HomeMy WebLinkAbout2018-09-19 Addendum 2 - combine Jefferson Street SidewalkAddendum No. 2
for Construction of
Jefferson Street Sidewalk
Taylor St. - Washington St.
City of Port Townsend Work Order #1067
Prepared by:
City of Port Townsend
Department of Public Works
250 Madison Street, Suite 211
Port Townsend, WA 98368
The above mentioned CONTRACT PROVISIONS AND PLANS has been reviewed and approved for
advertisement. Such review includes all plans, specifications, and permits associated with the project.
Prepared by: Samantha Harper, P.E.
Checked by: Sarah Tiffany
Approved by: David Peterson, P.E.
ADDENDUM NO. 2
TO THE CONTRACT PROVISIONS AND PLANS
FOR CONSTRUCTION OF
Jefferson Street Sidewalk
Taylor St. - Washington St.
City of Port Townsend Work Order No. 1067
TIB Project No. P -W -151(P07)-1
ISSUED: September 19, 2018
BID OPENING: 4:00 PM
September 26, 2018
Acknowledge receipt of this Addendum on the Bid Proposal (Exhibit A), Page 1.
TO PROSPECTIVE BIDDERS:
The attention of all prospective bidders on the above project is directed to the following
modifications and additions to the Contract Documents, which are hereby made a part
of the Contract Provisions and Plans.
MANUAL COVER, BID SUBMITTAL COVER SHEET AND TABLE OF CONTENTS
No Change
PART I — CALL FOR BIDS
No Change
PART II — CONTRACT SPECIFICATIONS
Special Provisions
PAGE 2OF5
Jefferson Street Sidewalk
Taylor St. — Washington St.
City of Port Townsend Work Order No. 1067
TIB Project No. P -W -151(P07)-1
Preparation of Proposal
The fourth paragraph of Section 1-02.6 is revised to read:
(August 2, 2004)
The fifth and sixth paragraphs of Section 1-02.6 are deleted.
Section 1-02.6 is supplemented with the following:
(August 3, 2015)
Cumulative Alternates Bidding
The Bid Proposal for this Contract requires the Bidder to bid cumulative Alternates as
part of the bid. As such the Bidder is required to submit a Base Bid and a bid for each of
the Alternate(s).
Bid Proposal
The Bid Proposal includes the following:
Base Bid
The Base Bid shall include constructing all items included in
the Proposal except those items contained in the Alternate(s).
Alternate(s)
a. Alternate Al
Based on constructing (*** all work associated with the
construction of the uphill bike lane on the east side of
Quincy Street from Washington Street to Jefferson Street
and the north side of Jefferson Street from Quincy Street
to Taylor Street. ***)
The Bid items for Alternate Al are as listed in the Bid
Proposal.
Bidding Procedures
To be considered responsive the Bidder shall submit a price on each
and every Bid Item included in the Base Bid and all Alternate(s.)
The successful Bidder will be the Bidder submitting the lowest
responsible Bid for the highest order Preference that is within the
amount of available funds forthe project. The following are listed in
order from highest to lowest Preference:
PAGE 3OF5
Jefferson Street Sidewalk
Taylor St. — Washington St.
City of Port Townsend Work Order No. 1067
TIB Project No. P -W -151(P07)-1
1. Preference 1: Lowest total for Base Bid plus Alternate Al.
2. Preference 2: Lowest total for Base Bid.
The Contracting Agency may, at their discretion, award a Contract for
the Base Bid, without any additional Alternates, in the event that all
Bids exceed the available funds announced. In any case, the award will
be subject to the requirements of Section 1-03.
PART III - BID FORMS
Exhibit A — Bid Proposal
Replace Exhibit A — Bid Proposal with the Bid Proposal attached to this Addendum No. 2
Exhibit B — Bid Tabulation Form
Replace Exhibit B — Bid Tabulation Form with the Bid Tabulation Form attached to this
Addendum No. 2
PART IV — CONTRACT FORMS
No Change
PART V — APPENDICES
No Change
CONTRACT PLANS
Replace the following Sheets:
Sheet 3 of 26; Sheet 5 of 26; Sheet 8 of 26; Sheet 15 of 26
PAGE 4 OF 5
Jefferson Street Sidewalk
Taylor St. — Washington St.
City of Port Townsend Work Order No. 1067
TIB Project No. P -W -151(P07)-1
Bidders shall furnish the City of Port Townsend with evidence of receipt of the
Addendum. This Addendum will be incorporated in the contract when awarded and
when formally executed.
Any questions please contact Laura Parsons, P.E. at Iarsons(cityof�Jt,us.
David Peterson, P.E.
City Engineer
City of Port Townsend
Attachments:
Exhibit A — Bid Proposal
Exhibit B — Bid Tabulation Form
Revised Sheets: Sheet 3 of 26; Sheet 5 of 26; Sheet 8 of 26; Sheet 15 of 26
PAGE 5OF5
Jefferson Street Sidewalk
Taylor St. — Washington St.
City of Port Townsend Work Order No. 1067
TIB Project No. P -W -151(P07)-1
EXHIBIT A
BID PROPOSAL
Proposal of
(Hereinafter called "Bidder"), organized and existing under the laws of the State of, doing business
as
To the City of Port Townsend ("City"):
In compliance with your Call for Bids, Bidder hereby proposes to perform all work for the following
Project or Contract: Jefferson Street Sidewalk in strict accordance with the Contract Documents,
within the time set forth therein, and at the prices stated below.
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid each party thereto
certifies as to his own organization, that this Bid has been arrived at independently without
consultation, communication or agreement as to any matter relating to this Bid with any other
Bidder or with any other competitor.
Bidder hereby agrees to commence work under this Contract on or before a date to be specified in
the Notice to Proceed.
Bidder acknowledges that if the Bid Proposal is made without a requirement for a Bid Deposit, and
Bidder is awarded the Contract but fails to execute the Contract, then Bidder shall be disqualified
from submitting further Bid Proposals to the City for a period of two years from Notice of Award.
Bidder agrees to perform all work as described in the Contract Documents and as shown on the
drawings for the .Jefferson Street Sidewalk:
Receipt is hereby acknowledged of Addendum(s) No(s): [NOTE:
write "none" if there were no addendums.]
EXHIBIT A —Bid Proposal Page 1 of 2 Jefferson Street Sidewalk
Addendum No. 2
Total Base Bid Amount
Total Bid
Base Bid
(Schedule A)
Alternative 1
(Schedule B)
Total Project
Receipt is hereby acknowledged of Addendum(s) No(s): [NOTE:
write "none" if there were no addendums.]
EXHIBIT A —Bid Proposal Page 1 of 2 Jefferson Street Sidewalk
Addendum No. 2
EXHIBIT A
1. If the Bidder is a sole proprietorship, so state and give the name under which business is
transacted.
2. If the Bidder is a co -partnership, so state, giving firm name under which business is transacted.
3. If the Bidder is a corporation, this Proposal must be executed by its duly authorized officials.
Bidder's Firm Name
0
Authorized Signature (required)
Bidder's address and
Telephone/Fax numbers for
Official communications:
STATE CERTIFICATE OF REGISTRATION NO.
STATE UNIFIED BUSINESS IDENTIFIER NO.
Date
END OF TEXT
EXHIBIT A —Bid Proposal Page 2 of 2 Jefferson Street Sidewalk
Addendum No. 2
EXHIBIT B - BID TABULATION FORM
ITEM
NO.
WSDOT ITEM
ITEM
Description
QTY
UNIT
UNIT PRICE
TOTAL
Base Bid - SCHEDULE A
PREPARATION
1
1-09.7
Mobilization (8% Construction Costs)
1
LS
2
2-01
Clearing and Grubbing
0.2
AC
3
2-02
Removal of Structures and Obstructions
1
LS
5
SPEC
Removing Cement Conc. Sidewalk
179
SY
6
SPEC
Removing Cement Conc. Ditch
490
LF
7
SPEC
Removing Asphalt Conc. Pavement
1585
SY
8
SPEC
Removing Cement Conc. Curb
200
LF
9
8-22/SPEC
Removing Paint Line
656
SF
10
2-02
Removing Painted Crosswalk Line
200
SF
11
SPEC
Sawcutting
1365
LF
GRADING
12
2-03
Roadway Excavation Incl. Haul
935
CY
13
8-15
Ditch Excavation Incl. Haul
65
CY
14
2-03
Common Borrow Incl. Haul
485
CY
STORM SEWER
15
7-05
Catch Basin Type 1
9
EA
16
7-05
Concrete Inlet
3
EA
17
7-02
Flared End Section
1
EA
18
7-04
Schedule A Storm Sewer Pipe 12 in. Diam
275
LF
19
7-04
Schedule A Storm Sewer Pipe 8 in. Diam
20
LF
20
SPEC
Ductile Iron Pipe for Storm Sewer 12 in.
Diam
50
LF
SURFACING
21
4-04
Crushed Surfacing Base Course
465
TN
22
4-04
Crushed Surfacing Top Course
255
TN
HOT MIX ASPHALT
23
5-04
HMA CL. 1/2 IN. PG 58 - 22 (2" Depth)
95
TN
Jefferson Street Sidewalk Exhibit B - Bid Tab
Addendum No. 2 Page 1 of 3 Base Bid - Schedule A
EXHIBIT B - BID TABULATION FORM
ITEM
NO.
WSDOT ITEM
ITEM
Description
QTY
UNIT
UNIT PRICE
TOTAL
Base Bid - SCHEDULE A
EROSION CONTROL & ROADSIDE PLANTING
24
8-01
Inlet Protection
7
EA
25
8-01
Wattle
660
LF
26
8-01
High Visibility Fence
660
LF
27
8-01
Erosion Control and Water Pollution
Prevention
1
CALC
$ 7,000.00
$ 7,000.00
28
8-01
Seeding, Fertilizing, and Mulching
0.24
AC
29
SPEC
Topsoil Type A
148
CY
TRAFFIC
30
8-04
Cement Conc. Traffic Curb and Gutter
1070
LF
31
SPEC
2" Cement Conc. Curb and Gutter
185
LF
32
SPEC
Cement Conc. Traffic Curb and Gutter - Rain
Garden
195
LF
33
SPEC
Cement Conc. Traffic Curb- Rain Garden
112
LF
34
SPEC
Cement Conc. Curb Cut
6
EA
35
8-22
Paint Line
400
LF
36
8-22
Painted Crosswalk Line
640
SF
38
8-21
Permanent Signing
1
LS
39
1-10
Project Temporary Traffic Control
1
LS
40
1-10
Pedestrian Traffic Control
1
LS
OTHER ITEMS
41
7-01/2-09
Structure Excavation Class B Incl. Haul
140
CY
42
7-01/2-09
Shoring or Extra Excavation Class B
1020
SF
43
8-14
Cement Conc. Sidewalk
850
SY
44
8-06
Cement Concrete Driveway Type 1
35
SY
Jefferson Street Sidewalk Exhibit B - Bid Tab
Addendum No. 2 Page 2 of 3 Base Bid - Schedule A
EXHIBIT B - BID TABULATION FORM
ITEM
NO.
WSDOT ITEM
ITEM
Description
QTY
UNIT
UNIT PRICE
TOTAL
Base Bid - SCHEDULE A
45
8-06
Cement Concrete Driveway Type 3
85
SY
46
8-14
Cement Conc. Curb Ramp Type
Perpendicular A
10
EA
47
8-14/SPEC
Detectable Warning Surface
176
SF
48
7-05
Connection to Drainage Structure
2
EA
49
7-05
Adjust Catch Basin
1
EA
50
1-04.4
Minor Change
1
CALC
$ 15,000.00
$ 15,000.00
51
7-08
Plug Existing Pipe
2
EA
52
SPEC
Bronze Street Name
8
EA
53
SPEC
Wood Fence
125
LF
54
2-01
Roadside Clean-up
1
CALC
$ 5,000.00
$ 5,000.00
BASE BID SCHEDULE A SUBTOTAL:
Jefferson Street Sidewalk Exhibit B - Bid Tab
Addendum No. 2 Page 3 of 3 Base Bid - Schedule A
EXHIBIT B - BID TABULATION FORM
ITEM
WSDOTSTD
1-09.7
Mobilization (8% Construction Costs)
1
LS
2
Description
QTY
UNIT
UNIT PRICE
TOTAL
NO.
ITEM
SPEC
Removal Asphalt Extruded Curb
145
LF
Alternative Al - SCHEDULE B
PREPARATION
1
1-09.7
Mobilization (8% Construction Costs)
1
LS
2
2-01
Clearing and Grubbing
0.04
AC
4
SPEC
Removal Asphalt Extruded Curb
145
LF
7
SPEC
Removing Asphalt Conc. Pavement
280
SY
11
SPEC
Sawcutting
810
LF
GRADING
12
2-03
Roadway Excavation Incl. Haul
15
CY
14
2-03
Common Borrow Incl. Haul
15
CY
SURFACING
21
4-04
Crushed Surfacing Base Course
135
TN
22
4-04
Crushed Surfacing Top Course
70
TN
HOT MIX ASPHALT
23
5-04
HMA CL. 1/2 IN. PG 58 - 22 (2" Depth)
75
TN
EROSION CONTROL & ROADSIDE PLANTING
28
8-01
Seeding, Fertilizing, and Mulching
0.04
AC
TRAFFIC
35
8-22
Paint Line
805
LF
37
8-22
Plastic Bicycle Lane Symbol
9
EA
38
8-21
Permanent Signing
1
LS
39 1-10 Project Temporary Traffic Control 1 LS
OTHER ITEMS
54
2-01
Roadside Clean-up
1
CALC
$ 5,000.00
$ 5,000.00
Alternative Al SCHEDULE B SUBTOTAL:
Jefferson Street Sidewalk Exhibit B - Bid Tab
Addendum No. 2 Page 1 of 1 Alternative A1- Schedule B