HomeMy WebLinkAboutBLD99-239
Permit
#BLD99-239
CITY OF PORT TOWNSEND
CONSTRUCTION PERMT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD99-239 Issued: 11/30/99 Parcel Number: 992906005
Owner/Contractor: Sea Breeze Center Inc. Installer: Kozelisky's Home Service
Job Address: 545 Hendricks #3 Zoning: Cll Type: V-N Occupancy: R-3
Total Occupant Load: NA Nature of Work: Set Manufactured Home
GENERAL CONDITIONS APPLY - SEE LAST PAGE
SEPARATE PERMITS REOUIRED:
Electrical — Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS APPROVED\[DATE
FLOOR (prior to skirting)
Loose stack CMU blocking per ANSI A225.1.
Manufactured Homes Installation.
Listed Cross Drive Anchors per ANSI A225. I
manufactures installation instructions.
Area around home graded to provide runoff away from
home
Vapor Barrier-Black 6mil visqueen
PLUMBING:
Water Supply — Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to
home, min. % " diameter, same as supply pipe
Pressure Reduction Valve if > 80 psi
Hose Bibs (bckflw pro. req'd)
Pipe Insulation — Outside & in crawl space
Pressure Test — 100 p.s. i. for 15 minutes
Pressure relief valve drain - to exterior ofskirting,
exhaust downward between 6" and 24 " above ground
I
Drainage Piping — sloped min. L"/ft.
of 3
for
Call hours before dig utility line
48 you locates
1-800-424-5555
Page 1
Permit
#BLD99-239
REQUIRED INSPECTIONS APPROVED/DATE
SKIRTING:
1
No holes or gaps greater than /4 " allowed in skirting.
Skirting to be ratedfor contact with earth if backfill is
involved. Crawl space ventilation per installation
manual@ 1/150sf; located close to corners, on at least
two opposing sidesfor cross ventilation. Crawl space
access must provide access to all areas under home;
minimum 18 " x 24" unless specified otherwise; covered
with vinyl, p. t. wood or metal.
Dryer vent to the exterior of skirting.
FNAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number
Plumbing
Mechanical
Final — Building
GENERAL CONDITIONS
1.
Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2.
Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently
stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3.
All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
of 3
4.
Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5.
Re-inspection is required after any corrections are completed.
for
Call hours before dig utility line
48 you locates
1-800-424-5555
Page 2
Permit
#BLD99-239
6.
The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press
3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior
to scheduling the Building Department's final inspection.
7.
Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8.
All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9.
POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
of3
for
Call hours before dig utility line
48 you locates
1-800-424-5555
Page 3
CITY OF PORT TOWNSEND
PERMIT ACTIVITYLOG
PERMIT # DATE RECEIVED: ///z?/qq
SCOPE OF WORK:
0b, IQ ho
-INITIALS
Received and entered into TRIPS
1 28
ESA logged
s
Vested Date
Activity Log.doc
Waterman & Kaa
Building 181 Quincy St,
Suite 301 Port
Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 379-6923
City ofPort Townsend
RESIDENTIAL BUILDING PERMIT APPLICATION
FOR NEW CONSTRUCTION, REMODELS & ADDITIONS
/LDrtas#3
Property Street Address
C
Zoning District
Parcel #
BlockLot(s)
Legal Description: Addition
Legal Owner's Name
Mailing Address
100
City, State, Zip
Phone
s)
Contractor's Name
Mailing Address
Phone 38S- s-
Vo?ÉcS) ?
State License Number
City Business License Number
/ SOO . oo
Estimated Value of construction $
Financed By
Date Work is to Begin (Il/' ? Date Work is to be Completed / 'C)
Scope of Work:
Please check all items that apply for the type of building permit you are requesting:
Page 4
of
1
BULDNG
OF
PORT WNSEND RESIDENTIAL PERMIT APPLICATION FOR
CONSTRUCTION, REMODELS &
TA
crry
Al r10NS
Property Site Area/Coverage Information:
1 . The total area of the property in square feet:
2. The total area covered by existing and proposed structures in squar eet:
(total ground coverage from the outside of walls or supporting members)
Percentage of lot coverage: (2 + 1)
Impervious Surfaces:
Please provide the square footage of the roqf area of the proposed and existing structures, and the square footage
of the total area covered by porches, walkways patios and driveways. Do not include decks allowing drainage to
earth below.
Proposed House Roofprint sq. ft:
Existing House Roofprint sq. ft:
Proposed Garage Roofprint sq. ft:Existing Garage Roofprint sq. ft:
Proposed Porch/Walkway sq. ft:Existing Porch/Walkway sq. ft:
Proposed Driveways sq. ft:Existing Driveways sq. ft:
Other (describe).Other (describe):
Total Proposed Impervious sq. ft:Total Existing Impervious sq. ft:
Page 4
of
2
BULDNG
OF
PORT WNSEND RESIDENTIAL PERMIT APPLICATION FOR
CONSTRUCTION, REMODELS &
Total Proposed + Existing sq. ft:Percentage Impervious: *
(Impervious surface + lot sq. ft)
*If total impervious surface exceeds 40% of the lot area, you must submit a written stormwater plan to address
run-off.
Please check which plans you are submitting with this application (2 sets needed):
Site PlanInterior & Exterior Wall Bracing (panel
locations shown on floor plan)
Drainage Plan (if over 40%
Typical Wall Framing Details (section from
Impervious)
foundation through roof)
Foundation Plan
Elevations
Floor Plan
1998 WSEC Compliance: Electric Non-electric
Floor Framing Plan
WSEC Construction Checklist
Roof Framing Plan
t1D8Z,.r
Other:
v
CITY AD j10NS
Special Conditions
YES Please check YES or NO as applicable
NO
Is the property within 200 feet of a fresh or saltwater shoreline?
2. Is the property within the Port Townsend Historical District?
3. Is the property located within or adjacent to an environmentally sensitive area?
4. Will this proposal involve any sewer, water or other utility extensions which will, or could
serve vacant properties other than the project site? If yes, please attach information identifying
the utility extensions and sites.
5. Have any special conditions been placed on this property, or has the property been subject to
any conditions on any prior action of the City: e.g. subdivision, short plat, variance, conditional
use permit, street vacation, planned unit development, restrictive covenant, etc? (If yes, attach
copies of appropriate documents.)
Page 4
of
3
BULDNG
OF
PORT WNSEND RESIDENTIAL PERMIT APPLICATION FOR
CONSTRUCTION, REMODELS &
6. Are any properties within 800 feet of the site owned or controlled by the applicant, any
relative or business associate, or any partnership, corporation, or other entity affiliated with
the a licant? (If es, attach list.)
7. Have any of the properties listed in item #6 been developed within the last two years? (If yes,
attach list.)
8. Have you previously discussed this project with a City staff member? If yes, who and when?
Applicant Certification
The applicant hereby certifies to have knowledge of those sections of the Uniform Building Code and the
Port Townsend Municipal Code pertinent to the above project and that the applicant is responsible for
constructing in conformance with these codes; the applicant understands that the permit, if issued, expires in six
months unless work is started; that the permit, after construction has started, will expire after one year if an
inspection is not made to show significant progress on the structure; the applicant agrees to abide by the
ordinances, codes, regulations, restrictive covenants, deed or plat restrictions, and water and sewer plans attached
hereto; the applicant certifies that all information given above and on accompanying plans is complete and
accurate to the best of their knowledge; and the applicant understands that this information will be relied upon in
granting permits and that if such information is later found to be inaccurate any permits may be withdrawn.
The undersigned hereby saves and holds the City of Port Townsend harmless from any and all causes of
action, judgments, claims, or demands, or from any liability of any nature arising from any non-compliance with
any restrictive covenants, plat restrictions, deed restrictions, or other restrictions which may have been established
by parties other than the City of Port Townsend.
CITY
W AJ TIONS
Complete Application
Port Townsend Municipal Code, Section 1 6.04.140, Vested Rights - Substantially Complete Building
Permit Application: applications for all land use and development permits required under ordinances of the city
shall be considered under the zoning and other land use control ordinances in effect on the date a fully complete
building permit application, meeting the requirements identified in this section, is filed with the Building and
Community Development Department. Until a complete building permit application is filed, alt applications for
land use and development permits shall be reviewed subject to any zoning or other land use control ordinances
which become effective prior to the date of issuance of a finat decision by the city on the application.
Page 4
of
4
BULDNG
OF
PORT WNSEND RESIDENTIAL PERMIT APPLICATION FOR
CONSTRUCTION, REMODELS &
An application for a building permit shall be considered complete when an application meeting all of the
requirements of Section 106.3 of the Uniform Building Code, 1 994 Edition, is submitted which is consistent
with all then applicable ordinances and laws. In addition, to be considered complete, such an application must be
accompanied by complete applications for a subsidiary land use or development permits needed, such as a
complete shoreline management permit application and/or complete applications for other discretionary permits
required under the ordinances of Port Townsend. An application for a partial permit under Section 106.4, 1 of
the
Uniform Building Code, 1994 Edition, shall not be considered complete unless it meets ali requirements stated above and
contains plans for the complete structural frame of the building and the architectural plans for the
structure.
Date
For Official Use Only
Building Official ApprovalDate Issued
L) qc/-
Pe mit No.
z3Y
Date
Plan Review Fee $
Receipt
///zq/q
Water/Sewer SDC $
DateReceipt No.
DateReceipt No.
Balance Due $ / r. 70
Applicant/Representative Signature
Date Received
Page 4
of
5
Rr\\DENTIAL BUILDING
Se_q
O
CHE RLIST
NAME OF Building Permit No.
BLD 99- 7.
Date
BUILDING REVIEW
Completed Application
PUBLIC WORKS
DEPARTMENT
Completed Checklist
Street
Improvement Permit
ZoningTier
and Utility
Routed to Public Works
Development/
House Number
with Site Plan only:
Minor
Energy Code
Checklist
Technical Conference
Temp Erosion / Sediment Control
Compliance
Drainage Plan (if impervious > 40%)
e
Plot Plan-c Ccotf&
PLANNING REVIEW
Floor Plan Æ.S.A. Questionnaire
Wall Bracing (Need 2 sets) Routed to Planning
Typical framing Details Special Conditions:
Restrictive Covenant
Foundation Plan
•
Lots of Record Review
Front Elevation
Parking
1-800-647-0982, press 1, then 2
Verification of Contractor's License: State
Building
City ext 1112
Permit Fee
Floor Breakdown:
Building permit Fees Checklist
(2000) a 20Plan Review Fee (2010)
State Building Code surcharge (2005)
@lus $2.00/unit for multi-family) (2005)
House Number (2200)
Street & Utility Develo ment Permit
Breakdown: (2164 (1201) (1361) (1401)
treet Water Sewer Storm
Technical Conference Credit
Breakdown: (2166) (1203) (1363) (1403)
Street atec Sewer Storm
Public Works Inspection
Breakdown: (2165) (1202)(1362) (1402)
Street Water Storrn
Stormwater Drainage Reserve Charges (1400)
Water Meter Installation (1200): drop-in live-tap
Water SDC (1260)
Sewer SDC (1360)
Other Service Fees
Due
TOTAL AMOUNT DUE Checklist Complete
BCD_permits\\permits\\forms\\reschecklist.doc 4/26/99
ICATE RECEIPI
$82 .80