HomeMy WebLinkAboutBLD05-010
Erosion/Sediment Control Plumbing/Top Out Propane/Wood Appliance
Manufactured Home Set-up
a Setbacks/F00tings/UFERa Propane Pipe/Pressure Test
Foundation Wallsu Propane Tank/Line Fire Department
Footing Drainageu Mechanical Temporary Occupancy
a Fees Paid
Slab/lnterior Footing/lnsulationu Framing
Groundwork/Plumbing Testu Insulation
Final Occupancy
Underfloor Framing Other/Consultation
C) Interior Shear/BWP Nail
Ext. Shear Wall/Holdowns Drywall/Fire Wall
PERMIT
Site Address
Contractor
Owner
Date
of
Phone#
Worksite
Additional fees may be assessed for multiple re-inspections. For Re-
inspection, call Inspection Message Line at 360) 385-2294 prior to 8:00 AM. (NO OCCUPANCY
UNTIL APPROVED BY DSO.
OCCUPANCY REQUIRES WRITTEN APPROVAL BY DSO.)
s
and
and card be on-site available at time of ins ection.
Approved pl permit must
Inspector Acknowledged by
CITY OF PORT TOWNSEND
PERMITACTIVITYLOG
\[2
o
PERMIT # DATE RECEIVED: (113 I s-
SCOPE OF WORK:
Q c)ao
( -P
in
Sl _
ade
DATEACTIONINITIALS
---
Entered into TRIPS
scu
ESA — to Planning -no evidence of ESA-
Vested Date
Checked for Completeness
CA (l Gil
ScD
i
' 16
lyflil/
li(fdL
a dd.—t
6
Scu
3
31
\\\\Bcd_permits\\forms\\BUILDING\\Permit Activity Log,doc
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379-5086 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD05—010 Issued: 03/31/05 Parcel Number: None - Built In City ROW
Job Address: Spruce and W Streets Zoning: R-III Type: V-N Occupancy: N/A
Nature of Work: Construct bus transit shelter for Madrona Village in the right-of-way
Owner: Madrona Village/City of Port Townsend Contractor: OED Builders - OEDBUL*043D1 385-
5743
GENERAL CONDITIONS APPLY - SEE NEXT PAGE
RE UIRED INSPECTIONS APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See General Condition No. 2 Silt
Fence as needed
Drive Off Mat to restrict sediment from leaving the
site
FOOTING —per architect/engineer design
Setbacks
Footings
Forms
Reinforcement
Column Bases
SLAB —
Reinforcement
Call 48 hours before you dig for utility line locates
1-800-424-5555
1 1
Page
of
FRAMING —per architect/engineer design
All engineering connections require inspection prior
to cover
Posts - 6 x 6 sidewall and endwall per engineering
Cords — 4 x 6
Positive Connections
Bracing
Strapping
Continued next a e
Permit BLD05-.010
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING (continued from page 1)
Rafters
Blocking
Bolts
FINAL
Barrier Free Design
Final — Building
GENERAL CONDITIONS
1.
Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2.
Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt
& debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3.
All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4.
Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Call 48 hours before you dig for utility line locates
1-800-424-5555
2 2
Page
of
5.
Re-inspection is required after inspection report corrections are completed.
6, The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294.
A minimum of twenty-four hours notice is required. Public Works approval must be received
prior to scheduling the Building Department's final inspection.
7.Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a
non-residential project.
8.All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
Permit # BLDOS-OIO
9.Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10.POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
3 3
Page
of