Loading...
HomeMy WebLinkAboutBid TabCompany Interwest Construction, Inc Address 170 Business Park Loop City Sequim, WA 98382 ITEM NO. WSDOT STD ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL SCHEDULE A - BASE BID PREPARATION 1 1-09.7 Mobilization 1 LS 40,000.00$ 40,000.00$ 2 2-01 Clearing And Grubbing 1 LS 2,050.00$ 2,050.00$ 3 2-02 Removal Of Structure And Obstruction 1 LS 15,000.00$ 15,000.00$ 4 2-02 Removing Miscellaneous Traffic Item 1 LS 1,500.00$ 1,500.00$ GRADING 5 2-03 Roadway Excavation Incl. Haul 854 CY 28.00$ 23,912.00$ 6 2-03 Select Borrow Incl. Haul 150 CY 25.00$ 3,750.00$ 7 2-03 Embankment Compaction 176 CY 13.00$ 2,288.00$ STORM SEWER 8 7-04 Schedule A Storm Sewer Pipe 12 In. Diam. 13 LF 70.00$ 910.00$ 9 7-05 Catch Basin Type 1 3 EACH 1,550.00$ 4,650.00$ SANITARY SEWER 12 7-17 Ductile Iron Sewer Pipe 8 In. Diam. 48 LF 65.00$ 3,120.00$ 13 7-17 Ductile Iron Sewer Pipe 12 In. Diam. 38 LF 79.00$ 3,002.00$ STRUCTURES 15 2-09 Structure Excavation Class A Incl. Haul 5 CY 95.00$ 475.00$ 16 6-02 St. Reinf. Bar 363 LB 2.50$ 907.50$ 17 6-02 Conc. Class 4500 8 CY 750.00$ 6,000.00$ SURFACING 18 4-04 Crushed Surfacing Top Course 300 TON 35.00$ 10,500.00$ HOT MIX ASPHALT 19 5-04 HMA Cl. 1/2 In. Pg 58V-22 218 TON 140.00$ 30,520.00$ 20 5-04 Planing Bituminous Pavement 36 SY 140.00$ 5,040.00$ EROSION CONTROL AND ROADSIDE PLANTING 22 8-02 PSIPE Parrotia Persica 'Vanessa' (12'-14' Ht.) 1 EACH 267.00$ 267.00$ 23 8-02 PSIPE Cistus X Purpureus (2 Gal) 26 EACH 29.00$ 754.00$ 25 8-02 PSIPE Myrica Californica (2 Gal) 8 EACH 39.00$ 312.00$ 26 8-02 PSIPE Rosmarinus Officinalis 'Tuscan Blue' (2 Gal) 41 EACH 29.00$ 1,189.00$ SCHEDULE A - BASE B 28 8-02 PSIPE Berberis Thunbergii 'Crimson Pygmy' (1 Gal) 158 EACH 9.00$ 1,422.00$ 29 8-02 PSIPE Cornus Sericea 'Kelseyi' (1 Gal) 71 EACH 9.00$ 639.00$ 30 8-02 PSIPE Cornus Stolonifera 'Arctic Fire' (2 Gal) 26 EACH 29.00$ 754.00$ 31 8-02 PSIPE Rosa Rugosa 'Frau Dagmar Hastrup' (2 Gal) 16 EACH 43.00$ 688.00$ 32 8-02 PSIPE Symphoricarpos Albus (2 Gal) 14 EACH 20.00$ 280.00$ 33 8-02 PSIPE Achillia Millefolium Cerise Queen (1 Gal) 30 EACH 9.00$ 270.00$ 34 8-02 PSIPE Acorus Gramineus 'Ogon' (1 Gal) 47 EACH 9.00$ 423.00$ 35 8-02 PSIPE Calamagrostis X Acutiflora 'Karl Foerster' (1 Gal) 78 EACH 7.00$ 546.00$ 36 8-02 PSIPE Deschampsia Cespitosa 'Goldtau' (1 Gal) 87 EACH 10.00$ 870.00$ 37 8-02 PSIPE Echinops Ritro 'Veitch'S Blue' (1 Gal) 9 EACH 16.00$ 144.00$ 38 8-02 PSIPE Helictotrichon Sempervirens (1 Gal) 68 EACH 9.00$ 612.00$ 39 8-02 PSIPE Juncus Patens 'Elk Blue' (1 Gal) 91 EACH 10.00$ 910.00$ 40 8-02 PSIPE Lavandula X Intermedia 'Grosso' (1 Gal) 25 EACH 10.00$ 250.00$ 41 8-02 PSIPE Liatris Spicata (1 Gal) 5 EACH 10.00$ 50.00$ 42 8-02 PSIPE Mahonia Nervosa (1 Gal) 6 EACH 13.00$ 78.00$ 43 8-02 PSIPE Mahonia Repens (1 Gal) 50 EACH 13.00$ 650.00$ 44 8-02 PSIPE Miscanthus Sinensis 'Morning Light' (1 Gal) 7 EACH 10.00$ 70.00$ 45 8-02 PSIPE Pennisetum Alopecuroides 'Hameln' (1 Gal) 52 EACH 7.00$ 364.00$ 46 8-02 PSIPE Pennisetum Alopecuroides 'Little Bunny' (1 Gal) 264 EACH 9.00$ 2,376.00$ 47 8-02 PSIPE Perovskia Atriplicifolia 'Blue Jean Baby' (1 Gal) 22 EACH 10.00$ 220.00$ 49 8-02 PSIPE Salvia Nemorosa 'Caradonna' (1 Gal) 4 EACH 13.00$ 52.00$ 50 8-02 PSIPE Sedum Spectabile 'Autumn Joy' (1 Gal) 2 EACH 9.00$ 18.00$ 51 8-02 PSIPE Sesleria Autumnalis (1 Gal) 297 EACH 10.00$ 2,970.00$ 52 8-02 PSIPE Allium 'Globemaster (Bulb) 48 EACH 24.00$ 1,152.00$ SCHEDULE A - BASE B 53 8-02 PSIPE Allium Sphaerocephalon (Bulb) 594 EACH 2.00$ 1,188.00$ 54 8-02 Topsoil Type A1 116 CY 74.00$ 8,584.00$ 55 8-02 Topsoil Type A2 111 CY 74.00$ 8,214.00$ 56 8-02 Organic Compost Mulch 26 CY 57.00$ 1,482.00$ 58 8-02 Seeded Lawn Installation - Eco Lawn 627 SY 7.00$ 4,389.00$ 59 8-02 Seeded Lawn Installation - Rain Garden 45 SY 9.00$ 405.00$ 60 9-03 Streambed Cobbles 6 Inch 0.5 TON 230.00$ 115.00$ 61 8-01 Erosion Control And Water Pollution Prevention 1 LS 3,300.00$ 3,300.00$ TRAFFIC 62 8-04 Cement Conc. Traffic Curb And Gutter 461 LF 41.00$ 18,901.00$ 63 8-04 Cement Conc. Traffic Curb 62 LF 52.00$ 3,224.00$ 64 8-04 2" Cement Conc. Traffic Curb 91 LF 48.00$ 4,368.00$ 65 8-04 C.I.P. Concrete Flush Curb 70 LF 50.00$ 3,500.00$ 67 8-21 Permanent Signing 1 LS 3,350.00$ 3,350.00$ 68 1-10 Project Temporary Traffic Control 1 LS 27,000.00$ 27,000.00$ 69 8-22 Plastic Access Parking Space Symbol With Background 2 EACH 450.00$ 900.00$ 70 8-22 Plastic Crosswalk Line 176 SF 19.00$ 3,344.00$ 71 8-22 Plastic Stop Line 32 LF 80.00$ 2,560.00$ OTHER ITEMS 72 8-14 Cement Conc. Sidewalk 603 SY 62.00$ 37,386.00$ 74 8-14 Cement Conc. Curb Ramp Type Perpendicular A 2 EACH 4,200.00$ 8,400.00$ 75 8-14 Cement Conc. Curb Ramp Type Single Direction A 4 EACH 4,050.00$ 16,200.00$ 77 2-09 Structure Excavation Class B 29 CY 20.00$ 580.00$ 78 7-05 Adjust Catch Basin 4 EACH 750.00$ 3,000.00$ 80 8-13 Adjust Monument Case And Cover 2 EACH 720.00$ 1,440.00$ SCHEDULE A - BASE B 81 7-05 Connection To Drainage Structure 2 EACH 730.00$ 1,460.00$ 82 2-01 Roadside Cleanup 1 EST. 250.00$ 250.00$ 83 1-04.4 Minor Change 1 EST. 25,000.00$ 25,000.00$ 84 1-07.15 SPCC Plan 1 LS 1,000.00$ 1,000.00$ 85 1-05.18 Record Drawing 1 LS 2,000.00$ 2,000.00$ 86 1-05.13 Coordination For Installation Of "For Willene" 1 LS 2,000.00$ 2,000.00$ 87 5-03 Decomposed Granite 8 CY 600.00$ 4,800.00$ 88 2-12 Construction Geotextile For Separation 73 SY 10.00$ 730.00$ 89 6-02 Seat Wall 8 LF 900.00$ 7,200.00$ 90 8-26 Block Seating 24-Inch 2 EACH 5,000.00$ 10,000.00$ 91 8-26 Block Seating 95-Inch 1 EACH 9,000.00$ 9,000.00$ 92 6-02 Concrete Retaining Wall For 'Bridge' 20 LF 800.00$ 16,000.00$ 93 8-14 Detectable Warning Plate 6 EACH 500.00$ 3,000.00$ 94 8-26 Skate Prevention Bars 1 LS 1,300.00$ 1,300.00$ SUBTOTAL SCHEDULE A 417,524.50$ SCHEDULE B - BASE B WATER LINES 14 7-14 Resetting Existing Hydrants 1 EACH 1,600$ 1,600.00$ OTHER ITEMS 79 7-09 Adjust Valve Box 4 EACH 610$ 2,440.00$ SUBTOTAL SCHEDULE B 4,040.00$ SCHEDULE B SALES TAX (est. 9.0%) 363.60$ SUBTOTAL SCHEDULE B + SALES TAX 4,403.60$ SUBTOTAL SCHEDULE A + (SUBTOTAL SCHEDULE B + SALES TAX)421,928.10$ BID ALTERNATE 1 PREPARATION 1 1-09.7 Mobilization 1 LS 20,000.00$ 20,000.00$ 2 2-01 Clearing And Grubbing 1 LS 3,300.00$ 3,300.00$ 3 2-02 Removal Of Structure And Obstruction 1 LS 3,300.00$ 3,300.00$ GRADING 5 2-03 Roadway Excavation Incl. Haul 479 CY 27.00$ 12,933.00$ 6 2-03 Select Borrow Incl. Haul 50 CY 25.00$ 1,250.00$ 7 2-03 Embankment Compaction 13 CY 29.00$ 377.00$ STORM SEWER 8 7-04 Schedule A Storm Sewer Pipe 12 In. Diam. 56 LF 53.00$ 2,968.00$ 9 7-05 Catch Basin Type 1 5 EACH 1,550.00$ 7,750.00$ 10 7-04 Downspout 9 EACH 600.00$ 5,400.00$ 11 2-02 Pothole 3 EACH 410.00$ 1,230.00$ SANITARY SEWER 13 7-17 Ductile Iron Sewer Pipe 12 In. Diam. 143 LF 83.00$ 11,869.00$ SURFACING 18 4-04 Crushed Surfacing Top Course 300 TON 32.00$ 9,600.00$ HOT MIX ASPHALT 19 5-04 HMA Cl. 1/2 In. Pg 58V-22 256 TON 140.00$ 35,840.00$ 20 5-04 Planing Bituminous Pavement 12 SY 80.00$ 960.00$ EROSION CONTROL AND ROADSIDE PLANTING 21 8-02 PSIPE Fraxinus Pennsylvanica 'Summit' (2 1/2" Cal) 2 EACH 478.00$ 956.00$ 23 2-Aug PSIPE Cistus X Purpureus (2 Gal) 6 EACH 29.00$ 58.00$ 24 8-02 PSIPE Gaultheria Shallon (1 Gal) 6 EACH 7.00$ 42.00$ 26 8-02 PSIPE Rosmarinus Officinalis 'Tuscan Blue' (2 Gal) 5 EACH 29.00$ 145.00$ 27 8-02 PSIPE Vaccinium Ovatum (2 Gal) 4 EACH 24.00$ 96.00$ 28 8-02 PSIPE Berberis Thunbergii 'Crimson Pygmy' (1 Gal) 46 EACH 9.00$ 414.00$ 38 8-02 PSIPE Helictotrichon Sempervirens (1 Gal) 26 EACH 9.00$ 234.00$ 40 8-02 PSIPE Lavandula X Intermedia 'Grosso' (1 Gal) 10 EACH 10.00$ 100.00$ 42 8-02 PSIPE Mahonia Nervosa (1 Gal) 23 EACH 13.00$ 299.00$ 43 8-02 PSIPE Mahonia Repens (1 Gal) 39 EACH 10.00$ 390.00$ 45 8-02 PSIPE Pennisetum Alopecuroides 'Hameln' (1 Gal) 17 EACH 7.00$ 119.00$ 48 8-02 PSIPE Polystichum Munitum (1 Gal) 14 EACH 8.00$ 112.00$ 51 8-02 PSIPE Sesleria Autumnalis (1 Gal) 33 EACH 10.00$ 330.00$ 53 8-02 PSIPE Allium Sphaerocephalon (Bulb) 66 EACH 2.00$ 132.00$ 54 8-02 Topsoil Type A1 22 CY 74.00$ 1,628.00$ 56 8-02 Organic Compost Mulch 5 CY 62.00$ 310.00$ 57 8-02 Root Barrier 96 LF 8.00$ 768.00$ 58 8-02 Seeded Lawn Installation - Eco Lawn 8 SY 7.00$ 56.00$ 61 8-01 Erosion Control And Water Pollution Prevention 1 LS 1,200.00$ 1,200.00$ TRAFFIC 62 8-04 Cement Conc. Traffic Curb And Gutter 462 LF 41.00$ 18,942.00$ 63 8-04 Cement Conc. Traffic Curb 236 LF 52.00$ 12,272.00$ 66 8-04 Cement Conc. Gutter 114 LF 52.00$ 5,928.00$ 67 8-21 Permanent Signing 1 LS 4,000.00$ 4,000.00$ 69 8-22 Plastic Access Parking Space Symbol With Background 2 EACH 450.00$ 900.00$ 70 8-22 Plastic Crosswalk Line 80 SF 20.00$ 1,600.00$ 71 8-22 Plastic Stop Line 25 LF 80.00$ 2,000.00$ OTHER ITEMS 72 8-14 Cement Conc. Sidewalk 344 SY 62.00$ 21,328.00$ 73 8-06 Cement Conc. Driveway Entrance Type 2 31 SY 88.00$ 2,728.00$ 74 8-14 Cement Conc. Curb Ramp Type Perpendicular A 3 EACH 4,200.00$ 12,600.00$ 76 8-14 Cement Conc. Curb Ramp Type Parallel A 1 EACH 4,250.00$ 4,250.00$ 77 2-09 Structure Excavation Class B 55 CY 20.00$ 1,100.00$ 80 8-13 Adjust Monument Case And Cover 2 EACH 720.00$ 1,440.00$ 82 2-01 Roadside Cleanup 1 EST. 250.00$ 250.00$ 83 1-04.4 Minor Change 1 EST. 25,000.00$ 25,000.00$ 84 1-07.15 SPCC Plan 1 LS 250.00$ 250.00$ TOTAL BID ALTERNATE 1 238,754.00$