aisle 2 <ALB(2) Aux Live Bracing Reaction, Left, Aisle 2 WALB>(2) Wind, Aux Live Bracing Reaction, Right, Aisle 2 <WALB(2) Wind, Aux Live Bracing Reaction, Left, Aisle 2 ALB>(3) Aux Live Bracing Reaction, Right, Aisle 3 <ALB(3) Aux Live Bracing Reaction, Left, Aisle 3 WALB>(3) Wind, Aux Live Bracing Reaction, Right, Aisle 3 <WALB(3) Wind, Aux Live Bracing Reaction, Left, Aisle 3 ALB>(4) Aux Live Bracing Reaction, Right, Aisle 4 <ALB(4) Aux Live Bracing Reaction, Left, Aisle 4 WALB>(4) Wind, Aux Live Bracing Reaction, Right, Ai sle 4 <WALB(4) Wind, Aux Live Bracing Reaction, Left, Aisle ALB>(5) Aux Live Bracing Reaction, Right, Aisle 5 <ALB(5) Aux Live Bracing Reaction, Left, Aisle 5 WALB>(5) Wind, Aux Live Bracing Reaction, Right, Aisle 5 <WALB(5) Wind, Aux Live Bracing Reaction, Left, Aisle 5 WALB Wind, Aux Live Bracing Reaction AD Auxiliary Dead Load UO User Defined Load U 1 User Defined Load - I U2 User Defined Load - 2 U3 User Defined Load - 3 U4 User Defined Load - 4 U5 User Defined Load - 5 U6 User Defined Load - 6 U7 User Defined Load - 7 U8 User Defined Load - 8 U9 User Defined Load - 9 UB User Brace Reaction UBI User Brace Reaction - I UB2 User Brace Reaction - 2 UB3 User Brace Reaction - 3 UB4 User Brace Reaction - 4 UB5 User Brace Reaction - 5 UB6 User Brace Reaction - 6 UB7 User Brace Reaction - 7 UB8 User Brace Reaction - 8 UB9 User Brace Reaction - 9 R Rain Load T Temperature Load V Shear File: Fast -Track Version: 7,1 c Date: 12/6/2008 )1kz,=ty of Port Townsend Golf Course Building Reactions Package 6 December 2 _..ne: 7:38:01 AM Page: 6 of 26 Overall Building Description Shape OVCrall Width Overall Len h.) Floor Are=11 rea Roof Area (sq. ft.) Max. Eave Height Min. Eave Ilei ht 2 Max. Roof Pitch Min. Roof IPitch Peak Height Fast -Track 40/0/0 60/0/0 1 2400 1 2667 1 2530 1 12/0/0 12/0/0 4.000:12 1 4.000:12 18/8/0 Descrintion Q 1 1 File: Fast -Track Version: 7.1c Date: 12/6/2008 M.tJ' of Port Townsend Golf Course Building Reactions Package 6 December 2 _..ne: 7:38:01 AM Page: 7 of 26 Wall: 2 (Grid:A ) NX x Portal Brace reactions ARE included with frame reactions. See respective frame cross -sections For reactions. File: Fast -Track Version: 7.1c %/;7 Date: 12/6/2008 LvAllr tJ' of Port Townsend Golf Course Building Reactions Package 6 December 2..... _..ne: 7:38:01 AM Page: 8 of 26 Wall: 4 ( Grid:D ) I I 1Q'.fi" 11,_11, Portal Brace reactions ARE included with frame reactions. See respective (Tame cross -sections for reactions. File: Fast -Track Version: 7.1c Date: 12/6/2008 avz,..Mty of'Port Townsend Golf Course Building Reactions Package 6 December 2..ne: 7:38:01 AM Page: 9 of 26 Wall: 4, Frame at: 0/6/0 I System (.000 1.0 D + 1.0 CG + 1.0 L> 1 D + CG + U 'y 2 System I A00 1.0 D + 1.0 CG + I.0 <L D + CG + <L 3 System 1.000 1.0 D + 1.0 CG + 1.0 ASL^ D + CG + ASL^ 4 System 1.000 I.0 D + 1.0 CG + 1.0 ^ASL D + CG + ^AS L 7 System 1.000 1.0 D + 1.0 CG + 1.0 S> D + CG + S> 8 System 1.000 1.0 D + 1.0 CG + LO <S D + CG + <S 9 System 1.000 1.0 D + 1.0 CG + 1.0 USI * D + CG + US I 10 System 1.000 1.01)+ 1.0 CG + 1.0 *US I D + CG + *US 1 I I System 1.000 1.0 D + 1.0 CG 1 1.0 W I> D F CG + W l> 12 System 1.000 1.0 D + 1.0 CG + 1.0 <W1 D+ CG + <W] 13 System 1.000 1.0 D + 1.0 CG + 1.0 W2> D + CG + W2> 14 System 1.000 1.0D+1.0CG+1.0<W2 D-ICG+<W2 15 System 1.000 .600 D + 0.600 CU + 1.0 W I> D + CU + W I> 16 System 1.000 1.600 D + 0.600 CU + 1.0 <W l D + CU i- <W 1 17 System 1.000 0.600 D + 0.600 CU + 1.0 W2> D i- CU + W2> 18 System 1.000 0.600 D + 0.600 CU + 1.0 <W2 D + CU + <W2 19 System 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 W I> D + CG 4- L + WI > 20 System 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 <W 1 D F CG + L + <W 21 System 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 W2> D + CG + L + W2> 22 System 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 <W2 D + CG + L + <W2 23 System 1.000 1.0 D + LO CG 10.750 S + 0.750 W I> D r CG + S + W I> 24 System 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 <W 1 D + CG + S + <W 1 25 System 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 W2=- D + CG + S + W2> 26 System 1.000 10 D + 1.0 CG + 0.750 S + 0.750 <W2 D -I CG + S + <W2 27 System 1.000 1.0 D + 1.0 CG + 0.910 E> + 0.700 EG I D + CG + E> + EG F 28 System 1000 1.0 D + 1.0 CG + 0.910 <E + 0.700 EGF D + CG + <E + EG+ 29 System 1.000 0.600 D + 0.600 CU + 0.910 F> + 0.700 EG - D + CU + E> + EG - 30 System 1.000 0.600 D + 0.600 CU + 0.910 <E + 0.700 EG - D + CU + <E + EG - 31 System 1.000 1.0 D + 1.0 CG + 0.682 F> + 0.525 EG+ D + CO + E> + EG+ 32 System 1.000 1.0 D + 1.0 CG I- 0.682 <E + 0.525 EG+ D F CG + <E + EG+ 45 System Derived 1.000 1.0 D + 1.0 CG + 1.0 WPA I D + CG + WPA 1 46 System Derived 1.000 0.600 D + 0.600 CU i 1.0 WPA I D + CU + WPA 1 47 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 W PAI D + CG + L + WPA I 48 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 WPA 1 D + CG + S + WPA 1 49 System Derived 1.000 LO D+ 1.0 CG+ 10 WPDI D+CG+ WPDI 50 System Derived 1.000 0.600 D I- 0.600 CU + 1.0 WPDI D I- CU + WPDI 51 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 WPDI D + CG + L +- WPDI 52 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 W PD I D + CG + S + W PD 1 53 System Derived 1.000 1.0 D + 1.0 CG + 1.0 WPA2 D + CG + WPA2 54 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPA2 D + CU + WPA2 55 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 WPA2 D + CG + L + WPA2 56 System Derived 1.000 1.0 D + 1.0 CG .. 0.750 S + 0.750 WPA2 D .I. CG + S + WPA2 57 System Derived 1.000 LO D + 1.0 CG + 1.0 WPD2 D + CG + WPD2 58 System Derived 1.000 0.600 D+0.600 CU+ LO WPD2 D+CU+ WPD2 59 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 WPD2 D + CG + L + WPD2 60 System Derived 1.000 1.0 D + 10 CG + 0.750 S + 0.750 WPD2 D + CG + 5 + WPD2 61 System Derived 1.000 1.0 D+ 1.0 CG + 1.0 WPB D+CG + WPBI 62 System Derived 1.000 0.600D+0.600 CU+1.0WPB I D.FCU+WPBI 63 System Derived 1.000 I.0D4-LO CG+0.750L+0.750WPB I D+CG+L+WPBI 64 System Derived 1.000 1.0D+I.0CG+0.7505+0.750 WPB D+CG+S+WPBI 65 System Derived 1.000 LO D + 1.0 CG + 1.0 WPC I D + CG + WPC 66 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPC I D + CU + WPC 67 System Derived 1.000 LO D + 1.0 CG + 0.750 L + 0.750 WPC 1 D + CG + L + WPC I 68 System Derived 1.000 1.0 D + LO CG + 0.750 S + 0.750 W PC I D + CG + S + WPC I 59 System Derived 1.000 1.0 D+ 1.0 CG + 1.0 WPB2 D+CG + WPB2 70 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPB2 D + CU + WPB2 71 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 WPB2 D + CG + L + WPB2 72 System Derived 1.000 1.0 D 4- 1.0 CG + 0.750 S + 0.750 WPB2 D + CG + S F WPB2 73 System Derived 1.000 1.0 D + 1.0 CG + 1.0 WPC2 D + CG + WPC2 74 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPC2 D + CU + WPC2 'S System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 WPC2 D + CG + L + WPC2 File: Fast -Track Version: 7.1c VM7Date: 12/6/2008 ty g f'Port Townsend Golf Course .wilding Reactions Package 6 December 2___ _ he: 7:38:01 AM Page: 10 of 26 76 System Deri ved 1.000 1.0 D + 1.0 CO + 0.750 S + 0.750 W PC2 D + CG + S + W PC2 77 System Deri vcd 1.000 1.0 D + I.0 CG + D-273 E> + 0.700 EG+ + 0.910 EB> D + CG + F> + EG+ + EB> 78 System Derived 1.000 1.0 D + 1.0 CG + 0.910 E> + 0.700 EGA- 1 0.273 EB> D + CG + E> + EG+ 1 EB> 79 System Derived 1.000 1.0 D+ 1.0 CG + 0.273 <E + 0.700 EG+ + 0.910 EB> p + CG + <E + EG+ + EB> 80 System Derived1.000 1.11 + 1.0 CG + 0.910 <E + 0.700 EG+ + 0.273 EB> D + CC; + <E + EG+ + EB> 81 System Deri ved 1.000 0.600 D + 0.600 CU + 0.273 E> + 0.700 EG - + 0.910 EB> D + CU + E> + EG- + EB> 82 System Derived 1.000 0.600 D + 0.600 CU + 0.910 E> + 0.700 EG - -F 0.273 EB> D + CU + + EG- + EB> 83 System Derived 1.000 0.600 D + 0.600 CU + 0.273 <E + 0.700 EG -+ 0.910 EB> % D + CU + <E + EG- + EB> 84 System De cd 1.000 0.600 D + 0.600 CU + 0.910 <E + 0.700 EG - + 0.273 EB> D + CU + <E + EG- I FB> 85 System Derivcd 1.000 1.0 D + 1.0 CG + 0.205 E> + 0.525 EG++ 0.682 EB> D + CG + E> + EG+ A EB> 86 System Derived 1.000 1.0 D + 1.0 CG + 0.682 E> + 0.525 EG+ + 0.205 EB> D + CG + E> + EG+ + EB> 87 System Derived 1.000 1.0 b + 1.0 CG + 0.205 <E + 0.525 FG I A 0.682 EB> D + CG + <E + EGI- + EB> 88 System Derived 1.000 1.0 D + 1.0 CG + 0.682 <E + 0.525 EG+ + 0.205 EB>D + CG + <E + EG+ + EB> 92 System Derived 1.000 1.0 D + 1.0 CG + 0.273 E> + 0.700 EG+ + 0.910 <EB ll + CG + E> + EG+ + <EB 93 System Derived 1.000 1.0 D + 1.0 CG + 0.910 E> + 0.700 FGA- + 0.273 <EB D +CG + E> + EG I + <EB 94 System Derived 1.000 1.0 D + 1.0 CG + 0.273 <E + 0.700 EG+ + 0.910 <EB D + CG + <E + EGA- + <Eg 95 System Derived 1.000 1.0 D + 1.0 CG -1- 0.910 <E + 0.700 EG+ + 0.273 <EB D + CG + <E + EG+ + <EB 96 System Derived l .000 .600 D A- 0.600 CU + 0.273 F> + 0.700 EG - + 0.910 <EB D + CU + E> + EG- + <EB 97 System Derived 1.000 0.600 D + 0.600 CU + 0.910 E� + 0.700 EG - + 0.273 <EB D + CU + E> + EG- + <EB 98 System Derived 1.000 0.600 U + (1.600 CU + 0.273 <E + 0.700 EG - + 0.910 <EB U + CU + <E + EG- + <EB 99 System Derived 1.000 0.600 D + 0.600 CU + 0.910 <E 1 0.700 EG - + 0.273 <EB D + CU + <E + EG- I <EB 100 System Derived 1.000 1.0 D + 1.0 CG + 0.205 E> + 0.525 EG+ + 0.682 <EB D + CG + E> + EG+ + <EB 101 System Derived 1.000 LO D + 1.0 CG + 0.682 E> + 0.525 EG+ + 0.205 <EB ID D -1. CG + E> + EG+ + <EB 102 System Derived 1.000 1.0 D + 1.0 CG + 0.205 <E + 0.525 EG+ + 0.682 <EB D + CG + <E + EG+ + <EB 103 S stem Derived 1.000 LO D + 1.0 CG + 0.682 <E + 0.525 EG+ + 0.205 <EB + C.C. + <F + Fn+ + FR File: Fast -Track Version: 7.1c )Ik Date: 12/6/2008 t1' of Port Townsend Golf Course Building Reactions Package 6 December 2 ne: 7:38:01 AM Page: 11 of 26 Wall: 4, Frame at: 0/6/0 Frame ID:Post & Beam Frame Type:Post & Beam Values shown are resisting forces of the foundation. Reactinns - 1Infarl-A r -1 1 T., n. Hx Type Exterior 0.1 _ 0.7 Column Interior Column Interior Column Exterior (.'olumn v X -Loc 0/0/0 8/6/0 31/6/0 1 40/0/0 Grid -Grid2 I -D I -C I -B 1-A Base Plate W x L (in.) 8 x 10 8X 10 8 x 10 8x 10 Base Plate Thickness (in.) 0.375 0.375 0375 0.375 Anchor Rod Qty/Dian. (in.) Column Base Elev. 2-0.750 100'-1" 2-0.750 100'-1" 2 -'0 .750 100'-1" 2 -0.750 100'-I" D Fri 0.1 _ 0.7 nn nz v CG Fnn - .1 L> F^ASL Flm 4.0 <L Fnn 4.0 ASL^ Fnn -0.9 3.2 0.9 Fri 0.9 0.9 Y_- S> Fri -0.0 5.2 .9 0.0 <S Fri -0.0 5.2 US l * Fri -0.6 3.0 .0 *Us I Fnn -0.2 - - 6.0 - - .2 Fnn -0.3 - L3 -2.4 1.3 .6Wl> <W I Fri 0.5 -0.2 -1.2 -1.9 -1.2 -2.4 0.3 .2 W2> Fill] -0.6 0.2 - -1.7 - -1.2 -0.3 -0.0 <W2 Frill 0.3 -0.0 -1.2 -1.7 0.6 0.2 CU Fnn - - L Frm 4.0 4.0 S Fnn - -0.0 5.2 5.2 - -0.0 F> Fnn -0.0 - 0.0 - 0.0 - -0.0 - EG+ Frm - - 0.2 - 0.2 - <E Frm 0.0 -0.0 - -0.0 - 0.0 EG- Frm - - -0.2 - -0.2 - - WPA I Brc 0.4 0.5 -1.9 -1.7 -0.4 -0.3 WPDI We 0.4 -0.4 -1.4 -1.3 -0.4 -0.3 WPA2 Brc 0.2 -0.3 -1.2 -LO -0.2 -0.2 WPD2 Brc 0.2 -0.2 -0.7 -0.6 -0.2 -0.1 WPB Brc 0.4 -0.3 -1.7 -1.9 -0.4 -0.5 WPC1 Brc 0.4 -0.3 -1.3 -1.4 -0.4 -0.4 WPB2 Brc 0.2 -0.2 -1.0 -1.2 -0.2 -0.3 WPC2 Brc 0.2 -0.1 -0.6 -0.7 -0.2 -0.2 EB> Brc - File: Fast -Track Version: 7.1c vlkzm. Date: 12/6/2008 ty of Port Townsend Golf Coarse Built-ling Reactions P icka ge 6 December 2., _..ne: 7:38:01 AM Page: 12 of 26 <EB I Bre I Frame Reactions - Factored Load Cases at Frame Cross Section: l Note: All reactions based on 2nd order structural analysis using the Direct Analysis Method File: Fast -Track Version: 7.1c X -Loc 0/0/0 8/6/0 31/6/0 40/0/0 Grid -Grid2 1-D l -C 1-13 1-A Ld Descri tion Hx Vy Hx Hz V Hx Hz V Hx V Cs (a licalion factor not shown) (k (k k (k) (k) (k) (k) (k) (k) (k) I D+CG+L> 0.1 4.8 4.8 _ 0.1 2 D+CG+<L 0.1 4.8 4.8 0.1 3 D + CG + ASL^ -0.83.9 3.9 -0.8 4 D+CG+AASL 0.9 1.6 1.6 0.9 7 D+CG+S> 0.0 5.9 5.9 0,0 8 D+CG+<S 0.0 5.9 5.9 0.0 9 D+CG+US!* -0.5 3.7 6.7 -0.2 10 D+CG+*USI - -0.2 6.7 3.7 -0.5 II D+CG+WI> -0.3 0.1 1.3 -1.7 1.3 -1.2 -0.5 -0.2 12 D+CG+<Wl 0.5 -0.2 -1.2 -1.2 -1.2 -1.7 0.3 0.1 13 D + CG + W2> -0.6 0.2 - -1.0 - -0.5 -0.3 0.0 14 D+CG+<W2 0.3 0.0 - -0.5 - -1.0 0.6 0.2 15 D+CU+WI> -0.3 0.0 1.3 -2.0 1.3 -1.5 -0.5 -0.2 16 D+CU+<W1 0.5 -0.2 -1.2 -1.5 -1.2 -2.0 0.3 0.0 17 D+CU+W2> -0.6 0.2 - -1.3 - -0.8 -0.3 -0.0 18 D+CU+<W2 0.3 -0.0 - -0.8 - -1.3 0.6 0.2 19 D+CG+L+W1> -0.3 0.1 1.0 1.9 1.0 2.3 -0.4 -0.1 20 D + CG + L + <W 1 0.4 -0.1 -0.9 2.3 -0.9 1.9 0.3 0.1 21 D + CG + L + W2> -0.4 0.2 - 2.4 - 2.8 -0.2 0.0 22 D+CG+L+<W2 0.2 0.0 - 2.8 - 2.4 0.4 0.2 23 D+CG+S+WI> -0.3 0.0 1.0 2.8 1.0 3.2 -0.4 -0.1 24 D+CG+S+<W1 0.4 -0.1 -0.9 3.2 -0.9 2.8 0.3 0.0 25 D + CG + S + W2> -0.4 0.2 - 3.3 - 3.7 -0.2 0.0 26 D+CG+S+<W2 0.2 0.0 - 3.7 - 3.3 0.4 0.2 27 D + CG + E> + EG+ -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 28 D + CG + <E + EG+ 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 29 D + CU + E> i- EG- -0.0 0.0 0.0 0.3 0.0 0.3 -0.0 0.0 30 D + CU + <E + EG- 0.0 0.0 -0.0 0.3 -0.0 0.3 0.0 0.0 31 D + CG + F> + EG+ -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 32 D + CG + <E -+ EG+ 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 45 D+CG+ WPAI 0.4 -0.5 - -1.2 - -1.0 -0.4 -0.3 46 D+CU+ WPAI 0.4 -0.5 -1.5 -1.3 -0.4 -0.3 47 D+CG+L i- WPAI 0.3 -0.3 2.3 2.5 -0.3 -0.2 48 D + CG + S + W PA 1 0.3 -0.4 3.1 3.3 -0.3 -0.2 49 D + CG + WPDI 0.4 -0.4 -0.6 -0.5 -0.4 -0.2 50 D+CU+ WPDI 0.4 -0.4 -0.9 -0.8 -0.4 -0.3 51 D+CG+L+WPDI 0.3 -0.2 2.7 2.8 -0.3 -0.2 52 D+CG+S+WPDI 0.3 -0.3 3.6 3.7 -0.3 -0.2 53 D + CG + WPA2 0.2 -0.3 -0.5 -0.3 -0.2 -0.1 54 D + CU + WPA2 0.2 -0.3 -0.8 -0.6 -0.2 -0.1 55 D + CG + L + W PA2 0.1 -0.2 2.8 3.0 -0.1 -0.1 56 D + CG + S + WPA2 0.1 -0.2 3.7 3.8 -0.1 -0.1 57 D + CG + WPD2 0.2 -0.2 0.0 0.2 -0.2 -0.1 58 D+CU+ WPD2 0.2 -0.2 -0.2 -0.1 -0.2 -0.1 59 D+CG+L+WPD2 0.1 -0.1 3.2 3.3 -0.1 40 60 D + CG + S + WPD2 0.1 -0.1 4.1 4.2 -0.1 -0.1 61 D+CG+WPBI 0.4 -0.3 -1.0 -1.2 -0.4 -0.5 62 D+CU+ WPBI 0.4 -0.3 -1.3 -1.5 -0.4 -0.5 63 D + CG + I_ + WPBI 0.3 -0.2 2.5 2.3 -0.3 -0.3 64 D+CG+S+WPBI 0.3 -0.2 3.3 3.1 -0.3 -0.4 65 D + CG F WPC 1 0.4 -0.2 -0.5 -0.6 -0.4 -0.4 66 D + CU + WPC 1 0.4 -0.3 -0.8 -0.9 -0.4 -0.4 67 D + CG + L + W PC I 0.3 -0.2 2.8 2.7 -0.3 42 68 D + CG + S + W PC I 0.3 -0.2 3.7 3.6 -0.3 -0.3 69 D + CG + W PB2 0.2 -0.1 -0.3 -0.5 -0.2 -0.3 File: Fast -Track Version: 7.1c Date: 12/6/2008 vkz� ty of Port Townsend Golf Course Building Reactions Package 6 December 2 _..ne: 7:38:01 AM Maximum Combined Reactions Summary with Factored Loads - Framing Nlme All v-6- V _-A - ')-A -A- ... I. ,;,, . _ �6_ M. -I n....l.,,.:.. nA... _A Page: 13 of 26 -0.2 -0.3 70 D+CU+WPB2 0.2 -0.1 -0.1 -0.2 -0.6 -0.2 -0.2 -0.8 -0.2 71 D+CG+L+WPB2 0.1 -0.1 Load -0.1 3.0 (-fix) -0.0 2.8 Case 72 D+CG+S+WPB2 0.1 -0.1 0.1 Case 3.8 0.1 (-Mzz) 3.7 0.0 73 D + CG + WPC2 0.2 -0.1 0.0 0.0 0.2 0.0 0.0 0.0 -0.0 74 D + CU + W PC2 0.2 -0.1 (in -k) 0.0 -0.1 0.0 -0.2 0.6 75 D+CG+L+WPC2 0.1 -0.0 0.1 - 3.3 0.1 3 3.2 0.1 76 D + CG + S + W PC2 0.1 -0.1 -0.0 0.0 4.2 0.0 0.0 4.1 0.0 77 D + CG + E> + EG+ + EB> -0.0 0.1 15 0.0 0.8 0.0 0.8 78 D + CO + E> + EG+ + EB> -0.0 0.1 - 0.0 0.8 12 0.0 0.8 2.0 79 D + CG + <E -1. EG+ + EB> 0.0 0.1 -0.0 0.8 40/0/0 -0.0 0.8 11 80 D + CG + <E + EG+ + EB> 0.0 0.1 - -0.0 0.8 3 -0.0 0.8 81 D + CU + E> + EG- + EB> -0.0 0.0 0.0 0.3 0.0 0.3 82 D + CU + E> + EG- + EB> -0.0 0.0 0.0 0.3 0.0 0.3 83 D + CU + <E + EG- + EB> 0.0 0.0 -0.0 0.3 40 0.3 84 D + CU + <E + EG- + EB> 0.0 0.0 -0.0 0.3 -0.0 0.3 85 D + CG + H> -I EG+ + EB> -0.0 0.1 0.0 0.8 0.0 0.8 86 D + CG + E> + EG+ + EB> -0.0 0.1 0.0 0.8 0.0 0.8 87 D+CG+<E+EG++EB> 0.0 0.1 -0.0 0.8 -0.0 0.8 88 D + CG + <E -r EG I- + EB> 0.0 0.1 -0.0 0.8 -0.0 0.8 92 D + CG + E> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 93 D + CG + E> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 94 D + CG + <E + EG -F + <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 95 D + CG + <E + EG+ + <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 96 D + CU + E> + EG- + <EB -0.0 0.0 0.0 0.3 0.0 0.3 97 D + CU + E> + EG- + <EB -0.0 0.0 0.0 0.3 0.0 0.3 98 D + CU + <E + EG- + <EB 0.0 0.0 -0.0 OJ -0.0 0.3 99 D + CU + <E + EG- + <EB 0.0 0.0 -0.0 0.3 -0.0 0.3 100 D + CG + E> I I3G+- + <EB -0.0 0.1 0.0 0.8 0.0 0.8 101 D + CG + E> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 102 D + CG + <E + EG+ + <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 103 D + CG + <E -1 EG I + <EB 0.0 0.1 -0.0 0.8 40 0.8 Maximum Combined Reactions Summary with Factored Loads - Framing Nlme All v-6- V _-A - ')-A -A- ... I. ,;,, . _ �6_ M. -I n....l.,,.:.. nA... _A Page: 13 of 26 -0.2 -0.3 Hrz lett -0.1 -0.2 Load -0.1 -0.2 F1rz Out -0.2 -0.2 Load -0.2 -0.2 Mom ew -0.1 -0.1 Load -0.1 -0.1 (-fix) -0.0 0.1 Case -0.0 0.1 (Hz) 0.0 0.1 Case 0.0 0.1 (-Mzz) -0.0 0.0 Case -0.0 0.0 (k) 0.0 0.0 0.0 0.0 (k) -0.0 0.1 -0.0 0.1 (in -k) 0.0 0.1 0.0 0.1 0.6 -0.0 0.1 12 -0.0 0.1 - 0.0 0.1 3 0.0 0.1 -0.0 0.0 -0.0 0.0 - 0.0 0.0 - 0.0 0.0 1.3 -0.0 0.1 15 -0.0 0.1 0.0 0.1 0.0 0.1 - X -Loc Grid Hrz lett Load Hrz Right Load Hlz In Load F1rz Out Load Uplift Load Vlt Down Load Mom ew Load Mom cew Load (-fix) Case (Hx) Case (-Hz) Case (Hz) Case (-Vy) Case (Vy) Case (-Mzz) Case (Mzz) Case (k) (k) (k) (k) k (k) (in -k) (in -k) 0/0/0 I -D 0.6 13 0.5 12 - - - 0.8 3 0.9 4 8/6/0 I -C - - - - 1.2 12 1.3 11 2.0 15 6.7 10 31/6/0 I -B - - - - 1.2 12 1.3 11 2.0 16 6.7 9 40/0/0 ]-A 0.5 11 0.6 14 - - 0.8 3 0.9 4 File: Fast -Track Version: 7.1c Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6 December 2--- _..ne: 7:38:01 AM Page: 14 of 26 Wall: 4, Frame at: 20/0/0 Design Load Combinations - Framinn I System 1.000 1.0 D + 1.0 CC + 1.0 S> D + CG + S> 2 System 1.000 1.0 D 4- 1.0 CG + 1.0 <S D + CG F <S 3 System 1.000 1.0 D + 1.0 CC F 1.0 US] * D + CC + USI 4 System 1.000 1.0 D + 1.0 CC + 1.0 *USI D + CC + *US) 5 System 1.000 I.0D+I.0CC+I.0W1> D+CC+WI> 6 System 1.000 LO D + 1.0 CG t LO <W I D + CC + <W 1 7 System 1.000 1.0 D + 1.0 CG + 1.0 W2> D + CC + W2> 8 System 1.000 1.0 D + 1.0 CG + 1.0 <W2 D + CC + <W2 9 System 1.000 0.600 D r 0.600 CU + 1.0 W t> D + CU + W I> 10 System 1.000 .600 D + 0.600 Cu + 1.0 <W 1 D + CU + <W 1 I I System 1.000 0.600 D + 0.600 CU + 1.0 W2> D + CU F W2> 12 System 1.000 0.600 D t 0.600 CU + 1.0 <W2 D + CU 4 <W2 13 System 1.000 1.0 D + I.0 CC + 0.750 S + 0.750 W I> D + CG + S + W 1> 14 System 1.000 1.0 D+ 1.0 CG + 0.750 S + 0.750 <W I D + CG + S + <W I 15 System 1.000 1.0 D 4 1.0 CG + 0.750 S + 0.750 W2> D + CC + S + W2> 16 System 1.000 1.0 D+ 1.0 CC + 0.750 S + 0.750 <W2 D + CG + S + <W2 17 System 1.000 1.0 D + 1.0 CC + 0.910 E> + 0.700 EG+ D + CG + E> + EG+ 18 System 1.000 1.0 D + 1.0 CC + 0.910 <E + 0.700 EG+ D + CG + <E + EG+ 19 System 1.000 0.600 D + 0.600 CU + 0.910 E> + 0.700 EG - D + CU + E> + EG - 20 System 1.000 0.600 D + 0.600 CU + 0.910 <E + 0.700 EG - D + CU 4 <E + EG - 21 System 1.000 1.0 D + LO CC + 0.682 E> + 0.525 EG+ D + CG + E> + EG+ 22 System 1.000 LO D + 1.0 CC + 0.682 <E + 0.525'EG i- D + CG + <E + EG+ 35 System Derived 1.000 1.0 D 4- 1.0 CG + 1.0 WPA 1 D + CC + WPA 1 36 System Derived 1.000 0.600 D + 0.600 CO + 1.0 WPA I D + CU + WPA I 37 System Derived 1.000 1.0 D 4- 1.0 CC + 0.750 S + 0.750 WPA I D + CC + S + WPA 1 38 System Derived 1.000 1.0 D+ 1.0 CG + 1.0 WPDI D t CG + WPDI 39 System Derived 1.000 0.600D+0,600 CU+1.0WPDI D+CU+WPDI 40 System Derived 1.000 I.0D+1.0CC4-0.750S+0.750 WPDI D+CC+S+WPDI 41 System Derived 1.000 1.0 D + 1.0 CC + LO WPA2 D + CC + WPA2 42 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPA2 D + CU + WPA2 43 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPA2 D + CC + S + WPA2 44 System Derived 1.000 1.0 D+ 1.0 CG + lA WPD2 D I CG+ WPD2 45 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPD2 D + CU + WPD2 46 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 WPD2 D + CC + S + WPD2 47 System Derived 1.000 1.0 D+ 1.0 CG + 1.0 WPB D+CC + WPB1 48 System Derived 1.000 0.600 D 1 0.600 CU+ 1.0 WPB D+CU+ WPBI 49 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPB 1 D + CC + S + WPB I 50 System Derived 1.000 1.0 D + 1.0 CG + LO WPC D I CG + WPCI 51 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPC I D 4- CU + WPC I 52 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPC I D + CC + S + WPC I 53 System Derived 1.000 1.0 D + 1.0 CC + 1.0 WPB2 D + CC + WPB2 54 System Derived 1.000 0.600 D t 0.600 CU 4- 1.0 WPB2 D+CU+ WPB2 55 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 WPB2 D + CC + S + WPB2 56 System Derived 1.000 1.0 D + 1.0 CG + 1.0 WPC2 D + CC + WPC2 57 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPC2 D + CU + WPC2 58 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 WPC2 D + CG + S + WPC2 59 System Derived 1-000 1.0 D + 1.0 CC + 0.273 E> + 0.700 EG+ + 0.910 EB> D + CC 4- E> + EG+ + EB> 60 System Derived 1.000 1.0 D -t I.0 CG + 0.910 E> + 0.700 EG+ + 0.273 EB> D + CC + E> + EG+ + EB> 61 System Derived 1.000 1.0 D + 1.0 CG + 0.273 <E + 0.700 EG 1 1 0.910 EB> D + CC + <E + EG+ + EB> 62 System Derived 1.000 1.0 D + 1.0 CC + 0.910 <E + 0.700 EG+ + 0.273 EB> D + CC + <E + EG+ + EB> 63 System Derived 1.000 0.600 D + 0.600 CU + 0.273 E> + 0.700 EG - + 0.910 EB> D + CU + E> + EG- t EB> 64 System Derived 1.000 .600 D + 0.600 CU + 0.910 E> -t 0.700 EG - + 0.273 EB> D + CU + E> + EG- + EB> 65 System Derived 1.000 0.600 D + 0.600 CU + 0.273 <E + 0.700 EG - + 0.910 EB> D+ CU + <E + EG- + EB> 66 System Derived 1.000 0.600 D+ 0.600 CU + 0.910 <E + 0.700 EG - + 0.273 EB> D + CU + <E + EG- + EB> 67 System Derived 1.000 1.0 D + 1.0 CC + 0.205 E> + 0.525 EG r- + 0.682 EB> D + CC + E> + EG+ + EB> 68 System Derived 1.000 1.0 D + 1.0 CC + 0.682 E> + 0.525 EG+ + 0.205 EB> D + CC + F> + EG+ + EB> 69 System Derived 1.000 1.0 D+ 1.0 CG + 0.205 <E + 0.525 EG+ + 0.682 EB> D + CG + <E + EG t + EB> 70 System Derived 1.000 1.0 D+ 1.0 CG + 0.682 <E + 0.525 EG+ + 0.205 EB> D + CC + <E + EG+ + EB> 74 System Derived 1.000 1.0 D + 1.0 CG + 0.273 F> + 0.700 EG+ + 0.910 <EB D + CG + F> + EG+ + <EB 75 System Derived 1.000 1.0 D + 1.0 CG + 0.910 E> + 0.700 EG+ + 0.273 <EB D + CG + E> + EG+ -t- <EB 76 System Derived 1.000 1.0 D + 1.0 CG + 0.273 <E + 0.700 EGF + 0.910 <EB D + CG + <E + EG+ + <EB Pile: Fast -Track Version: 7.1c Date: 12/6/2008 vlkzm.,Vmty of Port Townsend Golf Course Building Reactions Package 6 December 2 "Whe: 7:38:01 AM Page: 15 of 26 File: Fast -Track Version: 7.1c 77 System Derived 1.000 1.0 D + 1.0 CG 10.910 <E 10.700 EG+ + 0.273 <EB D + CG + <E + EG+ + <EB 78 System Derived 1.000 0.000 D + 0.600 CU + 0.273 E> + 0.700 EG - + 0.910 <EB D + CU t E> + EG- + <EB 79 System Derived 1.000 0.600 D + 0.600 CU + 0,910 E> + 0.700 EG - + 0.273 <EB D + CU + E> i- EG- + <EB 80 System Derived 1.000 0,600 D + 0.600 CU + 0.273 <F 1- 0.700 EG - + 0.910 <EB p + CU + <E + EG_ + <EB 8) System Derived 1.000 0.600 D + 0,600 CU + 0.910 <E + 0.700 EG - + 0,273 <EB D + CU + <E + EG- + <EB 82 System Derived 1.000 LO D + LO CG + 0.205 E> + 0.525 EG+ + 0.682 <EB D + CG i E> + EG+ + <EB 83 System Derived 1.000 1.0 D + 1.0 CG + 0.682 E> + 0.525 F.G+ + 0.205 <EB ID D + CG + E> + EG+ + <EB 84 System Derived 1.000 1.0 D + 1.0 CO + 0,205 <E + 0.525 EG+ + 0.682 <EB D + CG + <E + EG+ + <E13 85 System Derived 1.000 1.0 D + 1.0 CG + 0.682 <E + 0.525 EG+ + 0,205 <EB + CG I- <F + EG+ i <ER File: Fast -Track Version: 7.1c Date: 12/6/2008 ILVW�tjl of Port Townsend Golf Course Building Reactions Package 6 December A � _..ne: 7:38:01 AM Page: 16 of 26 Wall: 4, Frame at: 20/0/0 Frame ID: Rigid Frame Frame Type:Rigid Frame e Values shown are resisting forces of the foundation. Reactions - Unractored Load Type at Frame Cross Section: 2 Type Exterior Column Exterior Column X -Loc 0/0/0 40/0/0 Grid -Grid2 2-D 2-A Base Plate W x L (in.) 8 x 13 8 x 13 Base Plate Thickness (in.) 0.375 0.375 Anchor Rod Qty/Diam. (in.) 4-0.750 4-0.750 Column Base Elev. 100'-1" 100'-1" Load Type Desc. Fix I Hz I Vy Hx Hz V D Fnn 0.6 1.4 -0.6 1.4 CG Frm - - - - S> Frm 4.8 9.9 -4.8 9.9 <S Fnn 4.8 9.9 -4.8 9.9 us]* Fnn 4.2 5.8 -4.2 10.0 *USI Fnn 4.2 10.0 -4.2 5.8 W l> Fnn -2.7 -4.2 0.3 -3.1 <W 1 Fnn -0.3 -3.1 2.7 -4.2 W2> Fnn -2.5 -2.5 0.1 -1.4 <W2 Firm -0.1 -1.4 2.5 -2.5 CU Fnn - - - - S Fnn 4.8 9.9 -4,8 9.9 F> Fnn -0.5 -0.4 -0.5 0.4 EG+ Fnn 0.2 0.3 -0.2 0.3 <E Fnn 0.5 0.4 0.5 -0.4 EG- Fnn -0.2 -0.3 0.2 -0.3 W PA I Brc -0.7 -0.8 -5.3 0.9 -0.8 -4.9 WPDI Brc -0.4 0.8 -2.5 0.6 0.8 -2.3 WPA2 Brc -0.5 -0.8 -3.7 0.7 -0.8 -3.3 WPD2 Brc -0.2 0.8 -0.9 0.4 0.8 -0.6 WPB 1 Brc -0.9 -0.8 -4.9 0.7 -0.8 -5.4 W PC I Brc -0.6 0.8 -2.3 0.4 0.8 -2.5 WPB2 Bre -0.7 -0.8 -3.3 0.5 -0.8 -3.7 W PC2 Brc -0.4 0.8 -0.7 0.2 0.8 -0.9 EB> Brc 0.0 -0.9 -1.0 -0.0 -0.9 -1.0 <EB Brc -0.0 0.9 1.0 0.0 0.9 LO Frame Reactions - Factored Load Cases at Frame Cross Section: 2 Note: All reactions based on 2nd order structural analysis using the Direct Analysis Method File: Fast -Track Version: 7.1c Date: 12/6/2008 tv of Port Townsend Golf C'ou�-se Building Reactions Package 6 December 2 ne: 7:38:01 AM Page: 17 of 26 X-Luc 0/0/0 40/0/0 Giidl -Grid2 2-D 2-A Ld Description Hx Hz Vy Hx Hz V Cs (application tactor not shown) k) (k) (k) k) (k) I D+CG+-S> 5.4 11.3 -5.4 11.3 2 D+CG+<S 5.4 11.3 -5.4 11.3 3 D+ CG+USI * 4.8 7.2 -4.8 11.4 4 D+CG+*USI 4.8 11.4 -4.8 7.2 5 D+CG+WI> -2.1 -2.8 -0.3 -1.7 6 D+CG+<Wl 0.3 -1.7 2.1 -2.8 7 D+CG+W2> -1.9 -1.1 -0.5 0.0 8 D+CG+<W2 0.5 0.0 1.9 -I.1 9 D+CU+W1> -2.3 -3.3 -0.1 -2.2 10 D+CU+<Wl 0.1 -2.2 2.3 -3.3 11 D+CU+W2> -2.1 -1.7 -0.3 -0.6 12 D+CU+<W2 0.3 -0.6 2.1 -1.7 13 D+CG+S+WI> 2.2 5.7 -4.0 6.5 14 D+CG+S+<WI 4.0 6.5 -2.2 5.7 15 D+CG+S+W2> 2.3 6.9 -4.1 7.8 16 D+CG+S+<W2 4.1 7.8 -2.3 6.9 17 D+CG+E>+EG+ 0.2 1.2 -1.2 2.0 18 D+CG+<E+EG+ 1.2 2.0 -0.2 1.2 19 D+CU+E>+EG- -0.2 0.2 -0.7 1.0 20 D+CU+<E+EG- 0.7 1.0 0.2 0.2 21 D+CG+E>+EG+ 0.3 1.3 -LO 1.9 22 D + CG + <E + EG+ H) 1.9 -0.3 1.3 35 D + CG + W PA I -0.1 -0.8 -3.9 0.3 -0.8 -3.5 36 D + CU + WPA I -0.3 -0.8 -4.5 0.5 -0.8 -4.1 37 D+CG+S+WPAI 3.7 -0.6 4.8 -3.5 -0.6 5.1 38 D+CG+WPDI 0.2 0.8 -1.1 -0.0 0.8 -0.9 39 D+CU+WPDI -0.1 0.8 -1.7 0.2 0.8 -1.4 40 D+CG+S+WPDI 3.8 0.6 6.9 -3.7 0.6 7.1 41 D+CG+WPA2 0.1 -0.8 -2.3 0.1 -0.8 -1.9 42 D + CU + WPA2 -0.1 -0.8 -2.8 0.4 -0.8 -2.4 43 D + CG + S I- WPA2 3.8 -0.6 6.1 -3.6 -0.6 6.4 44 D + CG + WPD2 0.3 0.8 0.5 -0.2 0.8 0.8 45 D + CU + WPD2 0.1 0.8 -0.0 0.0 0.8 0.2 46 D+CG+S+WPD2 4.0 0.6 8.2 -3.9 0.6 8.3 47 D+CG+ WPBI -0.3 -0.8 -3.5 0.1 -0.8 -3.9 48 D + CU +WPB 1 -0.5 -0.8 -4.1 0.3 -0.8 -4.5 49 D+CG+S 4 WPBI 3.5 -0.6 5.1 -3.7 -0.6 4.8 50 D+CG+WPCI 0.0 0.8 -0.9 -0.2 0.8 -1.1 51 D+CU+WPCI -0.2 0.8 -1.5 0.1 0.8 -1.7 52 D+CG+S+WPCI 3.7 0.6 7.1 -3.8 0.6 6.9 53 D+CG+WPB2 -0.1 -0.8 -1.8 -0.1 -0.8 -2.3 54 D + CU + WPB2 -0.4 -0.8 -2.4 0.1 -0.8 -2.9 55 D + CG + S -t WPB2 3.6 -0.6 6.4 -3.8 -0.6 6.0 56 D + CG + WPC2 0.2 0.8 0.7 -0.3 0.8 0.6 57 D + CU + WPC2 -0.0 0.8 0.2 -0.1 0.8 -0.0 58 D+CG+S+WPC2 3.9 0.6 8.3 -4.0 0.6 8.2 59 D + CG + E> + EG+ + EB> 0.6 -0.8 0.6 -0.9 -0.8 0.8 60 D + CG + E> + EG+ + EB> 0.2 -0.2 1.0 -1.2 -0.2 1.7 61 D + CG + <E + EGF + EB> 0.9 -0.8 0.8 -0.6 -0.8 0.6 62 D + CG + <E + EG++ EB> 1.2 -0.2 1.8 -0.2 -0.2 H) 63 D + CU + E> + EG- + EB> 0.1 -0.8 -0.4 -0.4 -0.8 -0.2 64 D+ CU + E> + EG-+ EB> -0.2 -0.2 -0.0 -0.8 -0.2 0.7 65 D +- CU + <E + EG- + EB> 0.4 -0.8 -0.2 -0.1 -0.8 -0.4 66 D + CU + <E + EG- + EB> 0.8 -0.2 0.7 0.2 -0.2 -0.0 67 D + CG + E> + EG+ + EB> 0.6 -0.6 0.8 -0.8 -0.6 1.0 68 D + CG + El + EG+ + EB> 0.3 -0.2 LI -1.1 -0.2 1.7 69 D + CG +- <E + EG+ + EB> 0.8 -0.6 1.0 -0.6 -0.6 0.8 70 D + CG + <E F EG I .. EB> 1.1 -0.2 1.7 -0.3 -0.2 1.1 74 D + CG + E> + EG+ + <EB 0.5 0.8 2.4 -0.8 0.8 2.7 75 D+CG+E>+EG++<EB 0.2 0.2 1.5 -1.2 1 0.2 2.3 File: Fast -Track Version: 7.1c Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6 December 2 ne: 7:38:01 AM Maximum Combined Reactions Summary with Factored Loads - Framing Note: All reactions based on 2nd orders-fi.rat a. I-;� „ :.. .h- -Loc -Loc Grid Ha left Load Hrz Right Load Hrz In Load Ha Out Load V UpIiR Load Vrt Down Load Man cw Load Mom ccw Load Page: 18 of 26 76 D + CG + <E + EG+ + <EB 0.8 0.8 2.7 0.5 0.8 2.5 77 D + CG + <E + tG+ + <EB 1.2 0.2 2.3 0.2 0.2 1.5 78 D+CU+E>+EG-+<EB 0.1 0.8 1.4 0.4 0.8 1.7 79 D+CU+E7+EG-+<EB -0.302 0.5 0.7 0.2 1.3 80 D+CU+<E+EG-+<EB 0.4 0.8 1.7 0.1 0.8 1.5 81 D+CU+<E+EG- i <EB 0.7 0.2 1.3 0.3 0.2 0.5 2L,( +Fj+EG++<EB 0.5 0.6 2.2 0.8 0.6 2.4 [84 +E> r EG++<EB 0.3 0.2 1.5 -1.0 0.2 2.1 + <E + EG+ + <EB 0.8 0.6 2.4 -0.5 0.6 2.2 + <E + EG+ + <EB 1.0 0.2 2.1 -0.3 0.2 1.5 Maximum Combined Reactions Summary with Factored Loads - Framing Note: All reactions based on 2nd orders-fi.rat a. I-;� „ :.. .h- -Loc -Loc Grid Ha left Load Hrz Right Load Hrz In Load Ha Out Load V UpIiR Load Vrt Down Load Man cw Load Mom ccw Load (-Hx) Casc (Hx) Case (-Hz) Case (Hz) Case (V) Case Y (Vy) Case (-Mzz) Case (Mzz) Case (k) 2-D 2.3 9 (k) 5.4 k O I 0.8 41 k) (k) k (in -k) (m . 0.8 40/0/0 0/00 2-A 5.4 1 2.3 10 0.8 53 44 4.5 36 11.4 4 0.8 56 4.5 48 11.4 3 X -Lac Grid Description 0/0/0 2-D Portal Brace is attached to column. Reactions ARE included with fiame reactions. 40/0/0 2-A Portal Brace is attached to column. Reactions ARE included with Iiame reactions. File: Fast -Track Version: 7.1c Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6 December 2 __.ne: 7:38:01 AM Page: 19 of 26 Wall: 4, Frame at: 40/0/0 Frame ID: Rigid Frame Flame Type:Rigid Frame 11 Hx Values shown arc resisting forces of the foundation. Reactions - Unfactored Load Type at Frame Cross Section: 3 Type Exterior Column Exterior Column X -Loc 0/0/0 40/0/0 Grid -Grid2 3-D 3-A Base Plate W x L (in.) 8 x 13 8 x 13 Base Plate Thickness (in.) 0.375 0.375 Anchor Rod Qtv/Diam. (in.) 4 - 0.750 4 - 0.750 Column Base Elev. 100'-1" 100'-1" Load T e Desc. Hx Hz V z V D Fnn 0.6 - 1.4 1.4 CC Frm - S' Fnn 4.8 99 J 9.9 <S Frm 4.8 9.9 9.9 USI* Frm 4.2 5.8 -4.2- 10.0 *USI Fnn 4.2 10.0 -4.2 5.8 W 1 > Fnn -2.7 -4.2 0.3 -3.1 <W I Frm -0.3 -3.1 2.7 42 W2' Frm -2.5 -2.5 0.1 -1.4 WW2 Fnn -0.1 -1.4 2.5 -2.5 CU Frm - - S Fnn 4.8 9.9 -4.8 9.9 D Frm -0.5 -0.4 -0.5 0.4 EG+ Frm 0.2 0.3 -0.2 0.3 <E Frm 0.5 0.4 0.5 -0.4 EG- Fi m -0.2 -0.3 0.2 -0.3 WPA I Bic -0.4 -0.8 -2.5 0.6 -0.8 2.3 WPDI Brc -0.7 0.8 -5.4 0.9 0.8 -4.9 WPA2 Brc -0.2 -0.8 -0.9 0.4 -0.8 -0.7 WPD2 Brc -0.5 0.8 -3.7 0.7 0.8 -3.3 WPBI Brc -0.6 -0.8 -2.3 0.4 -0.8 -2.5 W PC I Brc -0.9 0.8 -4.9 0.7 0.8 -5.3 WPB2 Brc -0.4 -0.8 -0.6 0.2 -0.8 -0.9 WPC2 Brc -0.7 0.8 -3.3 0.5 0.8 -3.7 EB> Brc -0.0 -0.9 1.0 0.0 -0.9 1.0 <EB We 0.0 0.9 -1.0 -0.0 0.9 -1.0 Frame Reactions - Factored Load Cases at Frame Cross Section: 3 Note: All reactions based on 2nd order structural analysis using the Direct Analysis Method File: Fast -Track Version: 7.1c %/;7 Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6 December 2 _.. le: 7:38:01 AM Page: 20 of 26 4 4. 4' 51 5 5: 5: 5, 5° 5( 57 58 59 60 61 62 63 64 65 66 67 68 69 70 74 75 File: Fast -Track Version: 7.1c X -Loc _ 0/0/0t.72.1 40/0/0 Gidl - Id 3 -D3 -A Ld Descri tion Elx Hzx Hz V Cs a lication factor not shown) (k) (k)) (k) (k) 1 D+CG+S> 5.4 .4 I1.3 --- 2 D+CG+<S 5.4 .4 11.33 D+CG+USI 4.8 .8 11.44 D+CG+#USI 4.8 .8 7.25 D + CG + WI> -2.1 3 -1.76 D+CG+<Wl 0.3 1 -2.87 D+CG+ W2> -1.9 5 0.08 D+CG+<W2 0.5 9 -I.1 9 D + CU + W 1> -2.3 -3.3 -0.1 -2.2 10 D+CU+<W1 0.1 -2.2 2.3 -3.3 II D+CU+W2> -2.1 -1.7 -0.3 -0.6 12 D+CU+ <W2 0.3 -0.6 2.1 -1.7 13 D+CG+S+WI> 2.2 5.7 -4.0 6.5 14 D-1-CG+S+<W1 4.0 6.5 -2.2 5.7 15 D+CG+S+W2> 2.3 6.9 -4.1 7.8 16 D+CG+S+<W2 4.1 7.8 -2.3 6.9 17 D+CG+E>+EG4- 0.2 1.2 -1.2 2.0 8 D + CG + <E i- EG+ 1.2 2.0 -0.2 1.2 19 D+CU+E>+EG- -0.2 0.2 -0.7 1.0 20 D -1 CU + <E + EG- 0.7 1.0 0.2 0.2 2I D+CG+E> t EG+ 0.3 1.3 -1A 1.9 22 D + CG + <E + EG+ 1.0 1.9 -0.3 1.3 S5 D+CG+WPAI 0.2 -0:8 -1.1 -0.0 -0.8 -0.9 t6 D+CU+WPAI -0.1 -0.8 -1.7 0.2 -0.8 -1.5 17 D+CC, +S+WPAI 3.8 -0.6 6.9 -3.7 -0.6 7.1 18 D + CG + W PD I -0.1 0.8 -3.9 0.3 0.8 -3.5 �9 D+CU+WPD1 -0.3 0.8 -4.5 0.5 0.8 -4.1 0 D+CG+S+WPDI 3.7 0.6 4.8 -3.5 0.6 5.1 1 D+CG+WPA2 0.3 -0.8 0.6 -0.2 -0.8 0.7 2 D+CU+WPA2 0.1 -0.8 -0.0 0.0 -0.8 0.2 3 D + CG + S + WPA2 4.0 -0.6 8.2 -3.9 -0.6 8.3 4 D+CG+ WPD2 0.1 0.8 -2.3 0.1 0.8 -1.8 5 D + CU + WPD2 -0.I 0.8 -2.9 0.4 0.8 -2.4 6 D+CG+S+WPD2 3.8 0.6 6.0 -3.6 0.6 6.4 7 D+CG+ WPB1 0.0 -0.8 -0.9 -0.2 -0.8 -1.1 R D + C U + WPBI -0.2 -0.8 -1.4 0.1 -0.8 -1.7 D+CG+S+WpB1 3.7 -0.6 7.1 -3.8 -0.6 6.9 D, CG + W PC I -0.3 0.8 -3.5 0.1 0.8 -3.9 D+CU+ WPC1 -0.5 0.8 -4.1 0.3 0.8 -4.5 D+CG+S+WPCI 3.5 0.6 5.1 -3.7 0.6 4.8 D +CG + W PB2 0.2 -0.8 0.8 -0.3 -0.8 0.5 D + CU + WPB2 -0.0 -0.8 0.2 -0.1 -0.8 -0.0 D+ CG + S + W PB2 3.9 -0.6 8.3 -4.0 -0.6 8.2 D + CG + W PC2 -0.1 0.8 -1.9 -0.1 0.8 -2.3 D+CU+ WpC2 -0.4 0.8 -2.4 0.1 0.8 -2.8 D+CG+S+WPC2 3.6 0.6 6.4 -3.8 0.6 6.1 D t CG + E> + EG+ + EB> 0.5 -0.8 2.5 -0.8 -0.8 2.7 D+CG+E>+EG++EB> 0.2 -0.2 1.5 -1.2 -0.2 2.3 D + CG + <E + EG+ i EB> 0.8 48 2.7 -0.5 -0.8 2.4 D -1 CG + <E + EG+ + EB> 1.2 -0.2 2.3 -0.2 .0.2 1.5 D+CU+E>+EG- +EB> 0.1 -0.8 1.5 -0.4 48 1.7 D + CU + E> + EG- + EB> -0.3 -0.2 0.5 -0.7 -0.2 1.3 D+CU+<E+EG- +EB> 0.4 -0.8 1.7 -0.1 -0.8 1.4 D + CU + <E r EG- + EB> 0.7 -0.2 1.3 0.3 -0.2 0.5 D + CG + E> + EG+ + EB> 0.5 -0.6 2.2 -0.8 -0.6 2.4 D + CG + E> + EG+ + EB> 0.3 -0.2 1.5 -1.0 42 2.1 D + CG + <E t- EG++ EB> 0.8 -0.6 2.4 -0.5 -0.6 2.2 D + CG + <E + EG+ + EB> 1.0 -0.2 2.1 -0.3 -0.2 1.5 D+CG+Ej+EG++<EB 0.6 0.8 0.6 -0.9 0.8 0.8 D+CG+E> i EG++<EB 0.2 0.2 1.0 -1.2 0.2 1.8 File: Fast -Track Version: 7.1c Date: 12/6/2008 ty of ,Port Townsend Golf Coarse Building Reactions Package 6 December 2 _..ne: 7:38:01 AM Page: 21 of 26 76 D + CG + <E + F..G+ + <Eg 0.9 O.R 0.8 0.6 0.8 0.6 Load Hrc Out Load 77 D + CG + <F + EG,+ <EB 1.2 0.2 1.7 -0.2 0.2 I.0 Mom ccw Load 78 D +CU + E>+ EG -1 <EB 0. I 0.8 -0.4 -0.4 0.8 -0.2 (IIz) Case (-Vy) 79 D+CU+E>+EG-+<F.B -0.2 0.2 0.0 -0.8 0.2 0.7 (k) ROD+CU+<E+EG- I <EB 0.4 O.R 0.2 -0.1 0.8 -0.4 (k) 81 D+CU I <F+EG- +<EB 0.8 0.2 0.7 0.2 0.2 -0.0 3-D 2.3 9 82 D+ CG + Fj + EG+ + <EB 0.6 0.6 0.8 -0.8 0.6 1.0 4.5 39 11.4 83 D+CG+E>+EG++<EB 1 0.3 0.2 1.1 -1.1 0.2 1.7 5.4 l 2.3 84 D + CG i <E+ EG+ + <EB 0.8 0.6 1.0 -0.6 0.6 0.8 51 11.4 3 85 D+CG+<E+EG++<EB 1.1 0.2 1.7 -0.3 0.2 1.1 Maximum Combined Reactions Summary with Factored Loads - Framing X -Loc Grid Hrz left Load -Hr-/ Right Load Flrz In Load Hrc Out Load Uplift Load Vrt Down L,nad Mom cw Load Mom ccw Load (-Hx) Case (Fix) Case (-Hz) Case (IIz) Case (-Vy) Case (Vy) Case (-Mzz) Case (Mzz) Case (k) (k) (k) (k) (k) (k) in -k (in -k) 0/0/0 3-D 2.3 9 5.4 1 0.8 41 0.8 44 4.5 39 11.4 4 _ 40/0/0 3-A 5.4 l 2.3 10 0.8 53 0.8 56 4.5 51 11.4 3 oracm X -Loc Grid _ Description 0/0/0 3-D Podal Brace is attached to column. Reactions ARE included with fiame reactions. 40/0/0 3-A Postal Brace is attached to column. Reactions ARE included with fi-ame reactions. File: Fast -Track Version: 7.1c %/;7 Date: 12/6/2008 ty of Port Townsend Golf Course Building Reactions Package 6 December 2� , Mae: 7:38:01 AM Page: 22 of 26 Wall: 4, Frame at: 59/6/0 File: Fast -Track Version: 7.1 c Systcm 1.000 I A 1+ 1.0 CC + LO L., D -+ CG + L> �� 2 System 1.000 I.0 D + 1.0 CG + 1.0 <L D + CC A- <L 3 System 1.000 I.0 D + I.0 CG + I.0 ASL^ D + CG +ASL^ 4 System 1.000 LO D + I.0 CC + 1.0 ^ASL D + CC + ^ASL 7 System 1.000 LO D + LO CG + 1.0 S> D + CC + S> 8 System 1.000 I.0 D + I.0 CG +- 1.0 <S D + CG + <S 9 Systcm 1.000 LO D + 1.0 CG + 1.0 US I * D + CG + US I 10 System 1.000 I.0 D + I.0 CC + 1.0 *US I D + CC + *USI 11 System 1.000 I.OD+I.00C+1.0WI> D+CC+WI> 12 System 1.000 1.0 D + I.0 CG + 1.0 <W I D + CG i <W 1 13 System 1.000 1.0 D + 1.0 CC + 1.0 W2> D + CG + W2> 14 System 1.000 LO D + 1.0 CG r- 1.0 <W2 D + CC + <W2 15 System 1.000 0.600 D+0.600 CU + 1.0 W I > D+CU + WI> 16 System 1.000 0.600 D + 0.600 CU + 1.0 <W 1 D + CU + <W 1 17 System 1.000 0.600 D + 0.(i00 CU + 1.0 W2> D + CU + W2> 18 System 1.000 0.600D+0.600 CU+1.0<W2 D+CU+<W2 19 System 1.000 1.0 D + I.0 CC + 0.750 L + 0.750 W1> D + CG + L + W 1> 20 System 1.000 1.0 D + 1.0 CC, + 0.750 L + 0.750 <W1 D + CG + L + <W1 21 System 1.000 I.0D+I.0CC+0.750L+0.750W2> D+CG+L+W2> 22 System 1.000 1.0 D + 1.0 CC + 0.750 L + 0.750 <W2 D + CG + L + <W2 23 System 1.000 1.0 D + I.0 CG + 0.750 S + 0.750 W I> D + CC + S + W ]> 24 System 1.000 I.0D+I.0CC+0.750S+0.750<WI D+CC+S+<W1 25 System 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 W2> D + CC + S + W2> 26 System 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 <W2 D + CG + S + <W2 27 System 1.000 1.0 D + 1.0 CG + 0.910 E> + 0.700 EG+ D + C(; + E> + EG+ 28 System 1.000 1.0 D + 1.0 CC + 0.910 <E + 0.700 EG+ D + CG + <E + EGA 29 System 1.000 P.600 D + 0.600 CU + 0.910 E> + 0.700 EG - D + CU + E> + EG - 30 System 1.0000.600 D + 0.600 CU + 0.910 <E + 0.700 EG • D + CU + <E + EG - 31 System 1.000 I.0 D -+ 1.0 CG + 0.682 E> + 0.525 EG+ D + CG + E + EG+ 32 System 1.000 I.0 D + 1.0 CC + 0.682 <E + 0.525 EG+ D + CG + <E + EG+ 45 System Derived 1.000 I.0 D + I.0 CG + I.0 WPA I D + CC; t- WPA 1 46 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPA I D i CU + WPA I 47 System Derived 1.000 1.0 ) + I.0 (:G + 0.750 L + 0.750 WPA I D + CG + L+ WPA I 48 Syslem Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 WPA 1 D + CG + S + WPA I 49 System Derived 1.000 1.0 D+ 1.0 CG + 1.0 WPDI D+CG+WPDI 50 System Derived 1.000 0.600 D+0.600 CU+ 1.0 WPDI D+CU+ WPDI 51 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 W PD 1 D + CG + L + W PD 1 52 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPD I D + CC + S + W PD 1 53 System Derived 1.000 1.0 D + 1.0 CC + 1.0 WPA2 D + CG + WPA2 54 System Derived 1.000 .600 D + 0.600 CU + 1.0 WPA2 D + CU i- WPA2 55 System Derived 1.000 1.0 D + 1.0 CC + 0.750 L + 0.750 WPA2 D + CG + L + WPA2 56 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPA2 D + CG + S + WPA2 57 System Derived 1.000 1.0 D + 1.0 CC + 1.0 WPD2 D + CC + WPD2 58 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPD2 D + CU + WPD2 59 System Derived 1.000 LO D + 1.0 CC + 0.750 L + 0.750 WPD2 D + CC + L + WPD2 60 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S t- 0.750 WPD2 D + CG + S + WPD2 61 System Derived 1.000 1.0 D + 1.0 CC + 1.0 WPB I D + CC + WPB 1 62 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPB D + CU + WPB1 63 System Derived 1.000 1.0 D + LO CG + 0.750 L -r 0.750 WPB 1 D + CG + L + WPB 1 64 System Derived 1.000 1.0 D + 1.0 CG + 0.750 S + 0.750 WPB 1 D + CG + S + WPB 1 65 System Derived 1.000 1.0 D 1 1.0 CC + 1.0 WPC I D + CG + WPC 1 66 System Derived 1.000 0.600 D + 0.600 CU r- 1.0 W PC I D -+ CU + WPC I 67 System Derived 1.000 1.0 D + 1.0 CC + 0.750 L + 0.750 WPC I D + CG + L + WPC 1 68 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPC I D + CC + S + WPC 1 69 System Derived 1.000 1.0 D + 1.0 CG + LO WPB2 D + CG + WPB2 70 System Derived 1.000 0.600 D + 0.600 CU + 1.0 WPB2 D + CU + WPB2 71 System Derived 1.000 1.0 D + 1.0 CG + 0.750 L + 0.750 WPB2 D + CG + L + WPB2 72 System Derived 1.000 1.0 D + 1.0 CC + 0.750 S + 0.750 WPB2 D + CG + S + WPB2 73 System Derived 1.000 1.0 D + 1.0 CG + 1.0 WPC2 D + CG + WPC2 74 System Derived 1.000 .600 D + 0.600 CU + 1.0 WPC2 D + CU + WPC2 75 System Derived 1.000 I.0 D + 1.0 CC + 0.750 L+ 0.750 WPC2 D + CC + L + WPC2 File: Fast -Track Version: 7.1 c UPF Date: 12/6/2008 tJ' of fort Townsend Golf Course Building Reactions Package 6 December 2 _..ne: 7:38:01 AM Page: 23 of 26 76 System Derived 1.000 1.0 D + 1.0 CG + 0, 750 S +- 0.750 W PC2 D + ( G + S + W pC2 77 System Derived 1.000 I.0 D + 1.0 CG + 0.273 E> + 0.700 EG -i- + 0.9 ] 0 EB> D +- CG + E + EG+ -+ F.B> 78 System Derived 1.000 1.0 D + 1.0 CG + 0.910 E> + 0.700 EG+ + 0.273 EB> D E CG + E> + EG-+- + EB> 79 System Derived 1.000 I.0 D + 1.0 CG .1. 0.273 <E + 0.700 EG+ + 0.910 EB> D + CG + <E + EG+ + EB> 80 System Deri ved 1.000 I.0 D + 1.0 CG + 0.910 <E + 0.700 EG+ + 0, 273 EB> D + CG + <E + EG -t + EB> 81 System Deri ved 1.000 Q 600 D + 0.600 CU + 0.273 F> + 0.700 EG - + 0.910 EB> D + CU + E> + EG- + EB> 82 System Derived 1.000 0.600 D + 0.600 CU + 0.910 E> + 0.700 EG - + 0.273 EB> D + CU + E> + EG- + EB> 83 System Derived 1.000 0.600 D + 0.600 CU + 0.273 <E + 0.700 EG - + 0,910 EB> D + CU + <E + EG- i FB> 84 System Derived 1.000 0.600 D + 0.6U0 CU + 0.910 <E + 0.700 EG - + 0.273 EB> D + CU + <E + EG- + EB> 85 Syslem Derived 1.000 1.0 D + 1.0 CG + 0.205 F> + 0.525 EG+ + 0.682 EB> D CG + E> _E EG+ + EB> 86Syslem Derived 1.000 1.0 D + 1.0 CG + 0.682 E> + 0.525 EG+ + 0.205 EB> D + CG + E> + EG t + EB> 87 System Deri ved 1.000 1.0 D + 1.0 CG + 0.205 <E + 0.525 EG+ + 0.682 EB> D + CG + <E + EG+ + EB> 88 SDerived 1.000 1.0 D + 1.0 CG -i 0.682 <E + 0.525 EG+ + 0.205 EB> D +- CG + <E + EG+ + EB> 92 Systystemem Derived 1.000 1.0 D+ 1.0 CG +0.273 E> +0.700 EG+ 1-0.910 <EB D + CG + G + EG+ + <EB 93 System Derived 1.000 1.0 D+ 1.0 CG + 0.910 E> + 0.700 EG+ + 0.273 <EB D + CG + E> + EG+ + <EB 94 System Derived 1.000 1.0 D + 1.0 CG + 0.273 <E + 0.700 EG+ + 0.910 <EB D +- CO + <E + EG+ + <EB 95 System Derived 1.000 1.0 D+ 1.0 CG + 0.910 <E + 0.700 EG+ i 0.273 <EB D i- CG + <E + EG+ + <EB 96 System Deri ved 1.000 0.600 D + 0.600 CU + 0.273 E> + 0.700 EG - + 0.910 <EB D + CU + F> + EG- + <EB 97 SyslemDerived 1.000 0.600 D + 0.600 CU + 0.910 E> + 0.700 EG - + 0.273 <EB D + CU + F> + EG- + <EB 98 System Derived 1.000 0.600 D + 0.600 CU + 0.273 <E + 0.700 F. -G - + 0.910 <EB D + CU + <E + EG- + <EB 99 System Derived 1.000 0.600 D + 0.600 CU + 0.910 <E + 0.700 EG - + 0.273 <EB D + CU + <E + EG- + <EB 100 System Derived 1.000 1.0 D + 1.0 CG � 0.205 E> + 0.525 EG+ + 0.682 <EB D -+ CG + Fj + EG+ + <EB 101 System Derived 1.000 1.0 D + 1.0 CG + 0.682 E> + 0.525 EG+ i 0.205 <EB D + CG + F> +- EG+ + <EB 102 System Derived 1.000 1.0 D + 1.0 CG + 0.205 <E + 0.525 EG+ + 0.682 <EB D + CG + <E + EG+ + <EB 103 System Derived 1.000 1.0 D + 1.0 CG + 0.682 <E + 0.525 EG+ + 0.205 <EB U + CG + <F + FG+ + <Fn File: Fast -Track Version: 7.1c Date: 12/6/2008 )z,Mty of Port Townsend Golf Course Building Reactions Package 6 December 2Z _ _ _..ne: 7:38:01 AM Page: 24 of 26 Wall: 4, Frame at: 59/6/0 Frame ID: Post & Beam Frame Type:Post & Beam Q Values shown are resisting forces of the foundation. Reactions - Unfactored Load Tyne at Frame Cr- R-tinn• e Type X -Loc Grid] -Grid2 Base Plate W x L (in.) Base Plate Thickness (in.) Anchor Rod Qty/Diam. (in.) Column Base Elev. Exterior Column 0/0/0 4-D 8 x 10 0.375 2 -0.750 100'-1" Interior Column 8/6/0 4-C 8x 10 0.375 2 -0.750 100'-1" Interior Column 31/6/0 4-B 8x 10 0.375 2 -0.750 100'-1" Exterior Column 40/0/0 4-A 8x 10 0.375 2 -0.750 100'-1" LoadType Hx V Hx Hz V Hx fix VD 0.1 0.7 0.1CG 7FFnn - U 4.0 T-4.0 <L 4.0 - ASL^ rrn -0.9 3.2 -0.9 ^ASL Fnn 0.9 0.9 0.9 0.9 S> Frm -0.0 5.2 5.2 -0.0 <S Fnn 40 5.2 5.2 -0.0 USI* Fnn -0.6 3.0 6.0 -0.2 *Us 1 Fnn -0.2 6.0 3.0 -0.6 WI> Frm -0.3 - 1.3 -2.4 1.3 -1.9 -0.5 -0.2 <W I Fnn 0.5 -0.2 -1.2 -1.9 -1.2 -2.4 0.3 - W2> Frm -0.6 0.2 - -1.7 - -1.2 -0.3 -0.0 <W2 Fnn 0.3 -0.0 -1.2 -1.7 0.6 0.2 CU Fnn - - L Frm 4.0 4.0 S Frm - -0.0 5.2 5.2 - -0.0 F> Frm -0.0 0.0 - 0.0 - -0.0 - EG+ Frm - - 0.2 - 0.2 - <E Fnn 0.0 -0.0 - -0.0 - 0.0 EG- Fnn - - -0.2 - -0.2 - - WPAI Brc 0.4 -0.4 -1.4 -1.3 -0.4 -0.3 WPD1 Brc 0.4 -0.5 -1.9 -1.7 -0.4 -0.3 WPA2 Brc 0.2 -0.2 -0.7 -0.6 -0.2 -0.1 WPD2 Brc 0.2 -0.3 -1.2 -1.0 -0.2 -0.2 WPBI Brc 0.4 -0.3 -1.3 -1.4 -0.4 -0.4 WPCI Brc 0.4 -0.3 -1.7 -1.9 -0.4 -0.5 WPB2 Brc 0.2 -0.1 -0.6 -0.7 -0.2 -0.2 WPC2 Bra 0.2 -0.2 -1.0 -1.2 -0.2 -0.3 EB> Brc - - File: Fast -Track Version: 7.1c Date: 12/6/2008 t1' of Port Townsend Golf Course Building Reactions Package 6 December 2� Mile: 7:38:01 AM Page: 25 of 26 <EB I Bre I I I I I I I I I I I i Frame Reactions - Factored Load Cases at Frame Cross Section: 4 Note: All reactions based on 2nd order structural anal sis usin the Direct Analysis Method �_-- X -Loc 0/0/0 8/6/0I 'i 116/0 anmm �- GridI -Grid2 4-D 4-C 4-B 4-A Ld Description Hx V Hx Hz V Hx Hz V Hx V Cs (application factor not shown) (k) (k) (k) (k) (k) (k) k (k) (k) (k I D+CG+L> 0.1 4.8 4.8 0.1 2 D+CG+<L 0.1 4.8 4.8 0.1 3 D + CG + ASL^ -0.8 3.9 3.9 -0.8 4 D+CG+^ASL 0.9 1.6 1.6 0.9 7 D+CG+S> 0.0 5.9 5.9 0.0 8 D+CG+<S 0.0 5.9 5.9 0.0 9 D+CG+USI* -0,5 3.7 6.7 - -0.2 10 D+CG+*US] - -0.2 6.7 3.7 - -0.5 Il D+CG+WI> -0.3 0.1 1.3 -1.7 1.3 -1.2 -0.5 -0.2 12 D+CG+<WI 0.5 -0.2 -I.2 -1.2 -1.2 -1.7 0.3 0.1 13 D+CG+W2> -0.6 0.2 - -1.0 - -0.5 -0.3 0.0 14 D+CG+<W2 0.3 0.0 - -0.5 - -1.0 0.6 0.2 15 D+CU+WI> -0.3 0.0 1.3 -2.0 1.3 -1.5 -0.5 -0.2 16 D+CU+<W1 0.5 -0.2 -L2 -1.5 -1.2 -2.0 0.3 0.0 17 D+CU+ W2> -0.6 0.2 -1.3 - -0.8 -0.3 -0.0 18 D+CU+<W2 0.3 -0.0 -0.8 - -1.3 0.6 0.2 19 D+CG+L+WI> -0.3 0.1 1.0 1.9 1.0 2.3 -0.4 -0.1 20 D + CG + L + <W 1 0.4 -0.1 -0.9 2.3 -0.9 1.9 0.3 0.1 21 D i- CG + L + W2> -0.4 0.2 - 2.4 - 2.8 -0.2 0.0 22 D+CG+L+<W2 0.2 0.0 - 2.8 - 2.4 0.4 0.2 23 D + CG + S i W 1> -0.3 0.0 1.0 2.8 1.0 3.2 -0.4 -0.1 24 D+CG+S+<W1 0.4 -0.1 49 3.2 -0.9 2.8 0.3 0.0 25 D+CG+S+W2> -0.4 0.2 - 3.3 - 3.7 -0.2 0.0 26 D+CG+S+<W2 0.2 0.0 - 3.7 - 3.3 0.4 0.2 27 D+CG+F>+EG+ -0A 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 28 D + CG + <E + EG+ 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 29 D + CU i- 1> + EG- -0.0 0.0 0.0 0.3 0.0 0.3 -0.0 0.0 30 D+CU+<E+EG- 0.0 0.0 -0.0 0.3 -0.0 0.3 0.0 0.0 31 D + CG + Ej + EG+ -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 32 D + CG + <E + EG 1- 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 15 D + CG + W PA 1 0.4 -0.4 - -0.6 - -0.5 -0.4 -0.2 16 D+CU+WPAI 0.4 -0.4 -0,9 -0.8 -0.4 -0.3 17 D + CG A- L i- W PA 1 0.3 -0.2 2.7 2.8 -0.3 -0.2 18 D + CG + S + W PA l 0.3 -0.3 3.6 3.7 -0.3 -0.2 19 D+CG+WPDI 0.4 -0.5 -1.2 -L0 -0.4 -0.3 10 D+CU I- WPDI 0.4 -0.5 -1.5 -1.3 -0.4 -0.3 ;1 D+CG+L+WPDI 0.3 -0.3 2.3 2.5 -0.3 -0.2 ;2 D+CG+S+WPDI 0.3 -0.4 3.1 3.3 -0.3 -0.2 i3 D+CG+WPA2 0.2 -0.2 0.0 0.2 -0.2 -0.1 4 D+CU+WPA2 0.2 -0.2 -0.2 -0.1 -0.2 -0.1 5 D+CG+L+WPA2 0.1 -0.1 3.2 3.3 -0.1 -0.0 6 D+CG+S FWPA2 0.1 -0.1 4.1 4.2 -0.1 -0.1 7 D + CG + W PD2 0.2 -0.3 -0.5 -0.3 -0.2 -0.1 8 D + CU + W PD2 0.2 -0.3 -0.8 -0.6 -0.2 -0.1 9 D+CC; 11.+WPD2 0.1 -0.2 2.8 3.0 -0.1 -0.1 0 D + CG + S + W PD2 0.1 -0.2 3.7 3.8 -0.1 -0.1 I D + CG + WPB 1 0.4 -0.2 -0.5 -0.6 -0.4 -0.4 2 D + CU +- WPB 1 0.4 -0.3 -0.8 -0.9 44 -0.4 3 D+CG+L+WPB I 0.3 -0.2 2.8 2.7 -0.3 -0.2 1 D+CG+S+WPB I 0.3 -0.2 3.7 3.6 -0.3 -0.3 i D -i CG+WPC I 0.4 -0.3 -1.0 -1.2 -0.4 -0.5 i D+CU+WPCI 0.4 -0.3 -1.3 -1.5 -0.4 -0.5 7 D + CG + L + WPCI 0.3 -0.2 2.5 2.3 -0.3 -0.3 3 D + CG t S + WPCI 0.3 -0.2 3.3 3.1 -0.3 -0.4 > D + CG + WPB2 0.2 -0.1 0.2 0.0 -0.2 -0.2 File: Fast -Track Version: 7.1c Date: 12/6/2008 vkzmmmty of Ronk Townsend Cao f Course Building Reactions Package 6.December 2 _..ne: 7:38:01 AM Page: 26 of 26 Maximum Combined Reactions Summary with Factored Loads - Framing Note: All rea .f ions ha cert nn Ind --elN &n,t,,r,l ,I , � ; � „� � i6.. n:r .i A,,..I,,..:.. nn.,a,,.a X -Loc 7'D + CU f WPB2 0.2 -0.1 Load Htz In -0.1 Hrz Out Load -0.2 -0.2 -0.2 Load Mom ew 71 D+CG+L+WPB2 0.1 -0.0 (-Hx) 3.3 (Hx) Case 3.2 -0.1 -0.1 Case (-Vy) 72 D + CG + S + W PB2 0.1 -0.1 Case (Mzz) 4.2 4.1 -0.1 -0.1 (k 73 D + CG + W PC2 0.2 -0.1 (k) -0.3 (in -k) -0.5 -0.2 -0.3 4-D 0.6 74 D + CU + WPC2 0.2 -0.1 - - -0.6 0.8 3 -0.8 -0.2 -0.3 75 D + CG + L + W PC2 0.1 -0.1 - - 3.0 1.2 12 2.8 -0.1 -0.2 15 6.7 76 D + CG I- S + W PC2 0.1 -0.1 31/6/0 3.8 - - 3.7 -0.1 -0,2 12 1.3 77 D + CG + E> + EG+ + EB> -0.0 0.1 9 0.0 0.8 0.0 0.8 -0A 0.1 11 0.6 78 D + CG + E> + EG+ + EB> -0.0 0.1 0.0 0.8 0.9 0.0 0.8 -0.0 0.1 79 D+CGI <f+EG++EB> 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 80 D + CG + <E + EG+ + EB> 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 81 D + CU + E> + EG- + EB> -QO 0.0 0.0 0.3 0-0 0.3 -0.0 0.0 82 D+CU tG>+EG- +EB> -0.0 0.0 0.0 0.3 0.0 0.3 -0.0 0.0 83 D + CU + <E + EG- + EB> 0.0 0.0 -0.0 0.3 -0.0 0.3 0.0 OA 84 D+CU+<E+EG- +EB> 0.0 0.0 -0.0 0.3 -0.0 0.3 0.0 0.0 85 D + CG + F> + EG+ + EB> -0.0 0.1 0.0 0.8 OA 0.8 -0.0 0.1 86 D + CG + F> + EG+ + EB> -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 87 D + CG + <E + EG+ + EB> 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 88 D + CG I <E + EG+ + EB> 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 92 D + CG + E> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 93 D + CG + F-> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 94 D + CG + <E + EG+ + <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 95 D + CG + < E + EG+ + <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 96 D + CU + E> + EG- + <EB -0.0 0.0 0.0 0.3 0.0 0.3 -0.0 0.0. 97 D+CU+F>+EG- +<EB -0.0 0.0 0.0 0.3 0.0 0.3 -0.0 0.0 98 D + CU + <E + EG- + <EB 0.0 0.0 -0.0 0.3 -0.0 0.3 0.0 0.0 99 D + CU + <E + EG- + <EB 0.0 0.0 -0.0 0.3 -0.0 0.3 0.0 0.0 100 D F CG + E> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 101 D + CG + F> + EG+ + <EB -0.0 0.1 0.0 0.8 0.0 0.8 -0.0 0.1 102 D + CG + <E + EG++ <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 103 D + CG + <E + EG+ + <EB 0.0 0.1 -0.0 0.8 -0.0 0.8 0.0 0.1 Maximum Combined Reactions Summary with Factored Loads - Framing Note: All rea .f ions ha cert nn Ind --elN &n,t,,r,l ,I , � ; � „� � i6.. n:r .i A,,..I,,..:.. nn.,a,,.a X -Loc Grid Hrz lett Load tbz Right Load Htz In Load Hrz Out Load Uplift Load Vrt Down Load Mom ew Load Mom ccw Load (-Hx) Case (Hx) Case (-Hz) Case (Hz) Case (-Vy) Case (Vy) Case (-Mzz) Case (Mzz) Case (k) k (k k) (k) (k) (in -k) (in -k 0/0/0 4-D 0.6 13 0.5 12 - - - 0.8 3 0.9 4 8/6/0 4-C - - - - 1.2 12 1.3 Il 2.0 15 6.7 10 31/6/0 4-B - - - - 1.2 12 1.3 II 2.0 16 6.7 9 40/0/0 4-A 0.5 11 0.6 14 - - - 0.8 3 0.9 4 File: Fast -Track Version: 7.1c S— =--S§RM-R60F Arctic White Cool Regal White I Cool Regal White Classic Beige Cool Sierra Tan Tahoe Blue Zinc Gray Matte Black* Aval as trim color only Egyptian White Cool Colonial Red Regal Blue Leaf Green Patrician Bronze Terra Cotta Egyptian White Cool Colonial Red Regal Blue Leaf Green Patrician Bronze Unpainted Galvalurne* Also available for Panel Rib Roof VP's KXLTMT FINISH on Hot Dipped Galvanized & Galvalume® Panels This paint system combines ceramic pigmentation with polyvinylidene flouride for superior, long-lasting performance. PVDFfinishes are respected for their durability, resistance and color retention. Our KXL finishes are warranted for up to 20 years. Please note: 70% PVDF finishes meet both Kynar 500 and Hylar 5000 specifications. KYNAR11 is a registered trademark ofAtochem North America, Inc. HYLAR 5000® is a registered trademark ofAusimont USA, Inc. Galvalume® is a registered trade- mark of B.I.E.C. International, Inc. Note: All panels formed from light gauge metal may exhibit waviness, aiso known as "Oil Can- ning," commonly occurring in, but not restricted to, flat portions of a panel. This inherent characteris- tic is not a defect of material and is not cause for rejection Certification of Corp. of Engineers and AAMA 605.2 available upon request. VP's KXL paint finishes are formulated to meet owners and specifiers needs for "Cool Roof" applications including LEED certified and Title 24 projects. Please refer to the information chart for Solar Reflectivity Values, Emissivity ratings and calculated Solar Reflectivity Index. Low slope values apply to roof slopes 2:12 or lower; Steep slope applies to roof pitches greater than 2:12. Dry Film Thickness ASTM' D-1400, D-1005, D-1438 (NCCA' II -13,14,15) 0.2-0.25 mil primer', 0.7-0.8 mil top coat Specular Gloss (60) ASTM D-523 10-154 Pencil Hardness r r ASTM C-3363 (NCCA II -12) Eagle Turquoise Pencil HB -H Flexibility: T -Bend NCCA II -9 (No cracking or tape removal of film) 2T5 Mandrel ASTM D-522 (180° bend around 1/8" mandrel) No cracking Adhesion No effect ASTM D-3359 (NCCA II -5) Reverse Impact Cross Hatch No adhesion loss Reverse Impact 10 cycles' ASTM D-2749 (NCCA II -6) Impact in. per Ib. - 2000 X metal thickness for steel No cracking or adhesion loss' Abrasion Resistance No effect Falling Sand ASTM D-968 Litersto expose 5/32" of substrate transit 65 t 15 I/mil of film Based on topside to backside contact In transit Acceptable Mortar Resistance SRV AAMA' 605.2 - 24 Hour Pat Test No effect Detergent Resistance r r ASTM D-2248 - 3% Detergent, 100'F, 72 hrs. No effect Acid Pollutants Resistance 2000 Hours10 ASTM D-1308, Proc. 7.2 10% Muriatic Acid (15 min.) No effect 20% Sulfuric Acid (24 hrs.) No effect AAMA 605.2 Test 7.7 3.1- 70% Nitric Acid Vapors (30 min.) < 5 units color change', Kestemich SO2 CyclicTest (2 liters) 10 cycles' Alkali Resistance Meets or exceeds MCA Premium guidelines ASTM D-130810%,25% Sodium Hydroxide (1 hr.) No effect Salt Spray Resistance r r ASTM B-117 - 5% Salt Fog@ 95'F 1000 Hours' Humidity Resistance 2000 Hours10 ASTM D-2247 (100% Relative Humidity@ 95°F) Weatherometer Test ASTM G23 2000 Hours Color Change ASTM D-2244 < 2 units change' Chalking Resistance ASTM D-4214 Maximum #8 Exterior Weathering Florida Exposure ASTM D-2244 Color Meets or exceeds MCA Premium guidelines 5 years @ 45°S ASTM D-4214 Chalk Meets or exceeds MCA Premium guidelines AAMA 605.2 Film Erosion Less than 10% film loss 1. AMERICAN SOCIETY FOR TESTING AND MATERIALS. 4. HIGHER AND LOWER GLOSSES AVAILABLE UPON REQUEST. 7. HUNTER AE COLOR DIFFERENCE 2. NATIONAL COIL COATERS ASSOCIATION. 5. FRACTURING OF SUBSTRATE MAY RUPTURE FILM, 8. NO OBJECTIONABLE COLOR CHANGE 3. HIGHER FILM KXL COATINGS AND PERFORMANCE 6. AMERICAN ARCHITECTURAL MANUFACTURERS 9. LESS THAN 1/16" CREEP FROM SCRIBE. DATA AVAILABLE UPON REQUEST. ASSOCIATION. 10. NO BLISTERS. wi11 �• r r r r r r - VP Buildings Solar Reflective Analysis as of August 2007 LEED 2.2 LEED 2.2 Energy Star Energy Star ASTM - E-903, C-1549, C-1371, E-1980 Low Slope Steep Sloe Low Sloe Steep Slope VP's COLOR Results Radiative Results Minimum Minimum Minimum Minimum FINISH NAME SRV Emissivity SRI' .78 SRI .29 SRI .65 SRV .25 SRV Cool Regal White 72.20 0.86 88 YES YES YES YES Arctic White 64.10 0.87 77 NO YES NO YES Egyptian White 60.87 0.84 71 NO YES NO YES Classic Beige 53.10 0.86 61 NO YES NO YES Cool Siena Tan 49.10 0.86 56 NO YES NO YES Cool Zinc Gray 38.60 0.85 41 NO YES NO YES Terra Cotta 35.50 0.86 38 NO YES NO YES Cool Colonial Red 30.10 0.85 30 NO YES NO YES Forest Green 29.50 0.84 29 NO YES NO YES Regal Blue 26.80 0.85 26 NO NO NO YES Tahoe Blue 28.94 0.85 25 NO NO NO YES Leaf Green 25.52 0.84 23 NO NO NO YES Matte Black (Trim Only) 25.40 0.83 23 NO NO NO YES Patrician Bronze 25.10 0.84 23 NO NO NO YES Unpainted Galvalume 1 00.581 0.06 1 32 11 NO I YES I I NO I YES * Solar Reflectivity Index includes Solar Reflectivty Values and Emissivity calculations. The Ultimate Building Solution VP Buildings 3200 Players Club Circle Memphis, TN 38125 • �'�� �,,,,�p� �,r= +-\ O ` ASAR 1-800-238-3246 • vp.comnamti,o"semL�% 6021 Revised 1/08 APPROVED 9 . . . . . . . . . . . S . . .... 11 oll .......... L -Opp" wu,4W MIR m or tM 4o C\j 00,000�, N. are- \vj, 8-1,N tp, j, ------- Ai-ea dP d 1,0 C/ —Water — Waste Water — Storm Water I inch = 50 feel to lr—T)FA fo—.—