Loading...
HomeMy WebLinkAbout2018-09-24 Addendum 3 Jefferson StreetAddendum No. 3 for Construction of Jefferson Street Sidewalk Taylor St. - Washington St. City of Port Townsend Work Order #1067 Prepared by: City of Port Townsend Department of Public Works 250 Madison Street, Suite 211 Port Townsend, WA 98368 The above mentioned CONTRACT PROVISIONS AND PLANS has been reviewed and approved for advertisement. Such review includes all plans, specifications, and permits associated with the project. Prepared by: Samantha Harper, P.E. Checked by: Sarah Tiffany Approved by: David Peterson, P.E. ADDENDUM NO. 3 TO THE CONTRACT PROVISIONS AND PLANS FOR CONSTRUCTION OF Jefferson Street Sidewalk Taylor St. - Washington St. City of Port Townsend Work Order No. 1067 TIB Project No. P -W -151(P07)-1 ISSUED: September 24, 2018 BID OPENING: 4:00 PM September 26, 2018 Acknowledge receipt of this Addendum on the Bid Proposal (Exhibit A), Page 1. TO PROSPECTIVE BIDDERS: The attention of all prospective bidders on the above project is directed to the following modifications and additions to the Contract Documents, which are hereby made a part of the Contract Provisions and Plans. MANUAL COVER, BID SUBMITTAL COVER SHEET AND TABLE OF CONTENTS No Change PART I — CALL FOR BIDS No Change PAGE 2 OF 4 Jefferson Street Sidewalk Taylor St. — Washington St. City of Port Townsend Work Order No. 1067 TIB Project No. P -W -151(P07)-1 PART II — CONTRACT SPECIFICATIONS Special Provisions 1-07.23(1) Construction Under Traffic Section 1-07.23(1) is supplemented with the following: (January 5, 2015) Lane closures are subject to the following restrictions: *** The City will allow for a maximum of a 3 -week period the closing of one lane of traffic, westbound on Jefferson Street and southbound on Quincy Street (i.e. inbound to downtown). The Contractor will be required to allow access to the dental clinic, the chapel and the Bishop Hotel throughout the project and during the duration of the closure period. *** If the Engineer determines the permitted closure hours adversely affect traffic, the Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in writing of any change in the closure hours. 8-05 Joint Utility Trench (New Section) Section 8-05 is deleted in its entirety. PART III - BID FORMS No Change PART IV — CONTRACT FORMS No Change PART V — APPENDICES No Change PAGE 3 OF 4 Jefferson Street Sidewalk Taylor St. — Washington St. City of Port Townsend Work Order No. 1067 TIB Project No. P -W -151(P07)-1 CONTRACT PLANS No Change Bidders shall furnish the City of Port Townsend with evidence of receipt of the Addendum. This Addendum will be incorporated in the contract when awarded and when formally executed. Any questions please contact Laura Parsons, P.E. at Iarsons(cityoft,us. David Peterson, P.E. City Engineer City of Port Townsend Attachments: None Jefferson Street Sidewalk Taylor St. — Washington St. City of Port Townsend Work Order No. 1067 TIB Project No. P -W -151(P07)-1 PAGE 4 OF 4