Loading...
HomeMy WebLinkAbout03-004RESOLUTION NO. 03-004 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, WASHINGTON ENDORSING THE CITY HALL ANNEX SCHEMATIC DESIGN AND THE CITY HALL PRE-DESIGN REPORT AND DIRECTING STAFF TO MOVE FORWARD WITH THE PREPARATION OF DESIGN DRAWINGS BE IT RESOLVED by the City Council of the City of Port Townsend as follows: That Council rescinds its Resolution 02-036 and replaces it with this resolution in support of a combined City Hall/City Hall Annex proposal as follows: City administrative space for current and future needs are set at 12,000 to 14,000 SF (approx.), and would be met by construction of a 10,500 to 14,000 SF (approx.) new City Hall Annex and use of 1500 SF in City Hall library for administrative uses; the current meeting rooms and City Council chamber would continue to be used as for legislative activities and public space uses. Cost of building construction of a new City Hall Annex would not exceed an estimated $2.54 M (plus any adjustments for inflation) plus the costs for plans, engineering, construction management. The currently available funding from the $3.4M bond issue, plus interest on the bond, plus an anticipated Federal Grant of $0.17M, along with any additional funds that may be generated for the project are to be earmarked as follows: $3,000,000 City Hall Annex 700,000 City Hall It is recognized that the location of the Annex adjacent to City Hall will provide an additional $250,000 benefit and future cost savings to the City Hall Renovation. NOTE: Money unused in one category may be used in another category, so long as project goals are met. City Manager to proceed with plans, specifications, and engineering (PSE) for combined City Hall/City Hall Annex proposal. Manager to report to Council at timely intervals regards status of PSE and project consistency with budget. (See paragraph 7.) 5. City should assume project management responsibility for preservation and restoration of City Hall, within budget parameters defined by this resolution. 6. City Manager and the Jefferson County Historical Society to develop plan on funding 1 Resolution 03-004 and achieving full restoration and preservation of City Hall, to include the following elements: Priority of goals should be: (1) uses (City Council, administrative and related public uses) and preservation, then (2) restoration. Third story restoration considered an integral part of the restoration process. Total restoration and preservation costs of City Hall not to exceed estimate of $4.56M (which includes $750,000 - $900,000 from Councilmanic bond, leaving a net of $3.66M to $3.81M to be raised by the Jefferson County Historical Society or other grant and funding sources). Total combined Annex/City Hall budget not to exceed estimate of $7.3M to $7.5M (rounded) (consisting of $3.66M to $3.81M City Hall budget per paragraph 6, plus up to $3.7M Annex/preliminary City Hall. D. Utilize to extent available grant sources and realistic private funding projections. In the event grants or gifts affords the City the opportunity to complete the process or add value to the process, the City Council may add to the cap on funding or use the funds to reduce public indebtedness on the project. Fo Move forward on the Downtown Parking Plan to evaluate long term parking needs in the Historic District. Develop a critical path schedule identifying investment to date, tasks to be undertaken and completed preparatory to the City Council committing additional funds earmarked to pay for preservation and the restoration of City Hall (see paragraph 7 below). The critical path schedule would stipulate a date certain for a vote by Council on sizing and ways and means of funding the project. Develop plan on efficient use of balance of City Hall (balance after Council Chambers and City administrative/public space uses), based on alternative preservation/restoration scenarios (preservation only, partial restoration, full restoration). Planning would include consultation with JCHS, and other community groups. Plan elements to include: i. Consideration of long-term lease with JCHS at fair market rental (which could include the concept of public benefit). ii. JCHS's ability and plan to raise funds to meet JCHS needs (rent, fix up). Jo Develop plan for public information and participation concerning City Hall restoration and construction of annex, and related improvements (for example, streetscape). 2 Resolution 03-004 o Provide, in consultation with City Attomey, information on ways to enhance opportunities for local contracting, project management, and other services, consistent with state bidding law requirements. Results of information will be presented to City Council for review and approval, and become data points on critical path schedule. Lo Provide information on cost impacts and feasibility of including 1% for arts in capital construction budget. Results of information will be presented to City Council for review and approval, and become data points on critical path schedule. Prior to Council authorizing Annex contract award (where construction costs for Annex, and preliminary administrative use of City Hall, become fixed), Council would undertake a review of assumptions for achieving City Hall uses, preservation and restoration based on Manager's proposed plan (paragraph 6 above). Authorization of Annex contract is inextricably linked to Council assurance that City Hall use, preservation, and restoration plan is capable of being accomplished. If Council is not assured that City Hall preservation/restoration will occur, or if construction costs for Annex and preliminary City Hall restoration to accommodate City uses substantially exceed the budget set by Council in this motion, then Council will review options to address City administrative needs and City Hall preservation/restoration. ADOPTED by the City Council of the City of Port Townsend at a regular meeting thereof, held this 13th day of January, 2003. Ke~~'~'~' Attest: Approved as to form: Pamela Kolacy, CMC City Clerk City Attomey 3 Resolution 03-004