HomeMy WebLinkAboutBLD07-208BIJILDING PERMIT
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-s09s
Project Information
Permit Type Residential - Addition/Remodel
Site Address 2935 GISE ST
Project Description
Replace 6 windows with new ones
Permit #
Proiect Name
Parcel #
BLD07-208
957902101
Names Associated wilh tltis Project
Type Name
Applicant Woods Theresa A
Owner Woods Theresa A
Contractor K-Designers
Contraclor K-Designcrs
Contact Phone #
License
Type License # Exp Date
0
0
CITY
STATE
3268 12131/2001
KDESI **0330t 09/01 /2008
Fee Information
Project Valuation
Building Permit Fee
Plan Review Fee
State Building Code Council Fee
Technology Fee for Building Permit
Record Retention Fee for Building
Permit
Total Fees
Project Details
Entered Bid Valuation 6,500 DOLI
$6.500.00
111.49
70.51
4.50
5.00
7.00
$204.50
*** SEE ATTACHED CONDITIONS ***
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
Thegrantingofthispernritshall notbeconstruedasapproval toviolateanyprovisionsofthePTMCorotherlarvsorregulations. Icertify
that the information providcd as a part of the application for this pcrnrit is true and accurate to the best of my knou,ledge. I furlher certify
that I am the ou'ner ofthe propcrty or authorized agent ofthe ou'ner.
fo^^4nz t) ,n J t
Date lssued
lssued By:
10109t2001
PWESTI.:RFIEI-D
Print Name
fln"
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
'/rlr ,4u5 dZ - zabDATE OF INSPECTION:
SITEADDRESS: 4gT 4/5€
PERMIT NUMBER:
*/
PROJECT NAME: AIU I^ I AN > 3 CONTRACTOR: L bEErc /A 1
CONTACT PERSON: OI*IAZ PHoNE: /-B 4z' - -fZ I -
TYPE OF INSPECTION:///
Z
! APPROVED ! APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
! NOTAPPROVED
Call for re-inspection before
proceeding.
Inspector Date
Approved plans and permit cord must be on-site and available at time of inspection. A re-inspection fee may
be assessed if work is not readyfor inspection.
Receipt Number:ffiffi8ffiffiffi$d
BLD07-208
BLD07-208
BLD07-208
BLD07-208
BLD07-208
CHECK
957902101
957902101
957902101
957902101
957902101
417766
$70.51
$5.00
$4.50
$117.49
$7.00
Total:
$70.51
$5,00
$4.50
$r17.49
$7.00
Plan Review Fee
Technology Fee for Building Permit
State Building Code Gouncil Fee
Building Permit Fee
Record Retention Fee for Building P
Total
$ 204.50
$204.s0
$0.00
$0.00
$0.00
$0.00
$0.00
$204.50
genprntrreceipts Page 1 of 1
WINDOW REPLACEMENT PERMIT
City of Port Townsend
Development Services Department
250 Madison Street
Port Townsend, WA 98368
(360) 379-s095 Fax: (360)344-46t9
tsLDo7- LDq
A window replacement permit is not required if ALL of the following conditions exists:o You are replacing existing glass with like glass. For example, the neighbor's
baseball went through your window, and you need to replace the windowpane.
o There is no change to the window frame(s) or sash(s).
This window replacement permit is required if AI\-Y of the following conditions exist in
your project:
o A different kind of glass in being installed, for example single-pane glass replaced. with double-pane glass.
. The window frame is being replaced.
Please complete a residential building permit application, rather than this permit, IF:' o The window size is being increased or decreased.
o A new window with a new opening in the building wall is being installed.
If your project includes electrical work, we provide Labor & Industries (L&I) electrical forms in
our office. Call L&I at (360) 417-2700 for more irtformation about electrical permits.
A detailed floor plan of the dwelling is required. Label all rooms, and indicate door and
*r5d;'w-local6n-s and sizes. If you are replacing all the windows, check here
-;
otherwise indicate on the floor plan which oo.1.1 yoo u"" replacing. (NOTE: A door with
507o or more glass is considered a window.)
Please verifu that the replacement doors and windows meet the minimum U-factors required by
the 2004 Washington State Energy Code:
.40 or better U-Factor for Windows: Yes y. No _
.20 U-factor for Doors: Yes No
NOTE: the International Building Code (IBC) has specific requirements regarding safety
glazing at hazardous locations, emergency escape windows in sleeping rooms, and smoke
detectors. See attached IBC section to determine if any of your glass needs to be safety glazed.
P:\DSD\Department Forms\Building Forms\Application-Window Replacement Permit.doc
04/0312006 Page 1 of 3
Name of Legal Owner(s):n 5
Mailing Address:3{,5 I
City, State, Zip:l- fo*3L
s: -/3/bPhone
ZoningDistrict: il m rL ; ll a--Parcel# 157 q\z lOl
Legal Description: Addition 5;t piltT[,'-pJafyt Block &,1 Lo(s) I 4 2-
( Deo; q nahsContractorts Name:
Mailing Address:Tt t//)t-t*o ,?0a
City, State, Zip:&r,o (:r.,r, CA ?S t lo
Phone: 0/6) tts-7flr
Labor and Industries License #:Expiration Date:
City Business License #Expiration Date:
Estimated Value of Construction: $ 6daa, ry
Estimated Start Date: /, * ?--dr Estimated Completion Date: /a * /-a 7
Property Street Address:fsr G;* sl 0r l/toon5tn D, t'd,( f#A
Applicant Certification
The applicant hereby certifies to have knowledge of those sections of the Intemational Residential Code
and the Port Townsend Municipal Code pertinent to the above project and that the applicant is responsible for
constructing in conformance with these codes; the applicant understands that the permit, if issued, expires in six
months unless work is started; that the permit, after construction has started, will expire after one year if an
inspection is not made to show significant progress on the structure; the applicant agrees to abide by the ordinances,
codes, regulations, restrictive covenants, deed or plat restrictions, and water and sewer plans attached hereto; the
applicant certifies that all information given above and on accompanying plans is complete and accurate to the best
of their knowledge; and the applicant understands that this information will be relied upon in granting permits and
that is such information is later found to be inaccurate any permits may be withdrawn.
The undersigned hereby saves and holds the City of Port Townsend harmless from any and all causes of
action, judgments, claims, or demands, or from any liability of any nature arising from any non-compliance with any
restrictive covenants, plat restrictions, deed restrictions, or other restrictions which may have been established by
parties other than the City of Port Townsend.
Complete Application
Port Townsend Municipal Code, Section 16.04.140, Vested Rights - Substantially Complete Building
Permit Application: Applications for all land use and development permits required under ordinances of the City
shall be considered under the zoning and other land use control ordinances in effect on the date a fully complete
building permit application, meeting the requirements identified in this section, is filed with the Development
Services Departmenl Until a complete building permit application is filed, all applications for land use and
development permits shall be reviewed subject to any zoning or other land use control ordinances which become
effective prior to the date of issuance of a final decision by the City on the apf,ication.
An application of a building permit shall be considered complete when an application meeting all of the
requirements of Section 105.3 of the currently adopted International Residential Code is submitted which is
consistent with all then applicable ordinances and laws. In addition, if applicable, to be considered complete, such
an application must be accompanied by complete applications for a subsidiary land use or development permits
needed, such as a complete shoreline management permit application and/or complete applications for other
discretionary permits required under the ordinances of Port Townsend.
l'trln' &K t) *,!,/o- f*0
SigrCature of Applicant or Authorized Representative Date
For Official Use
P:\DSD\Department Forms\Building Forms\Application-Window Replacement Permit.doc
0410312006 Page 2 of 3
Building Official Approval Permit #:Date Issued
Let tJatZuv / lJ: Jb uggc /rjb/ts3 KDESIGI.ERS SEATTLE rAbL gLIVL
lF-'difl
.ctl.
F
.ta
.tE,
'.,lgJ.
.. itt:-@,.s
'Ol|::. :l
F,iX,Si"
&'8''H
i$"dJ. E
'6'dll "-:l$f-ti
9HS Fthott,
{,€
s F
g
F
:!.,.,, tt,,...,.:'
l: ".