HomeMy WebLinkAboutBLD05-211City of Port Townsend
l8l Quincy Street Suite 301
Port Townsbnd, WA 98368
344-3057 Fax 385-767s
Permit Number: BLD05-211 Issued: 12130/05 Parcel Number: 931401 801
Job Address: 2427 Washinston Street Zoning: P-l Occupancy: !i{
Nature of Work: RemovelRenlace 3 existins antennas w/ new DBDP antennas & add 4 new
equipment cabinets & I (E-911 cabinet for Cinsular Wireless
Owner Contractor: TBD - see Condition #1
GENERAL CONDITIONS APPLY. SEE LAST PAGE
SEPARATE PERMITS REOUIRED:
ELECTRICAL (WA State Labor and Industries)
RE D INSPECTIO APPROVED/D
Call48 hours before you dig for utility locates
1-800-424-5sss
CITY OF PORT TOWNSEND
BUILDER'S PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 before 3:00 p.m. for next
NOTE: Specio.l Inspection required for the use of Hieh-streneth boltine per IBC 1704.3.
Snecial Renorts shall indicate with the olans and and
the or
Holder's Asent shall review and oversee conection of anv and sll deficiencies noted bv
All new steel shall be minimum Grade 60
Any new horizontal reinforcing steel shall be supported
on chairs or dobies
COAX SUPPORT RACK CONNECTION
Connection bolts shall be A325 per plans - special
inspection required
Wedge anchors, 318" dia. A307 bolt, into concrete with
minimum I Yz" embedment; callfor inspection to
verify embedment prior to placement
Pagelof 2
)
Building Permit #BLDO5-21 I
GENERAL ITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
resistration number and a Citv business license. Failure to provide proof of this
documentation prior to work may result in job shut down while this is accomplished.
2. A separate electrical permit is required for any electrical work.
3. Re-inspections are required after any corrections are complete.
4. Final Inspections and approvals are required.
5. All Building Permits expire if no progress has been made within six months or, if no
inspections have been made by the Building Department within one year. Call for at least
one inspection per year to keep your permit active.
6. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at379-3208 prior to making changes to the approved plans.
7. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
/4-oG
APPLICANT DATE
CaIl48 hours before you dig for utility locates
1-800-424-5555
CABINET ANCHORING
318"A307 threaded rod, embed 3" minimum into slab;
secure with HILTI HYI50 Injection Adhesive; callfor
inspection to verify embedment and adhesive prior to
placement
F'INAL INSPECTION
Page2of 2
$*e/
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION:
SITE ADDRESS:
PROJECT NAME:
CONTACT PERSON:
PERMIT NUMBER:
CONTRACTOR:
Jne- PH
.o
ONE:4 41r -^q
lpD
2
TYPE OF'INSPECTION:
tr APPROVED
Call fo
! APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections
checked at next inspection
Inspector Date
Approved plans and permit cord must be on-sile and availoble at time of inspection. A re-inspeclion fee may
be assessed if work is not ready.for inspection.
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER
SITE ADDRESS:
CONTRACTOR:
I
DATE OF INSPECTION:
Ornail-lDr)
d
Ai'z #i l*,n tnt: -=to-t"r47WORKSITE OR CELL PHONE #
TYPE OF INSPECTION REQUESTED:
(Vott 4^&,qafiroil^elL-- -() - ./
For inspections, call the Inspection Line at 360-385-2294by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
! APPROVED tr APPROVED WITH CORRECTIONS
NOTED BELOW
! NOTAPPROVED
CALL FOR RE-INSPECTION
BEFORE PROCEEDING
0nUfi\ //ntk- -n
L)D /44t<g{X sFtcJTa^r
tL ctld rL ftp:t*/4 L-
Approved plans and permit card must be on-site and available at time of inspection. A re-inspection
fee may be if work is not ready for inspection.
Inspector Date
\
Acknowledged
c.K ft (At'L
Date
CITY OF PORT TOWNSEND
PERMIT ACTIVITY LOG
PERMIT #05 _ ztl DATERECEIVED: trO .ZI- OS
A nl[.P 61O ::l J- pl>T)n€#
tb -zt|-E Entered into TRIPS sr
ESA - to Planning -no evidence of ESA-
Vested Date
Checked for Completeness
rulnlos lluu't fitrrrx,
dq'lr's
i-? oZn
/:/r)
/t/s
8l>/ n r,lA LLEN /wk1 Tb ',/+e {tz" ElJ(p tltuLiltOFF $i.l httsq'f.-N /# SP r.c'llTd^.J 3 #o,--
u-lzunUm.- A,tre#o eL\Krct{-
K'z<'Dz -klg-ns&e$ed.vp iru BMK .qF
v
\\B cdjermits\forms\BUllDlNG\Permit Activity Log. doc
FIELD REPORT NO: 72276
#Krazara & ASSOCTATES,tNC.
GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECIION
DATE:April 13, 2007 CONTRACTOR: General Dvnamics
PROJECT #: 106-07087 PERMIT NO.
PROJECT: WA 709 INSPECTOR: Penn
LOCATION:2911 PtT WA SD : Jefferson
KRAZAN PROJECT MANAGER: JONB WEATHER: Overcast TEMP:
Inspected completed installation of 3/8" expansion anchors for equipment cabinet. Verified anchor size
and embedment conformed to design drawings. Verified installation torque met manufacturer's
requirement.
Visually inspected ice bridge support clamps. All piles of galvanized U-bolt bracket and nut assembly
appear to be drawn fully together in a snug tight condition.
The above work is acceptable to the best my knowledge, information, and belief, based on the extent of
services performed and that all work has been completed and is in accordance with the contract
documents, and design requirements as noted in the site construction drawings.
&,;b <frtf,z
fc('
t,ttL e,r- ztl4
qlr
To my best of knowledge, the above WASMAS NOT performed in accordance with the approved plans, specifications, and regulatory
requirements.
SuperintendenVRepresentative:Technician:
Serving the Western United States
l50l l.icld llcpott..ktc lililildt I
Iwclirc l)ilc. 5:5 05
2W
EXPIRE9