HomeMy WebLinkAboutBLD07-195__ I
)
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Torvnsend, WA 98368
(360)379-s09s
BIJILDING PERMIT
Project Information
Permit Type Residential - Addition/Remodel
Site Address 816 CALHOUN ST
Proiect Description
Addition of sunroom, porch and deck; bath remodel
Permit #
Project Name
Parcel #
BLD07-195
96s102011
Names Associsted with this Project
Type Name
Applicant Lynch Trustee Janet L
Owner Lynch Trustee Janet L
Contractor Thomas Works
Contractor Thomas Works
License
Type License # Exp DateContact
Tom Ray
Tom Ray
Phone #
(360) 643-3662
(360) 643-3662
CITY
STATE
tt04 t2l3t/20a1
THOMAWT93l 05/t 8/2009
Fee Inforntation
Project Valuation
Building Pennit Fee
Plan Review Fee
State Building Code Council Fee
Technology Fee for Building Permit
Record Retention Fee lor Building
Permit
Project Details
Decks - Residential
Decks - Residential (Covered)
Dwellings - Type V Wood Frame
$24.148.96
391.25
254.31
4.50
1.83
10.00
96 SQFT
18 SQFT
244 SQFT
Total Fees $667.89
*** SEE ATTACHED CONDITIONS ***
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of t80
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not bc construed as approval to violate any provisions of the PTMC or other laws or regulations. I cerlify
thattheinfornrationprovidedasapartoftheapplicationforthisperrritistrueandaccuratelothebestofmyknowledge. Ifurthercertify
that I anr the owner ofthe property or authorized agent ofthe owner.
L- Lry)cF)Print Name Date f ssued: 091282001
lssued 81,: FRONTDESK
a-'\
BI]ILDING PERMIT
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-s09s
Project Information
Permit Type Residential - AdditiorVRemodel
Site Address 816 CALHOUN ST
Project Description
Addition of sunroom, porch and deck; bath remodel
Permit #
Project Name
Parcel #
BLD07-195
9651020t1
Conditions
10. Property corner surr/ey pins must be located at time of foooting inspection to verify setbacks.
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this perrnit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized a-qent of the owner.
i.:::ff* :'J3'Jl',J;,.
CO
N
S
T
R
U
C
T
I
O
N
PR
O
G
R
E
S
S
RE
C
O
R
D
CI
T
Y
OF
PO
R
T
TO
W
N
S
E
N
D
De
v
e
l
o
p
m
e
n
t
Se
r
v
i
c
e
s
De
p
a
r
t
m
e
n
t
25
0
Ma
d
i
s
o
n
St
r
e
e
t
.
Su
i
t
e
3.
Po
r
t
To
w
n
s
e
n
d
.
WA
98
3
6
8
PO
S
T
TH
I
S
CA
R
D
IN
A
SA
F
E
,
CO
N
S
P
I
C
U
O
U
S
LO
C
A
T
I
O
N
,
PL
E
A
S
E
DO
NO
T
RE
M
O
V
E
TH
I
S
NO
T
I
C
E
UN
T
I
L
AL
L
RE
Q
U
I
R
E
D
IN
S
P
E
C
T
I
O
N
S
AR
E
MA
D
E
AN
D
SI
G
N
E
D
OFF
BY
TH
E
AP
P
R
O
P
R
I
A
T
E
AU
T
H
O
R
I
T
Y
AN
O
TH
E
BU
I
L
D
I
N
G
IS
AP
P
R
O
V
E
D
FO
R
OC
C
U
P
A
N
C
Y
.
ST
A
M
P
E
O
AP
P
R
O
V
E
D
PL
A
N
S
MU
S
T
BE
AV
A
I
L
A
B
L
E
ON
TH
E
JO
B
S
I
T
E
,
PA
R
C
E
L
NO
,
96
5
7
0
2
0
1
1
PE
R
M
I
T
NO
.
BL
D
0
7
-
1
95
IS
S
U
E
D
DA
T
E
O9
I
2
8
I
2
O
O
7
D(
P
I
R
A
T
I
O
N
DA
T
E
AD
D
R
E
S
S
81
6
CA
L
H
O
U
N
ST
CO
N
S
T
R
U
C
T
I
O
N
TY
P
E
OC
C
U
P
A
N
T
LOAD
OW
N
E
R
LY
N
C
H
TR
U
S
T
E
E
JA
N
E
T
L
PR
O
J
E
C
T
DE
S
C
R
I
P
T
I
O
N
Ad
d
i
t
i
o
n
of
su
n
r
o
o
m
.
po
r
c
h
an
d
de
c
k
:
ba
t
h
remodel
CO
N
T
R
A
C
T
O
R
TH
O
M
A
S
WO
R
K
S
LE
N
D
E
R
IN
S
P
E
C
T
I
O
N
IN
S
P
DA
T
E
CO
M
M
E
N
T
S
IN
S
P
E
C
T
I
O
N
IN
S
P
DA
T
E
COMMENTS
TO
RE
Q
U
E
S
T
AN
TN
S
P
E
C
T
T
O
N
CA
L
L
(3
6
0
)
38
5
-
2
2
s
4
.
IN
S
P
E
C
T
I
O
N
RE
Q
U
E
S
T
S
MU
S
T
BE
RE
C
E
I
V
E
D
PR
I
O
R
TO
3:
0
0
PM
FO
R
NE
X
T
DA
Y
IN
S
P
E
C
T
I
O
N
03t26t2008
SE
T
B
A
C
K
S
SU
R
V
E
Y
PI
N
S
FO
O
T
I
N
G
FO
U
N
D
A
T
I
O
N
WA
L
L
Fo
u
n
d
a
t
i
o
n
dr
a
i
n
FL
O
O
R
FR
A
M
I
N
G
FR
A
M
I
N
G
PL
U
M
B
I
N
G
ME
C
H
A
N
I
C
A
L
SH
E
A
R
WA
L
L
IN
S
U
L
A
T
I
O
N
GW
B
RO
O
F
NA
I
L
I
N
G
MI
S
C
E
L
L
A
N
E
O
U
S
FI
N
A
L
BU
I
L
D
I
N
G
. .) CITY OF PORT TOWNSEND
PERMIT ACTIVITY LOG
PERMIT# JaLN AA -tq,\
SCOPE OF WORK:
DATE RECETVED Q-ta-A-/
DATE ACTTON INITIALSq- n-D-|ENTERED TNTO CHET alz n/
CA - to Planning - No evidence
CHECKED FOR COMPLETENESS
0 )L1,.'.+ P(rn{, l-ol caffif}/, L-Uf or -*n (n"r2) - copr_ rrrcade n_;F
?-2$- 0{gF
xln b 'hc hz' fr,r> ,
(
5zJ
ll- I4 -a-7 6,Or t f
I t-?,f-rn t Ll ,ri't."do (Y rl A-B/'J ,ft+Y r*t'f '# -t-'>/, I
)
I't
Inspection Report
Prqect UN permit *B L-b o f- les
Date Inspector
slrlla')<-L St>
lnspection & Notes
m
2
L
\
L
'
-
-
1
D
/
\
\
1'lE6/2007
$
?
:
0
1
F
A
H
1
3
8
0
2
9
7
5
1
?
0
EUILDI
N
C
PLUMBI
N
C
'icRot
r
u
n
w
o
n
l
(
DwV
S
$
I
I
F
T
F
L
U
}
t
E
I
f
l
E
C
I
T
Y
O
F
P
O
R
T
T
O
W
N
F
E
I
.
I
t
r
D
E
V
E
T
O
P
M
E
N
T
S
E
R
V
I
C
E
S
D
E
P
A
R
T
M
E
h
I
T
2
5
0
M
a
d
i
s
e
n
S
t
r
e
e
t
,
$
u
i
t
c
3
0
1
,
P
o
r
t
T
o
r
v
n
s
e
n
d
T
f
A
9
8
3
6
8
F
T
U
M
B
I
N
G
C
E
R
T
I
F
I
C
A
T
I
O
N
T
R
E
S
$
U
R
N
T
E
$
T
A
I
P
E
R
M
I
T
#
D
A
T
E
O
F
L
a
L
I
C
E
T
'
I
S
E
#
1
d
u
o
*
-
*
E
o
o
z
/
0
0
2
F
L
U
M
B
I
N
f
i
t
i
p
n
n
l
W
A
T
E
R
$
E
R
V
T
C
E
A
i
r
FtoTE:
T
n
s
r
r
N
c
R
E
Q
{
J
I
n
8
f
l
{
E
l
{
T
$
{
E
E
C
T
I
O
N
3
1
t
t
i
H
I
f
f
n
M
P
L
U
f
f
E
I
N
G
C
X
}
D
E
}
M
I
N
I
M
U
I
f
f
i
;
lilatar T
e
s
t
-
l
0
'
H
€
a
d
-
1
5
M
i
n
u
t
e
s
T
e
s
t
a
t
l
V
o
r
k
i
n
g
P
r
e
s
u
r
e
Air Tsst
-
5
F
F
E
I
-
I
5
M
i
n
u
t
c
e
5
0
#
P
S
I
-
1
5
M
i
o
u
r
c
s
I heteb
y
€
,
l
r
t
i
f
f
t
h
c
i
n
f
o
r
m
a
r
i
m
p
r
a
v
i
d
c
t
t
a
b
o
v
e
i
s
t
h
c
r
r
c
u
l
t
s
f
t
r
e
P
l
u
m
b
i
+
g
$
y
s
t
e
t
n
p
F
:
s
$
r
r
c
t
€
$
G
o
n
d
u
c
t
€
d
b
y
t
h
,
l
undersig
u
e
d
a
t
t
h
e
i
n
d
i
c
d
p
d
a
d
d
r
e
s
s
a
n
d
d
a
t
e
-
M
i
s
r
r
p
r
e
€
d
t
a
t
i
o
n
o
f
t
h
i
s
c
t
r
t
i
f
p
a
t
i
f
f
i
[
s
r
g
m
s
t
m
i
g
d
e
m
s
u
€
r
$
q
d
e
r
RcS/.9
A
€ovER
.
.
7
2
-
0
4
0
b
a
t
w
o
.
y
s
s
r
s
t
a
t
u
t
c
a
f
l
i
m
i
u
r
i
o
*
Y
E
t
t
t
A
L
S
T
S
T
E
M
I
N
S
P
E
C
T
I
O
N
I
E
I
n
E
Q
U
T
t
r
S
D
E
E
F
O
R
E
F
l
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
f,'or inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: I I' A-7 . O'7 PBRMIT NUMBER: .IJLOOI . Iq6
SITE ADDRESS:8l b O,nlhaon
PROJECT NAME: Lf , fn,- h
CONTACT PERSON: t
CONTRACTOR: a)."}rnaS L \of lc S
PHoNE: (e4 3 - 3("b 2
TYPE OF INSPECTION:14L
1(vJV)cyt
o
S Lg
N APPROVED ! APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
! NOTAPPROVED
Call for re-inspection before
proceeding.
Inspector Date
Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may
be assessed if work is not ready for inspection.
.t
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMBNT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
Jl-t1 -ol PERMIT NUMBER:-7-DATE OF INSPECTION:
SITE ADDRBSS:
PROJECT NAME:
CONTACT PERSON:
TYPE OF INSPECTION:
CONTRACTOR:
r\A puoun:
fi.(2_/
N APPROVED ! APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
N NOTAPPROVED
Call for re-inspection before
proceeding.
Inspector Date
Approved plans and permit card must be on-site and available at time of inspection. A re-inspectionfee may
be assessed if work is not ready.for inspection.
DATE OF INSPECTION:
SITE ADDRESS:
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 '#u'!ry> zva
8l(. ?aI fUMBER:h n/ 11"\
.BLD n1- nsPERMIT
PROJECT NAME:
CONTACT PERSON:
TYPE OF INSPECTION:
CONTRACTOR:
PHONE:
A)
\--- (-
Attr{---
! APPROVED N APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections
;hecked
at next inspection
! NOTAPPROVED
Call for re-inspection before
proceeding.
be
t'R,.<Inspector Date
Approved plans and permit card must be on-site and availoble at time of inspection. A re-inspectionfee rnay
be ctssessed if work is not ready.for inspection.
September 24,2007
City of Port Townsend
Building and Community Development
250 Madison St., Suite 3
Port Townsend, WA 98368
Re: Janet Lynch permit change
To Whom It May Concern:
I need to change Janet Lynch's permit to heated.
R-38 in ceiling
R-30 in floors
R-21 in walls
If you have any questions please feel free to contact me.
Thank you,
Tamara Halligan Architect, P.C.
6-
Tamara Halligan, Architect, P.C.
P.O, Box 862
Poft Townsend, WA 98368
360.385.2628
;: --)
sEP 26 2007
EI
cuY 0t
IEt5
T NSEND
DSD
Receipt Number
BLD07-195
BLDOT-195
BLD07-195
BLD07-19s
BLDOT-195
965702011
96570201 1
96570201 I
96570201 1
96570201 I
$254.31
$7.83
$4.50
$391.2s
$10.00
Total:
$104.3r
$7.83
$4.50
$391.25
$r0.00
Plan Review Fee
Technology Fee for Building Perm it
State Building Code Council Fee
Building Permit Fee
Record Retention Fee for Building P
$o-oo
$0.00
$0.00
$0.00
$o.oo
$s17.89
-082107
CHECK
Ogl17l2007 Plan Review Fee
7979
Total
$150.00 BLD07-195
$ 517.89
$517.89
genprntrreceipts Page 1 of 1
Development Seryices
www
Residential Building Permit Application
) Applications accepted by mail must include a check for initial plan review fee of $150F See the "Residential Building Permit Application Requirements" for details on
plan submittal requirements.
Property Owner: i
Name: t- \ftnr';F L L ur rv-V"r
Address: t'i[' CiiU
City/SUZip L 98'3t
P 3'1 2..J ?:Z-
Email: I V , LZ)r1-1
Co ntacURepresentative
Name:
Address:
City/SUZip:
Phone:
Email:
Any known wetlands on the property? Y @
Any steep slopes l>15%)? Y (D
I hereby certify that the information provided is correct, that I am either the owner or authorized to act on behalf of the owner
and that all activities associated with this permit will be in accordance with State Laws and the Port Townsend Municipal Code.
l'r j-1 i ,' i,i,..li
D
Project Address Legal Tax
Addition: KLLI-\
Block:
Parcer u ci;{ lA C)il U o
Project Description FlELU
c0tEVeD
'>Ulr) TOovvl , N e'N PEcK,N€
7a H oN@ e y( sTu,J&talt
Lender lnformation:
Lender information must be provided for projects
over $5,000 in valuation per RCW 19.27.O55.
Name.
Project vatuation: $ 9i), a00,"{'
(square feet):
Garage.lrt/|'t'
2nd floor il oeck({: dl(.2
Building lnformation
1't floor /:i z;
3'dfloor N'""
easemenr. N/lr
carport: N/*
Porch(es)t%
ls it finished? Yes No
Other:
Manufactured Home !
New n Addition
ADU !
Remodel/Repair [J--1Or-rr
\L)
ci b
Lt)
o
AL<r, hA4 41.,In))
State License
City Business License #:
City/SUZi
Addres
Name
Co
Phone
Email:
Total Lot Coverage (Building Footprint)
Square feet:% L(tl
lmpervious Surface:
Square feet t1CIo
Print N L
n Date -)
RESIDENTIAL BUILDING PERMIT APPLICATION
CHECKLIST
This checklist is for new dwellings, additions, remodels, and garages. The purpose ls fo show
what you intend to build, where it will be located on your lot, and how it will be constructed"
n Residential permit application.
n Washington State Energy & Ventilation Code forms
I Two (2).sets of plans with North arrow and scaled, no smaller than Ya" = 1 foot;
n A site plan showing:
1. Legal description and parcel number (or tax number),
2. Property lines and dimensions
3. Setbacks from all sides of the proposed structure to the property lines in accordance with a
pinned boundary line sirrvey
4. On-site parking and driveway with dimensions
5. Street names and any easements or vacations
6. Location and diameter of existing trees
7. Utility lines
8. lf applicable, existing or proposed septic system location
9. Delineated critical areas boundaries and buffers
f Foundation plan:
1. Footings and foundation walls
2. Post and beam sizes and spans
3. Floor joist size and layout
4. Holdowns
5. Foundation venting
I Floor plan:
1. Room use and dimensions
2. Braced wallpanel locations
3. Smoke detector locations
4. Attic access
5. Plumbing and mechanical fixtures
6. Occupancy separation between dwelling and garage (if applicable)
7. Window, skylight, and door locations, including escape windows and safety glazing
f Wallsection:
1. 'Footing size, reinforcement, depth below grade
2. Foundation wall, height, width, reinforcement, anchor bolts, and washers
3. Floor joist size and spacing
4. Wall stud size and spacing
5. Header size and spans
6. Wall sheathing, weather resistant barrier, and siding material
7. Sheet rock and insulation
8. Rafters, ceiling joists, trusses, with blocking and positive connections
9. Ceiling height
10. Roof sheathing, roofing material, roof pitch, attic ventilation
I Exterior elevatlons (all four) with existing slope of the land in relation to all proposed structures
I lf architecturally designed, one set of plans must have an original signature
I lf engineered, one set of plans must have one original.signature
ll For new dwelling construction, Street & Utility or Minor lmprovement application
WSEC Residential Construction Checklist
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
(360) 379-s095 Fax: (360) 344-4619
Washington State Energy Code (WSEC)
2001 Residential Construction Checklist
Complete this form in addition to WSEC forms. Please answer the following questions:
TYPE OF PROJECT:
NNew construction, or addition over 750 square feet
Must meet whole house and spot ventilation requirements, and show full WSEC compliance as
a stand-alone project. A detached, habitable structure such as an Accessory Dwelling tJnit
r.egardless of size must also meet these requirements.
d House addition under 750 square feet
Possible trade-ffi are allowedwith the existing buildingfor WSEC compliance, such es
increasing ceiling insulation. See WSEC component performance forms.
NOTE: A house addition less than 500 sq. ft. does not require whole house ventilation,
Spot ventilation is still required../ q-Z& 6'/
u"fu,Y laffioTu
n Radiant Floo(Boiler) ! Other
-
TYPE OF' HF],ATING _check all that a
ElecJric
1/ . all Heater tr Baseboard ! Forced Air Furnace
Non-Electric:
Propane:J Radiant Floor/Baseboard (Boiler) n LPG Stove ! LPG Furnace ! Other LPG
n Heat Pump tr Oil Furnace D Woodstove (can only be used as secondary heat source)
VAPOR RETARDERS:
Vapor retarders shall be installed toward the warm surface as represented below. Select one
option for floors, walls, and appropriate ceilings:
o Floors:
tJ Plywood with exterior glue
W6ty plastic (greater than or equal to 4 millimeter thick)
D Backed batts
e Walls:
! Poly plastic (greater than or equal to 4 millimeter thick)
[y'ace-stapled, backed batts
d Low-perm paint
o Ceilings:
n Not required where ventilation space averages greater than or equal to 12 inches above
insulation
! Face-stapled, backed batts
Z/oIy plastic (greater than or equal to 4 millimeter thick)
Z Low-perm paint
SEE BACK
P:\DSD\Department Forms\Suilding Forms\Application-Residential Energy Code Checkli$.doc
Page I of I
Si:;) 1 ! 'icJ;l
WASHINGTON STATE VENTILATION ND INDOOR AIR OIIALITY (2000 Code):
T)rpe of ventilation used throughout the house: ! HVAC Integrated Option n Exhaust Option
Whole House Fan for 6(Exhaust Option":
o In what room is your whole house fan located?
o What size is the whole house exhaust fan?D 50-75 CFM (1-2 bedroom house)
tr 80-120 CFM (3 bedroom house)
tr 100-150 CFM (4 bedroom house)
I 120-180 CFM (5 bedroomhouse)
Note: the whole house fan shall be readily accessible and controlled by a24hoar clock timer
with the capability of continuous operation, manual and automatic control. At the time of final
inspection, the automatic control timer shall be set to operate the whole house fan for at least 8
hours aday, and have a sone rating at 1.5 or less measured at 0.10 inches water gauge.
Spot Ventilation:
Source specific exhaust ventilation is required in each kitchen, bathroom, water closet, laundry
room, indoor swimming pool, spa and other rooms where excess water vapor or cooking odor is
produced. Bathrooms, laundries or similar rocims require fans with a minimum 50 cfm rating at
0.25 inches water gauge; kitchens shall have a fan with a minimum 100 cfm rating at 0.25 inches
water gauge.
0utdoor Air Inlets:
Outdoor air shall be distributed to each habitable room by means such as individual inlets,
separate duct systems, or a forced-air system. Habitable rooms include all bedrooms, living and
dining rooms but not kitchens, bathrooms or utility rooms. Where outdoor air supplies are
separated from exhaust points by doors, undercutting doors a minimum of %inch above the
surface of the finish floor covering, distribution ducts, installation or grilles, transoms or similar
means where permitted by the Uniform Building Code. When the system provides ventilation
through a dedicated opening, such as a window or through-wall vent, these openings must:
o Have controlled and secure openings
o Be sleeved or otherwise designed so as not to compromise the thermal properties of the wall or
window in which they are placed.
o Provide not less than 4 square inches of net free area of opening for each habitable space.
What type of fresh air inlet will be installed? (See figure below)
I Window Ports
! Wall Ports
P:\DSD\Department Forms\Building Forms\Application-Residential Energy Code Checkli$.doc
Page2 of2
y/n
2006 WASHINGTON STATE ENERGY CODE
City of Port Townsend Development Services Department
250 Madison Street, Suite 3, Port Townsend WA 983,68 (360) 379-5095 Fax (360) 344-4619
Washington State Energy Code 2006 Edition
Climate Zone 1 - Type R-3 and R-4
Changes for Single Family and Duplex Construction
The following is a list of code changes that will effect construction of single family and duplex homes in Climate Zone
1. This is nol a comprehensive list of changes. To see all the changes, download a new copy of lhe code and look
for a vertical bar in the margin indicating a change in the code.
Building Envelope:
Prescriptive Options Table 6-1. Option l, the U-factor for windows changed to U-.032. Glazing is limited to. Option ll, the U-factor for windows changed to U-.035.. Option lV, the U-factor for windows changed to U-.035.
10Yo of floor area
There may be an increased use of window U-factor averaging when using the prescriptive method. Applicants may
show compliance by providing area weighted average U-factor for all of the windows. With a more stringent standard
lhe use of averaging may increase. The applicant must submit a detailed window schedule demonstrating
compliance.
Component Performance Table 5-1. The target window U-factor changed to U-.035.. The target wall U-factor changed to U-.057.
Doors:
602.6 Exterior Doors. One unregulated door up to 24 square feet is still allowed.. Glazed doors are considered to be windows.. All opaque doors must meet the door U-factor requiremenl.
ln the past, any door could be called a window when included in the glazing percentage. Now, when using the
prescriptive options, opaque doors must meet the U-0,20 requirement. An insulated fiberglass or thermally broken
steel door will usually meet the U-factor requirement.
Single Rafter Joist:
Table 6-1, footnote 3
Table 5-1, footnote 3. lf there is room in the joist for R-38 insulation, R-38 is required. This applies to all single rafter joist 13" or
greater in depth.. R-30 single raler joist now limited to 500 square feet of roof area. Additional rafter area must use R-38
insulation.
The following table shows typical insulation requirements for single rafter joist- lf the table notes R-38, then R-38 is
required.
Footnote 3, Table 6-l or 6-2
Prescriptive Rafter lnsulation Based on Fiberglass Batts
Nominal Actual
Max depth with
1 " ventilation
First
5OO SF
Over
5OO SF
R-value R-value
2X10 9114"B 114"R-30 HD2 Note 1
2X12 11 1t4"10114"R-30 R-38 HD2
2X14 13114"131t4"R-38 R-38
l-Joist 9112"B 1t2"R-30 HD2 Note 1
l-Joist 11718"1A 7tB"R-30 R-38 HD2
l-Joist 14"13"R-38 R-38
l-Joist 16"15"R-38 R-38
Note 1
HD2
Upsize joist or provide an alternalive method meeting U-.027
Refers high density fiberglass batt or equivalent.
A take off noting rafter area will be required
ldentical rules are included in 5-1. They will be incorporated into the UA trade off spreadsheet.
502.4.4 Recessed Lighting Fixtures:
Must now be tested for air leakage using ASTM E283
A gasket or caulking must seal the fixture to the drywall
Other options for fixture air sealing, including field inspection and a sealed box have been deleted
This has been an option in Washington since 1991. California mandated testing for air tight can lights two years ago.
Since then, every major manufacturer has come on board. The fixtures are readily available. Look for the label in the
can. lf the can is not labeled, it does not comply.
505.3 Outdoor Lighting:
Requires high efficiency lighting or controls for all porch lighting
High Efficiency Luminaire is defined in Chapter 2. Typically requires a pin based compact fluorescent fixture
AJan exception to the High Efficiency Luminaire, a motion sensor + photo daylight control may be used.
505.4 Linear Fluorescent Fixtures:
. This rule applies to typical fluorescent tube fixtures. Linear fluorescenl fixtures must be fitted with T-8 (1" diameter) or smaller lamps (but not T 10 orT-1Zlamps)
a
a
I
a
o
a
Ghapter 9 Prescriptive Space Heating System Sizing Deleted. See IRG Ml401.3.. 503.2.2 Size limited to 150% of heating load
Replaced by IRC Section M1401,3. Heating and cooling equipment shall be sized based on building loads calculated
in accordance with Air Conditioning Contractors of America Manual J or other approved heating and cooling
calculation methodologies.
Manual J is a heating and cooling heat load calculation method. This method takes some training. See their web site
for details. http:l/vrttrwv.acca.org/techlmanualii
WSU has developed a spread sheet for WSEC Chapter 5 code qualification. We call this the CPworksheet. This
spread sheet will also provide a simple heating system size calculation that is roughly equivalent to manual J. Limit
the use of this spread sheet to electric resistance or combustion equipment sizing, Do not use this spread sheet to
size heat pumps or air conditioners. This spread sheet is available on our web site.
Washington State University Extension Energy Program Energy Code Support
Email: energvcode@enerqv.wsu.edu
Phone:360 956-2042
Gary Nordeen
Mike McSorley
Chuck Murray
Residential Energy Code Support. Energy and Ventilation Code Text. Residential Component PerformanceWorksheets. Residential Builders Field Guide
http :l/www.enerqv.wsu.ed u/code/code s u pport-cfm
For Non residential energy code support, Visit the NEEC web site.
http :/lwww neec.neUresou rceslreso u rces. html
a
t
a
Option
Glazino
Area'oi
% of Floor
Glazinq U-Factor
Door e
U-Factor Ceilin92 Vaulted
Ceiling3
Wall12
Above
Grade
Wall.
inta
Below
Grade
Wall.
exta
Below
Grade
Floor5
Slabo
on
GradeVerticaloverheadll
t"10%o.32 0.58 a.20 R-38 R-30 R15 R-15 R-10 R-30 R-10
ll,"15%0.35 0.58 o.20 R-38 R-30 R-21 R-21 R-10 R-30 R-10
Iil.25%
Group R-1
and R-2
Occupanci
es Onlv
0-40 0.58 o.20 R-38 i
U=0.031
R-30 /
U=0.034
R-21 I
U=0.057
R-15 R-10 R-30 i
U=0.02
9
R-10
IV Unlimited
Group R-3
and R-4
Occupanci
es Onlv
0.35 0.58 o.20 R-38 R-30 R-21 R-21 R-10 R-30 R-10
V Unlimited
Group R-1
and R-2
Occupanci
es OnlV
0-35 0.58 o.20 R-38 /
U=0.031
R-30 i
U=0.034
R-21 !
U=0.057
R-1s R-10 R-30 /
U=0.02I
R-10
TABLE 6.1
PRESCRIPTIVE REQUIREMENTSOJ FOR GROUP R OCCUPANCY
CLIMATE ZONE 1
* Reference Case
0. Nominal R-values are for wood frame assemblies only or assemblies built in accordance with Section 601.1
1. Minimum requirements for each option listed. For example, if a proposed design has a glazingratio to the conditioned floor
area of 13oh, it shall comply with all of the requirements of the 15oh glazing option (or higher). Proposed designs which cannot
meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code.
2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3- 'Adv'denotes
Advanced Framed Ceiling.
3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the
ceiling and the underside of the roof sheathing is less than I 2 inches and (b) there is a minimum I -incb vented airspace above the
insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited lo 500
square feet ofceiling area for any one dwelling unit.
4. Below grade walls shall be insulated either on the exterior to a minimum level of R-10, or on the interior to the same level as
walls above grade. Exterior insulation installed on below grade walls shall be a water resistant mbterial, manufactured for its
intended use, and installed according to the manufacturer's specifications. See Section 602.2.
5. Floors over crawl spaces or exposed to ambient air conditions.
6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed
according to manufacturer's specifications. See Section 602.4.
l. Int.denotesstandardframingl6inchesoncenterwithheadersinsulatedwithaminimumofR-l0insulation.
8. This wall insulation requirement denotes R-l9 wall cavity insulation plus R-5 foam sheathiirg.
9. Doors, including all fire doors, shall be assigned default U-factors from Table l0-6C.
10. Where a maximum glazing area is listed, the lotal glazing area (combined verlical plus overhead) as a percent of gross
conditioned floor area shall be less than or equal to that value. Overhead glazing with U-factor of U:0.40 or less is not included
tn glazing area limitations.
I l. Overhead glazing shall have U-factors determined in accordance with NFRC 100 or as specified in Section 502.1.5.
12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement.
1
Receipt Number
BLD07-19s 965702011 Plan Review Fee
CHECK
Total
$254.31
Total
$150.00 04.3$t
$150.00
N/A $ 150.00
$150.00
genprntrreceipts Fage 1 of I
Parcel Details
Parcel Number: 965702011
Parcel Number: 965702011
Owner Mailing Address:
JANET LYNCH TRUSTEE
JANET L LYNCH LIVING TRST
816 CALHOUN ST
PORT TOWNSEND WA9B36BBO14
Site Address:
816 CALHOUN ST
PORT TOWNSEND 98368
Section: 2
Qtr Section: SW1/4
Township: 30N
Range: 1W
Page 1 of2
Printes'" FrEendlV
School District: Port Townsend (50)
Firc Dist: Port Townsend (B)
Tax Status: Taxable
Tax Code: 100
Planning area: Port Townsend (1)
Sub Division: BAIRD SHORT PLAT
Ag$e$9ff$lettdu$s_egdei 1100 - HOUSES (single units, non-farm)
Property Description:
BArRD SHORT PLAT I LOT A | |
Click on photo for larger image.
?*U; rh,.+
fl-t,
Lup oG- 0e
SEARCH
Jeffer$sn Corlnt
No Permit
Data
Available
{ggegEqr Bldg Data
lr."-rr*',*Parcel lo,ur, * survevs
Jeflorro* {e*nly .'; : :, .,,',;,': i : ; .ilsvtf I couF{TY :NF* I *fpA&.Tffif;fitT$ I sHl[RCr"i
Sest vicwcd r,vith Micro$oft Inlernet HxJ:lorcr S.0 or later
{E$ w;nd0ws - Mnc
http ://www. co j efferson. wa.us/assessors/parcel/parceldetail. asp 911712007
I)
BAIRD SHORT PMT
A R7@RITNTATk@N AND RESIZING @r rxltrlNG L@TS2 AND 4, IN BT@CK TRT, @F KUHN'S RANCH ADDITI@N T@ TI
AS RTC@RDTD IN V@TUfu{E2 @T PMTS, PA6T26, REC@RDS @FJEFFENS@N C@UNru, WASHINGTON
EELNG A rcRTf@N CF TI.IE
STWWW, STCTI@N 2, T@WNSHIP 30 N@RTH,MN6E I WEtr, WTMfu{ffiTfu{TRIDIAN, JEFFTRS@N C@UNM
F@R: 6ARY & SAI"LY ANNE BAIRD
\\
\€RT
CITY
PER
SUR\
61-7
Et
GEN
1(
DWE
2.r
LOl
101
3_t
NOf
AT
4.:
TO
EXI
EIJ. I
ANt
wA'
PLI
tutu)
EXISlING
SAN SEWER Y-
EXISTINC
FIRE
HYDRANT T
.,'
-154PLATTED LOT LINES
IN KUHN'S RANCH
ADDITION (TYPtCAL)
.f t
MH .t'.d s
"s .f/'
at'
*'
4o)
.$(
$t
Y 5
*,d *b
tE6END
SET CRNER ,rO"A FtV\r
,
o.3,
r52 1/o
PROPOS0 SEt+fRG? LAttPHoLE (ctrau-our)
a SET J/S tN. DtA. REaAR ffi P-K.r' As suRWY catlRoL PdNr
8 EXsnNG stoRlt DRAIN cAtcH BAstN
EXISNNC SEWR MANHOLE OR
PROPOSEO SEWR HANHALE
5,/S IN. DIA. RESAR
,{/ Nna{ cAP ilARKm
'A. t+ooo PLs zJstt'
EXISNNG NRE HYORANT
.d \
OGntlG
l€utr
ft
+s .Z
Zo&o'?tt'
,t'
Ef -'\ *'
B4
?
/g^
g\/
/
t cttv oF PoRT TowNSEND
MONUMENT IN CAST IRON
CASE @ BENTON &iiffirlrcrl* (MoN' # rs)
ELEVATION = 145.15 FT. NAVDBE
F
o;)b
.r'
1 CB
os1 txo ,"t "'
YY
er'{
SUBJECT
PROJECT
tt
rh-
- r'(
F 'ffhf
I'DIJ\
RED
I'UA.
4)
.ro
00
oo.
o.gu^
l'Dlt
APru
/,/ HausE
t 916
DCSnhtc
Po
An
2\
PIACH
DIA
F
\d
0.8DtA
BIRCH
BIRCH
I*f,DIA
BIRCH
5o
. !*t-
?
tt x 4
n'(
\
v
TI
O
N
-
14
5
.
1
5
'
NA
!
D
1
9
8
8
CO
N
T
O
U
R
IN
T
E
R
V
A
L
=
2'
EX
I
S
T
I
N
G
FI
R
E
HY
D
R
A
N
T
I
L
HO
R
I
Z
O
I
'
I
T
A
L
DA
T
I
J
M
:
GE
N
E
R
A
L
NO
l
E
S
:
BA
S
I
S
OF
BE
A
R
I
N
G
S
:
N5
9
'
2
7
'
5
3
,
'
E
.
,
BE
T
W
E
E
N
CI
T
Y
OF
P.
T
.
MO
N
U
M
E
N
T
S
O
BE
N
T
O
N
AN
D
LA
W
R
E
N
C
E
AN
D
TA
Y
L
O
R
AN
D
LA
W
R
E
N
C
E
PE
R
CI
T
Y
OF
PO
R
T
TO
W
N
S
E
N
D
GP
S
SU
R
\
E
Y
CO
N
T
R
O
L
RE
C
O
R
D
E
D
IN
VO
L
U
M
E
19
OF
SU
R
\
€
Y
S
'
PA
G
E
(
S
)
61
TH
R
O
U
G
H
70
,
RE
C
O
R
D
S
OF
JE
F
F
E
R
S
O
N
CO
'
,
WA
S
H
I
N
G
T
O
N
.
r
.
,-
V
T KU
H
N
'
S
RA
N
C
H
AD
D
I
T
I
@
N
T@
TH
E
Cl
r
u
@F
P@
R
T@
W
N
S
E
N
D
,F
E
R
S
@
N
E@
U
N
W
,
WA
S
H
I
N
6
T
@
N
,
?
fu
{
E
R
I
D
I
A
N
,
JE
F
F
E
N
S
@
N
C@
U
N
W
,
WA
S
H
I
N
G
T
@
N
\€
R
T
I
C
A
L
BE
N
C
H
MA
R
K
-
35
CI
T
Y
OF
PO
R
T
TO
W
N
S
E
N
D
GP
S
MO
N
U
I
'
I
,
E
N
T
-
il
i
cr
n
or
po
n
r
ro
v
J
N
s
E
N
D
cP
s
co
N
T
R
o
{
-
b[
i
G
V
'
:
(l
o
r
-
u
u
i
le
oF
su
R
\
c
Y
s
,
PA
G
E
(
s
)
CT
-
Z
O
,
RE
C
O
R
b
S
OF
.,
E
F
F
E
R
S
O
N
CO
U
N
T
Y
.
WA
.
tR
D
tu
t
u
EL
E
V
A
"t
p
\\
*'
CI
T
Y
OF
PO
R
T
TO
W
N
S
E
N
D
MO
N
U
M
E
N
T
IN
CA
S
T
IR
O
N
CA
S
E
O
T
A
Y
L
O
R
&
\\
-
LA
r
y
R
E
N
c
E
.
(M
o
N
.
#
%\
t'
z
't
\-
/
//
--
.
-
rb
2
*'
/6.
,t
\
*'
OF
PO
R
T
TO
W
I
S
E
N
D
MO
N
U
M
E
N
T
IN
CA
S
T
IR
O
N
CA
S
E
O
BE
N
T
O
N
&
ii
f
f
i
r
i
l
c
r
l
-
(M
o
N
.
#
3s
)
EL
E
V
A
T
I
O
N
=
14
5
.
1
5
FT
.
NA
V
D
6
8
IE
R
A
L
NO
T
E
S
(C
O
N
T
I
N
U
E
D
)
:
!o
A
D
D
I
T
I
o
N
A
L
L
A
N
D
S
C
A
P
I
N
G
I
S
P
L
A
N
N
E
D
I
N
c
o
N
J
U
N
C
T
I
0
N
W
S
PR
O
P
O
S
E
O
SH
O
R
T
PL
A
T
.
NO
PR
O
P
O
S
E
D
TR
A
I
L
S
AR
E
PL
A
N
N
E
D
IN
CO
N
J
U
N
C
T
]
O
N
WI
I
H
TH
I
)P
O
S
E
D
SH
O
R
T
PL
A
T
.
TH
E
R
E
AR
E
NO
PL
A
N
N
E
D
PR
I
V
A
T
E
CO
N
O
I
T
I
O
N
S
,
CO
V
E
N
A
N
T
S
'
-
;T
N
i
C
T
I
b
H
S
CU
R
R
E
N
T
L
Y
PL
A
N
N
E
D
FO
R
TH
I
S
PR
O
P
O
S
E
D
SH
O
R
T
T.
OR
NA
D
tg
s
s
(
g
l
)
FR
O
I
|
C|
T
Y
OF
PO
R
T
ro
t
4
f
\
'
s
E
N
D
GP
S
MO
N
U
M
E
N
T
(A
N
D
,N
T
E
R
S
E
C
I
I
}
I
LA
I
I
R
E
N
C
E
St
EE
N
I
O
N
S7
'
)
SI
A
N
O
N
NU
M
E
E
R
35
z
,4
'
{
{
*
'
e"
tt
,.
,
,\
I.
C
U
R
R
E
N
T
Z
O
N
T
N
G
l
S
:
R
-
1
1
(
S
F
)
-
S
I
I
'
I
G
-
L
E
:
:
F
A
M
I
L
Y
R
E
S
I
D
E
N
T
I
A
L
-
U
P
T
o
8
D$
r
E
i
i
i
t
i
G
un
r
r
i
pE
n
ic
n
i
(i
l
t
H
.
'
s
,
o
o
o
s(
)
'
F
r
'
Lo
r
)
2.
WA
T
E
R
SE
R
V
I
C
E
:
EX
I
S
T
I
N
G
CI
T
Y
OF
PO
R
T
TO
W
N
S
E
N
D
TO
Ib
T
,
I
O
;
NE
W
TA
P
,
SE
R
V
I
C
E
AN
D
ME
T
E
R
FO
R
lo
r
"4
"
rn
o
M
Ex
t
s
l
H
o
cl
T
Y
MA
I
N
lN
Ll
N
c
o
L
N
ST
R
E
E
T
'
3.
FI
R
E
H\
I
R
A
N
T
CO
V
E
R
A
G
E
FO
R
SH
O
R
T
PL
A
T
EX
I
S
T
S
AT
TH
E
Hb
N
r
H
t
I
S
f
SI
D
E
OF
CI
N
T
I
E
U
O
ST
R
E
E
T
AT
CA
L
H
O
U
N
ST
R
E
E
T
AN
D
;i
ri
l
t
-
NO
N
T
T
T
C
I
S
i
Sr
b
f
Or
LI
N
C
O
L
N
SI
R
E
E
T
AT
BE
N
T
O
N
ST
R
E
E
T
.
4.
S
A
N
I
T
A
R
Y
S
E
W
E
R
S
:
E
X
I
S
T
I
N
G
C
I
T
Y
o
F
P
O
R
T
T
o
W
N
S
E
N
D
S
E
R
V
I
C
E
rb
lo
i
tn
"
;
NE
w
sE
R
V
l
c
E
FR
o
M
MA
I
N
L
I
N
E
sE
w
E
R
ii
r
n
r
s
r
o
x
iN
t-
t
t
t
c
o
t
-
H
sT
R
E
E
T
To
Lo
r
"8
"
7.
ST
R
E
E
T
LI
G
H
T
1
N
G
EX
I
S
T
S
AT
TH
E
Cg
R
N
E
R
OF
CA
L
H
O
U
N
AN
o
ir
n
c
o
i
l
r
,
r.
r
o
Ao
o
r
n
o
N
A
L
sT
R
E
E
T
LI
c
H
T
I
N
G
ls
PL
A
N
N
E
D
'
5.
LI
N
C
O
L
N
ST
R
E
E
T
EX
I
S
T
S
Wl
H
A
50
FO
O
T
RI
G
H
T
-
O
F
_
W
A
Y
WD
1
H
AN
D
CA
L
H
O
U
N
ST
R
E
E
T
EX
I
S
T
S
WT
H
A
73
FO
O
T
WD
E
RI
G
H
T
-
O
F
-
WA
Y
,
BO
T
H
WH
I
C
H
PR
O
V
I
D
E
AD
E
Q
U
A
TE
AC
C
E
S
S
TO
TH
E
PR
O
P
O
S
E
D
SH
O
R
T
PL
A
T
,
NO
AD
D
I
]
I
O
N
A
L
ST
R
E
E
T
S
OR
AC
C
E
S
S
EA
S
M
E
N
T
S
AR
E
PL
A
N
N
E
D
FO
R
TH
I
S
SH
O
R
T
PL
A
T
T]
ON
FO
R
IN
D
E
X
I
N
G
SU
R
\
E
Y
:
LO
T
2
AN
D
LO
T
4
OF
BL
O
C
K
.R
"
OF
KU
H
N
,
S
RA
N
C
H
AD
D
I
I
"
I
O
N
TO
TH
E
CI
T
Y
OF
PO
R
T
TO
W
N
S
E
N
D
lN
SE
1
/
4
5
W
1
/
4
SE
C
T
I
O
N
z'
,
TO
W
N
S
H
I
P
30
NO
R
T
H
,
RA
N
G
E
2
WE
S
T
,
WL
L
A
M
E
T
T
E
ME
R
I
D
I
A
N
'
JE
F
F
E
R
S
O
N
CO
U
N
T
Y
'
WA
T
DR
T
I
V
N
Bf
:
AS
C
C!
4
E
C
K
E
D
BY
:
AC
W
tr
O
g
MJ
h
I
B
F
R
:
Il
2
SH
t
r
T
z
OF
2
SH
E
E
T
S
21
5
5
DI
S
C
O
I
t
r
.
R
Y
RO
A
D
PO
R
T
TO
I
T
N
S
E
N
A
il
A
S
H
I
N
G
T
O
N
98
3
6
8
TE
L
E
P
H
O
N
E
:
(S
A
O
)
38
5
-
5
9
6
8
FN
t
(3
6
0
)
3'
.
/
9
-
5
6
5
e
W@
@
D
E
A
R
IN
@
"
Vf
f
i
f
N
@
6.
FU
T
U
R
E
DE
V
E
L
O
P
M
E
N
T
oR
RE
D
E
:
V
E
L
0
?
M
-
E
N
I
.
.
9
L
io
T
-"
A
'
'
oR
"8
"
MU
S
T
CO
N
F
O
R
M
10
TH
E
S0
R
M
W
A
ir
n
n
o
n
n
o
s
rH
E
cl
T
Y
HA
S
AD
o
P
T
E
D
AT
TH
E
TI
M
E
EI
T
H
E
R
TE
R
SU
C
H
DE
V
E
L
O
P
M
E
N
T
IS
SO
U
G
H
T
NA
h
i
E
&
AD
D
R
E
S
S
OF
DE
C
U
A
A
N
T
t
-'6A
R
Y
&
SA
L
L
V
AN
N
F
B/
{
/
R
P
il
6
AN
H
O
U
N
ST
R
,
E
E
T
rc
R
T
TO
W
N
S
E
N
D,
WA
S
H
IN
G
T
O
N
98
3
6
8
'
8
0
3
9
(3
6
0
)
37
e
-
2
n
t
.
:
,
\