HomeMy WebLinkAbout2019-08-02 9th St Sidewalk Bid
BID DOCUMENT COVER SHEET
Project Name: 9 th
Street Sidewalk – Grant Street to Hancock Street
Description of Project: The Work includes the installation of an approximate 1,110 square feet of 6-ft
th
concrete side, located on the north side of 9 Street from Grant Street to Hancock Street. The Work
also includes installation of curb ramps, relocation of a mailbox; pavement patch in the roadway and
driveways.
The Bid Set Plans are included are included with these Contract Documents.
Bid Deadline:
Date: Friday,August 2, 2019
Time: 2:00pm
Place: City of Port Townsend, City Hall
City Clerk’s Office
250 Madison Street, Suite 2
Port Townsend, WA 98368
OR
via email to: stiffany@cityofpt.us
PROPOSAL SUBMITTED BY:
Name:
Address:
Telephone Number:
Email Address:
INSTRUCTIONS AND INFORMATION FOR BIDDERS
Receipt of Bids. Bids must be submitted on the forms provided herewith, all blanks of which must be
appropriately filled in. The bid must be submitted in a sealed envelope bearing on the outside the name
of the bidder, his/her address, the date submitted, and the name of the bid being submitted, if
forwarded by mail, the bid must be enclosed in another envelope addressed to the City of Port
Townsend. Alternatively, bids may be submitted electronically via email to stiffany@cityofpt.us
Withdrawal of Bids.Any bid may be withdrawn prior to the scheduled time for opening of bids or
authorized postponement thereof. No bid or proposal may be withdrawn after the time set for the bid
opening or before award of contract, unless said award is delayed for a period exceeding 45 days.
Late Bids. Any bid received after the time and date specified shall not be considered.
Bid Documents. Each bid must be accompanied by the following completed forms executed as required.
Bid Document Cover Sheet
Exhibit A - Bid Proposal
Exhibit B — Responsible Bidder’s Criteria
Proposals. All bids must be made on the required Bid Proposal and must include the required bid
documents. All blank spaces for bid prices must be filled in, in ink or typewritten, and the Bid Proposal
must be fully completed and executed when submitted. Only one copy of the bid is required.
Basis of Award. The City will select and award the Contract to the lowest responsive, responsible bidder.
If at the time this contract is to be awarded, the lowest acceptable Bid exceeds the funds then estimated
by the City as available, the City may reject all Bids or take such other action as best servers the City’s
interest.
Waiver or Rejection. The City may waive any informality or minor defect or reject any and all bids at any
time. Informalities in bids are matters of form rather than substance evident from the bid document, or
insignificant mistakes that can be waived or corrected without prejudice to other bidders; that is, the
effect on price, quantity, quality, delivery, or contractual conditions is negligible, and waiver of the
informality does not grant the bidder a competitive advantage.
Award of Contract. Contract award or bid rejection will occur within 45 calendar days of bid opening.
Execution of Contract. Within 30 calendar days after the award letter date, the successful bidder shall
return the signed Contract (Exhibit C) and required insurance & indemnification (Exhibit D) and bond(s)
as required by the Contract documents.
Bidder Familiarity with Requirements. Bidders must satisfy themselves of the accuracy of estimated
quantities, specifications and contract requirements, by personal examination of any plans,
specifications, all bid and contract documents, the site or sites or location of the proposed work, and by
any other examination or investigation which they may desire to make as to the nature of the contract
requirements or any difficulties to be encountered. The failure or omission of any bidder to do any of
the foregoing shall in no way relieve any bidder from any obligation in respect to his bid, and the bidder
th
Instructions and Information to Bidders Page 1 of 5 9 Street Sidewalk
shall not assert that there was a misunderstanding concerning the work or of the nature of the work to
be done, or of the requirements of the contract.
Attorneys-in-Fact. Attorneys-in-fact who sign a Performance Bond must file a certified and effective
dated copy of their Power of Attorney with the bond.
Notice to Proceed. A Notice to Proceed shall be issued within 90 days of bid opening. Should there be
reasons why the Notice to Proceed cannot be issued within such period, time may be extended by
mutual agreement between the City and the Contractor. If the Notice to Proceed has not been issued
within 90 days or within the period mutually agreed upon, the Contractor may terminate the Agreement
without further liability on the part of each party.
Qualifications of Bidders. The City may make such investigations as it deems necessary to determine the
ability of the bidder to perform the work, and the bidder shall furnish to the City all such information
and data for this purpose as the City may request. The City reserves the right to reject any bid if the
evidence is submitted by or an investigation of such bidder fails to satisfy the City that such bidder is
properly qualified to carry out obligations of the contract and to complete the work contemplated
therein.
Applicable Law. All applicable laws, ordinances and the rules and regulations of all authorities having
jurisdictions over the City or of the work to be performed by the contractor shall apply to the contract
throughout, and the bidder shall be required to be familiar with and comply with any such laws,
ordinances, rules and regulations.
Conditional or Qualified Bids. A conditional or qualified bid will not be accepted.
Corrections. Interpretations and Addenda. Any omissions, discrepancies, or need for interpretation
should be brought in writing, no later than 3 days before the bid opening date and sent to the attention
of the following: Sarah Tiffany at stiffany@cityofpt.us.
Written addenda to clarify questions, which should arise, will then be issued if appropriate. All
interpretation or explanation of the bid contract documents shall be in the form of an addendum, and
no oral statements by the City or any other officer, employee or other agent or representative of the
City shall in any way modify the contract or bid documents, whether made before or after letting the
contract.
Insurance Requirements. All bidders will be required, if they are awarded the contract, to provide
evidence of insurance in accordance with the requirements set forth in Exhibit D. Bidders should pay
special note to the insurance requirements and insurance documents required.
Payment. Payment shall be made monthly upon submittal of a pay request for work performed to date
as determined by the City. Failure to perform any of the obligations under the contract by Contractor
may be decreed by the City to be adequate reason for withholding any payments until compliance is
achieved, including withholding amounts from any payment based on substantial completion to cover
the City’s cost to complete any punch list items.
Retainage. Pursuant to Chapter 60.28 RCW, a sum of 5-percent of the monies earned by the Contractor
will be retained from pay request. The retainage can be either retained in a fund by the City or
deposited by the City in an escrow account in a bank, mutual saving bank, or saving and loan
th
Instructions and Information to Bidders Page 2 of 5 9 Street Sidewalk
association. At the time the contract is executed the Contractor shall designated the retainage option
desired.
Performance Bond. A Performance Bond in the amount of 100-percent of the contract price, with a
corporate surety, approved by the City, will be required for the faithful performance of the contract.
Payment Bond. A Payment Bond in the amount of 100-percent of the contract price, with a corporate
surety, approved by the City, will be required for payment of workers and suppliers.
Retainage In Lieu of Bonds. On contracts under $150,000, the Contractor may request that the City
retain 10-percent of the contract amount in lieu of obtaining a Performance Bond and Payment Bond.
Requirements. Bidder must be on the MRSC Small Works Roster and possess a City of Port Townsend
business license prior to contract award.
Lowest Responsive Responsible Bidder. It is the intent of Owner to award a contract to the lowest
responsive and responsible bidder. In accordance with RCW 39.04.350. (SHB 2010/Chapter 133, Laws of
Washington 2007), before award, the bidder must meet the following bidder responsibility criteria to be
considered a responsible bidder. The bidder may be required to provide the City documentation
demonstrating compliance with the criteria. The bidder must:
(a) At the time of bid submittal, have a certificate of registration in compliance with chapter
18.27 RCW;
(b) Have a current state unified business identifier number;
(c) If applicable, have industrial insurance coverage for the bidder's employees working in
Washington as required in Title 51 RCW; an employment security department number as required in
Title 50 RCW; and a state excise tax registration number as required in Title 82 RCW;
(d) Not be disqualified from bidding on any public works contract under RCW 39.06.010 or
39.12.065(3);
(e) If bidding on a public works project subject to the apprenticeship utilization requirements in
RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship and
training council for working apprentices out of ratio, without appropriate supervision, or outside their
approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for
the one-year period immediately preceding the date of the bid solicitation;
(f) Have received training on the requirements related to public works and prevailing wage
under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be trained
on these requirements. The training must be provided by the department of labor and industries or by a
training provider whose curriculum is approved by the department. The department, in consultation
with the prevailing wage advisory committee, must determine the length of the training. Bidders that
have completed three or more public works projects and have had a valid business license in
Washington for three or more years are exempt from this subsection. The department of labor and
industries must keep records of entities that have satisfied the training requirement or are exempt and
make the records available on its web site. Responsible parties may rely on the records made available
by the department regarding satisfaction of the training requirement or exemption; and
th
Instructions and Information to Bidders Page 3 of 5 9 Street Sidewalk
(g) Within the three-year period immediately preceding the date of the bid solicitation, not have
been determined by a final and binding citation and notice of assessment issued by the department of
labor and industries or through a civil judgment entered by a court of limited or general jurisdiction to
have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52
RCW.
Pursuant to Section 3 of SHB 2010/Chapter 133, Laws of Washington 2007, the bidder who is awarded
the contract must verify responsibility criteria as listed in 1 - 4 above for each first tier subcontractor,
and a subcontractor of any tier that hires other subcontractors must verify responsibility criteria for
each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract
execution, meets the responsibility listed in 1 - 4 above and possesses an electrical contractor license, if
required by chapter 19.28 RCW, or an elevator contractor license, if required by chapter 70.87 RCW.
This verification requirement, as well as the responsibility criteria, must be included in the project
contract and in each subcontract of every tier.
Sales Tax/Use Tax.The Washington State Department of Revenue has issued special rules on the State
sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The Contractor should
contact the Washington State Department of Revenue for answers to questions in this area. The City
will not adjust its payment if the Contractor bases a bid on a misunderstood tax liability.
The Contractor shall include all Contractor-paid taxes in the unit bid prices or other contract amounts.
In some cases, however, state retail sales tax will not be included. Section 1-07.2(2) describes this
exception.
The City will pay the retained percentage only if the Contractor has obtained from the Washington State
Department of Revenue a certificate showing that all contract-related taxes have been paid (RCW
60.28.051). The City may deduct from its payments to the Contractor any amount the Contractor may
owe the Washington State Department of Revenue, whether the amount owed relates to this contract
or not. Any amount so deducted will be paid into the proper State fund.
State Sales Tax — Rule 171
WAC 458-20-171, and its related rules, apply to building, repairing, or improving streets, roads, etc.,
which are owned by a municipal corporation, or political subdivision of the state, or by the United
States, and which are used primarily for foot or vehicular traffic. This includes storm or combined
sewer systems within and included as a part of the street or road drainage system and power lines
when such are part of the roadway lighting system. For work performed in such cases, the
Contractor shall include Washington State Retail Sales Taxes in the various unit bid item prices, or
other contract amounts, including those that the Contractor pays on the purchase of the materials,
equipment, or supplies used or consumed in doing the work.
State Sales Tax — Rule 170
WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or existing
buildings, or other structures, upon real property. This includes, but is not limited to, the
construction of streets, roads, highways, etc., owned by the state of Washington; water mains and
their appurtenances; sanitary sewers and sewage disposal systems unless such sewers and disposal
systems are within, and a part of, a street or road drainage system; telephone, telegraph, electrical
th
Instructions and Information to Bidders Page 4 of 5 9 Street Sidewalk
power distribution lines, or other conduits or lines in or above streets or roads, unless such power
lines become a part of a street or road lighting system; and installing or attaching of any article of
tangible personal property in or to real property, whether or not such personal property becomes a
part of the realty by virtue of installation.
For work performed in such cases, the Contractor shall collect from the City, retail sales tax on the
full contract price. The City will automatically add this sales tax to each payment to the Contractor.
For this reason, the Contractor shall not include the retail sales tax in the unit bid item prices, or in
any other contract amount subject to Rule 170, with the following exception.
Exception: The City will not add in sales tax for a payment the Contractor or a subcontractor makes
on the purchase or rental of tools, machinery, equipment, or consumable supplies not integrated
into the project. Such sales taxes shall be included in the unit bid item prices or in any other
contract amount.
Services
The Contractor shall not collect retail sales tax from the City on any contract wholly for professional
or other services (as defined in Washington State Department of Revenue Rules 138 and 244).
All other federal, state, and local sales use or other taxes as required by federal, state, or local laws
shall be included in the unit prices, lump sum prices, or other prices in the Proposal.
Compliance with Labor Standards and Rate of Wage Requirements. The work under this Contract is to
be paid for by public funds; therefore, the Contractor shall comply with Washington State prevailing
wage laws (Chapter 39.04, 39.12, 43.19, and 49.38 RCW).
If awarded the project, the contractor and each subcontractor shall complete or have on file a current
“Statement of Intent to Pay Prevailing Wages” (Form L&I Number F700-029-000) before payment will be
made for work performed. An “Affidavit of Wages Paid” (Form L&I Number F700-007-000) shall be
required upon final acceptance of the public works project by the City. These forms are available from
Washington State Department of Labor & Industries and can be filed electronically at:
http://www.lni.wa.gov/TradesLicensing/PrevWage/IntentAffidavits/default.asp
The applicable prevailing wages for this project have an effective date of 7/11/2019 and are available
Electronically from Washington State Department of Labor & Industries and can be found at:
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx
All work will be conducted within Jefferson County. A copy of the effective wage reports is available in
the Public Works office located at 250 Madison Street, Suite 2R, Port Townsend, WA 98368. A copy will
be emailed or mailed to interested contractors upon request.
The City does not guarantee that labor can be procured for the minimum wages shown on the
referenced schedules. The rates of wages listed are minimum only, below which the Contractor cannot
pay, and they do not constitute a representation that labor can be procured for the minimum listed.
th
Instructions and Information to Bidders Page 5 of 5 9 Street Sidewalk
EXHIBIT A
BID PROPOSAL
Proposal of ______________________________________________________________________
(Hereinafter called "Bidder"), organized and existing under the laws of the State of, doing business as
_____________________________________________________________________________
To the City of Port Townsend ("City"):
In compliance with your Invitation for Bids, Bidder hereby proposes to perform all work for the following
Project or Contract: 9 th Street Sidewalk – Grant Street to Hancock Street in strict accordance with the
Contract Documents, within the time set forth therein, and at the prices stated below.
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid each party thereto certifies as to
his own organization, that this Bid has been arrived at independently without consultation, communication
or agreement as to any matter relating to this Bid with any other Bidder or with any other competitor.
Bidder hereby agrees to commence work under this Contract on or before a date to be specified in the
Notice to Proceed.
Bidder agrees to perform all work as described in the Contract Documents and as shown on the drawings
th
for the: 9 Street Sidewalk – Grant Street to Hancock Street
Bid
WSDOT Std. Est.
Item Description Unit Unit Price Total
Item Qty.
No.
PREPARATION
1 1-09.7 Mobilization 1 LS $ $
Clearing and
2 2-01 1 LS $ $
Grubbing
Removal of
3 2-02 Structures and 1 LS $ $
Obstructions
Removing
4 SPEC 2-02.3 Cement Conc. 7 SY $ $
Sidewalk
Removing
5 SPEC 2-02.3 Asphalt Conc. 23 SY $ $
Pavement
6 SPEC 2-02.3 Sawcutting 120 LF $ $
GRADING
Roadway
7 2-03 Excavation Incl. 128 CY $ $
Haul
Gravel Borrow
8 2-03 24 CY $ $
Incl. Haul
th
EXHIBIT A – Bid Proposal Page 1 of 4 9 Street Sidewalk
EXHIBIT A
SURFACING
Crushed
94-04Surfacing Top 100TON$$
Course
HOT MIX ASPHALT
Commercial
10 5-04 12 TN $ $
HMA
EROSION CONTROL AND ROADSIDE PLANTING
11 8-01 Inlet Protection 1 EA $ $
12 8-01 Wattle 100 LF $ $
Erosion /Water
13 8-01 Pollution 1 CALC $ 1,000.00 $ 1,000.00
Control
Seeding,
14 8-01 Fertilizing & 0.1 ACRE $ $
Mulching
15 SPEC Topsoil Type A 97 CY $ $
16 8-02 Topsoil Type B 40 CY $ $
TRAFFIC
Cement Conc.
17 8-04 Traffic Curb and 71 LF $ $
Gutter
Project
18 1-10 Temporary 1 LS $ $
Traffic Control
OTHER ITEMS
Cement Conc.
29 8-14 479 SY $ $
Sidewalk
Cement Conc.
20 8-06 Driveway 78 SY $ $
Entrance Type 1
Detectable
21 8-14 Warning 96 SF $ $
Surface
22 1-04 Minor Change 1 CALC $ 1,000.00 $ 1,000.00
Roadside
23 2-01 1 CALC $ 1,000.00 $ 1,000.00
Cleanup
Mailbox
24 8-18 1 EA $ $
Support Type 2
Permanent
25 8-21 1 LS $ $
Signing
th
EXHIBIT A – Bid Proposal Page 2 of 4 9 Street Sidewalk
EXHIBIT A
$
Subtotal Bid Amount:
$
Sales Tax 9%:
$
Total Bid:
Receipt is hereby acknowledged of Addendum(s) No(s): ____________________________ \[NOTE: write
“none” if there were no addendums.\]
Certification of Compliance with Wage Payment Statutes.By signing this proposal, the bidder
hereby certifies that, within the three-year period immediately preceding the date of the bid solicitation,
not have been determined by a final and binding citation and notice of assessment issued by the
department of labor and industries or through a civil judgment entered by a court of limited or general
jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48,
or 49.52 RCW.
Non-collusion Declaration. By signing this proposal, the bidder certifies that:
1.That the undersigned person(s), firm, association or corporation has (have) not, either directly
or indirectly, entered into any agreement, participated in any collusion, or otherwise taken an
action in restraint of free competitive bidding in connection with the project or which this
proposal is submitted.
2.That by signing the signature page of this proposal, I am deemed to have signed and have
agreed to the provisions of this declaration.
I certify under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
1.If the Bidder is a sole proprietorship, so state and give the name under which business is transacted.
2.If the Bidder is a co-partnership, so state, giving firm name under which business is transacted.
3.If the Bidder is a corporation, this Proposal must be executed by its duly authorized officials.
Bidder's Firm Name Date
By: _________________________________
Authorized Signature (required)
th
EXHIBIT A – Bid Proposal Page 3 of 4 9 Street Sidewalk
EXHIBIT A
Bidder’s address:
Telephone Number:
Email Address:
STATE CERTIFICATE OFREGISTRATION NO.
STATE UNIFIED BUSINESS IDENTIFIER NO.
END OF TEXT
th
EXHIBIT A – Bid Proposal Page 4 of 4 9 Street Sidewalk
EXHIBIT B
MANDATORY RESPONSIBLE BIDDER’S CRITERIA
1. State Certification of Registration Number
2. State Unified Business Identifier Number
3a. Do you have industrial coverage?
Yes No N/A
3b. Employment Security Department Number
3c. State Excise Tax Registration Number
4. Is your firm currently disqualified from bidding?
Yes No
5.Hasyour firm been found in violation of a
Washington State Apprenticeship and Training YesNoN/A
Counsel requirement for the preceding year?
6. Has your firm received training on requirements
relating to public works and prevailing wage Yes No
under Chapter 39.12 RCW?
7. Has your firm received a citation or assessment
for a willful violation as defined in RCW
Yes No
49.48.082 any provision of chapter 49.46, 49.48
or 49.52 RCWin the preceding 3 years?
th
EXHIBIT B – Mandatory Bidder Criteria Page 1 of 1 9 Street Sidewalk
EXHIBIT C
SMALL WORKS CONTRACT
Between: City of Port Townsend and __________________________________________
For: 9th Street Sidewalk – Grant Street to Hancock Street
Commencing: _____________________
Terminating: ______________________
Amount: $________________________
THIS AGREEMENT, made and entered __________________________________, 20___ by and between
the CITY OF PORT TOWNSEND, a Washington municipal corporation (the “City”) and
____________________________________, a ______________________________________
corporation/partnership, (the “Contractor”).
RECITALS
th
WHEREAS, the City is desirous of contracting with Contractor for 9Street Sidewalk – Grant Street to
Hancock Street; and
WHEREAS, pursuant to the invitation of the Owner extended through the Port Townsend Public Works
Small Works Roster, the Contractor did, in accordance therewith, file with the Owner a proposal
containing an offer which was invited by said notice; and
WHEREAS, the Owner has heretofore determined that said offer was the lowest responsive and
responsible bid submitted;
NOW THEREFORE, in consideration of the terms and conditions contained in this Contract, the parties
covenant and agree as follows:
1. Scope of Work to be Accomplished. The Contractor shall do all the work, including all
th
construction and services, and furnish all tools, materials and equipment for the 9Street Sidewalk –
Grant Street to Hancock Street in accordance with and as described in the attached contract documents
and shall perform any alterations in or additions to the work as provided under this Contract. The
Contractor shall provide and bear the expense of all equipment, work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work
provided for in this Contract, unless otherwise specified in the attached Contract Documents.
2. Contract Documents. The Contract between the parties includes this Contract, along with the
attached Bid Documents, Bid Set Plans, Bid Proposal (Exhibit A), Mandatory Responsible Bidder’s
Criteria (Exhibit B), Performance Bond (Exhibit E), Payment Bond (Exhibit F) and Retainage, Insurance
and Indemnity Requirements (Exhibit D), which are hereby incorporated by reference and made a part
of this Contract as if set forth in full, and shall be referred to herein as the “Contract Documents.”
th
Exhibit C – Small Works Contract Page 1 of 4 9 Street Sidewalk
EXHIBIT C
3. City Responsibility/Payment. The City hereby promises and agrees with the Contractor to
employ and does employ the Contractor to provide the materials to do and cause to be done the above
described Work and to complete and finish the same according to the attached plans and specifications,
and the terms and conditions contained in this Contract. The City agrees to pay the Contractor for the
actual work completed according to the Scope of Work, the sum of $_________________________.
4. Time of Performance/Liquidated Damages. Work shall start within ______ days of execution of
this Contract and shall be physically complete within 30 calendar days from the Notice to Proceed. If the
work is not completed within the time specified, the Contractor agrees to pay to the City the sum of
$100.00 for each and every day the work remains uncompleted after expiration of the specified time, as
liquidated damages.
5. Warranties/Guaranty.
5.1. The Contractor warrants to the City that any materials and equipment furnished under this
Contract will be new and of good quality unless otherwise required or permitted by the Contract
Documents, that the Work will be free from defects not inherent in the quality required or permitted,
and that the Work will conform with the requirements of the Contract Documents. Work not
conforming to these requirements, including substitutions not properly approved and authorized, may
be considered defective.
5.2. The Contractor for him/herself, and for his/her heirs, executors, administrators, successors and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part
of the Contractor. Contractor shall be responsible for and shall indemnify and hold the City harmless
from any damage or expense by reason of failure of performance as specified in the Contract
Documents or from defects appearing or developing in the material or workmanship provided or
performed under the Contract Documents within a period of one year after its acceptance thereof by
the City.
6. Change Orders. Minor changes in the Work, in the amount of the Contract sum, or in the time
for completion of the Work may be accomplished only by a written document, signed by the Contractor
and City Manager or their designee on behalf of the City. Once effective, the Contractor shall proceed
promptly with the Work as modified, unless otherwise provided in the change order.
7. Insurance. The Contractor shall procure and maintain for the duration of the Contract, insurance
against claims for injuries to persons or damage to property which may arise from or in connection with
the performance of the work hereunder by the Contractor, its agents, representatives, employees or
subcontractors. The Contractor shall provide a Certificate of Insurance evidencing per Exhibit D
Insurance and Indemnity Requirements for Construction Projects.
8. Performance Bond/Statutory Retainage/Prevailing Wages.
8.1. Performance Bond. A Performance Bond in the amount of 100-percent of the contract price,
with a corporate surety, approved by the City, will be required for the faithful performance of the
contract.
th
Exhibit C – Small Works Contract Page 2 of 4 9 Street Sidewalk
EXHIBIT C
8.2 Payment Bond. A Payment Bond in the amount of 100-percent of the contract price, with a
corporate surety, approved by the City, will be required for payment of workers and suppliers.
8.3 Retainage. Pursuant to chapter 60.28 RCW, a sum of 5-percent of the monies earned by the
Contractor will be retained from pay request. The retainage can be either retained in a fund by the City
or deposited by the City in an escrow account in a bank, mutual saving bank, or saving and loan
association. At the time the contract is executed the Contractor shall designated the retainage option
desired.
8.4. Retainage In Lieu of Bonds. On contracts under $150,000, the Contractor may request that the
City retain 10-percent of the contract amount in lieu of obtaining a Performance Bond and Payment
Bond.
8.5. Prevailing Wages. Pursuant to RCW 39.12.040, prior to payment by the City, the Contractor shall
complete and receive an approved “Statement of Intent to Pay Prevailing Wages,” for itself and every
subcontractor through the Department of Labor and Industries. Following the final acceptance of the
project, the Contractor must submit, on behalf of itself and each and every subcontractor, an “Affidavit
of Wages Paid” before the funds retained under subsection 8.3 of this Contract are released to the
Contractor.
9. City Business License Required. The Contractor must obtain a City of Port Townsend Business
License before any payment under the Contract can be made.
10. Assignment/Delegation. The Contractor shall not assign this Contract nor delegate any duties
hereunder without prior written consent of the City, which consent may be withheld by the City in its
sole subjective discretion for any cause whatsoever.
11. Applicable Law, Venue. This Contract shall be subject to, and the Contractor shall at all times
comply with, all applicable state and local laws, regulations, rules and provisions of the Port Townsend
Municipal Code and ordinances of the City of Port Townsend. Venue for any action hereunder shall be in
Jefferson County.
12. Termination. This Contract can be terminated by either party upon default in performance of
the other party, if such default is not cured within 10 days of notice thereof, and upon notification of
intent to terminate this Contract in writing 30 days prior to the date of termination. In case of default,
the non-defaulting party shall have any and all remedies available to it in law or equity.
13. Notices. Any notice required by this Contract may be delivered personally or mailed, certified
with return receipt requested. If mailed, notice shall be deemed given upon the first business day after
the date of the postmark. Notices shall be delivered or mailed to the following:
TO CITY: TO CONTRACTOR:
City of Port Townsend Public Works Department
Attn: Samantha Harper, P.E.
250 MadisonStreet Suite 2R
Port Townsend, WA 98368
(360) 344-4605
sharper@cityofpt.us
th
Exhibit C – Small Works Contract Page 3 of 4 9 Street Sidewalk
EXHIBIT C
14. Independent Contractor. For all purposes, the Contractor shall be deemed an independent
contractor and shall not be deemed an employee of the City.
15. Waiver. Waiver by the City of any breach of any term or condition of this Contract shall not be
construed as a waiver of any other breach.
16. Attorney’s Fees. In the event any action is brought by either party to enforce the terms of this
Contract or for breach of this Contract by the other party, the parties agree that the non- prevailing
party shall pay to the prevailing party reasonable attorney’s fees and costs and disbursements incurred
by such party.
17. Entire Contract. This Contract, together with all Bid Documents referred to herein, constitutes
the entire agreement between the parties hereto.
18. Binding Effect. This Contract shall be binding upon the parties, their heirs, personal
representatives, successors and assigns.
19. Modification. No modification of this Contract shall be of any force or effect, unless in writing
signed by the parties.
20. Corporate Authority. Each individual executing this Contract is duly authorized to execute and
deliver this Contract on behalf of the corporation in accordance with a duly adopted resolution of the
Board of Directors of the corporation, or in accordance with the By Laws of said corporation, and that
this Contract is binding upon the corporation in accordance with its terms. A certified copy of such
resolution shall be furnished to the City within ten (10) days of the date of the execution of this
Contract.
IN WITNESS WHEREOF, the parties have caused this Contract to be duly executed as of the day and year
first written above.
CITY OF PORT TOWNSEND {Contractor}
By: By:
Nora Mitchell, Interim City Manager
Date: Date:
Approved as to form:
Heidi Greenwood, City Attorney
th