HomeMy WebLinkAboutDevelopment Services Fees 2014 - CurrentRef
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
2
Additional Review Fees,
the base permit fee is a
minimum; if actual staff
review time is exceeded,
the city will notify the
applicant and begin billing
at $76/hr.(1)
$76 per hr. 76 per hr.
3 Binding Site Plan, Mixed
Use/ Commercial I-A $1,520.00 20 $30.40 $10.00 $1,560.40
4
Binding Site Plan,
modification or amendment I $456.00 6 $9.12 $10.00 $475.12
5
Binding Site Plan,
Residential (includes
Cottage Housing)I-A $456.00 6 $9.12 $10.00 $475.12
COMPREHENSIVE PLAN
BINDING SITE PLAN
ADDITIONAL REVIEW FEES
Land Use Fees
Land Use Fees - Fees associated with land use and planning services shall be as specified in the table below. In
general, fees are calculated as follows: Land Use Base Fee (as listed in Part A) + SEPA(State Environmental Policy
Act) Fee, if applicable (Part B) + Noticing Fees (Part C) = Total. Please note that each application is unique and
thus, actual costs may vary.For example: 1) The base permit fee in Part A and B is a minimum fee- if actual staff
review time is exceeded, the City will notify the applicant and begin billing at $76/hr. 2) Review by City Engineering
Department Staff of land use projects will be billed at $76/hr to cover actual costs incurred. Estimates will be made
available upon request. 3) Any costs incurred from the need to use outside consultants shall be in addition to fees
listed and are the responsibility of the applicant. 4) The City charges $500 upfront for applications requiring a
hearing before the Hearings Examiner. If the actual cost is less or more the difference will be refunded or billed. 5)
Any recording fees incurred shall be the responsibility of the applicant . 6) Minimum fees are paid at time of
application; any additional fees must be paid within 30-days of billing unless the City pre-approves other
arrangements. The City may place permits on hold and the application processing timeline may be held in
abeyance pending payment of fees. 7) See footnote 1 on page 18 for process if fees are disputed.
PART A – LAND USE PERMIT BASE FEE
DEVELOPMENT SERVICES FEE SCHEDULE
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
6
Comprehensive Plan -
Formal Amendments by
Government/ jurisdiction
(Rezones or Subarea Plan
Amendments or Shoreline
Master Program
Amendment). NOTE:
Applications will require
third party review. Contact
city staff to determine
applicable fees.
V TBD TBD TBD TBD TBD TBD
7
Comprehensive Plan -
Formal Amendments by
non-government/
jurisdiction (Rezones or
Subarea Plan Amendments
or Shoreline Master
Program Amendment).
NOTE: Applicant must
also pay for SEPA, see
page 12.
V $760.00 10 $15.20 $10.00 $785.20
8
Comprehensive Plan
Amendment, Suggested V
No charge -
may or may not
get on the
docket
9
Conditional Use, Major.
See definition in PTMC
17.08.020.III $1,900.00 25 $38.00 $10.00 $500.00 $2,448.00
10
Conditional Use, Minor.
See definition in PTMC
17.08.020.II $532.00 7 $10.64 $10.00 $552.64
11 Conditional Use
Modification II $228.00 3 $5.00 $10.00 $243.00
12 Cottage Housing, R-I Zone III $2,280.00 30 $45.60 $10.00 $500.00 $2,835.60
13
Cottage Housing, R-II Zone
- Administrative Review II $2,280.00 30 $45.60 $10.00 $2,335.60
14
Cottage Housing, R-III
Zone - Administrative
Review I-A $2,280.00 30 $45.60 $10.00 $2,335.60
CONDITIONAL USE
COTTAGE HOUSING
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
15
Critical Area - Major. See
definition in PTMC
19.05.040.II $760.00 10 $15.20 $10.00 $785.20
16 Critical Area Advance
Determination II $152.00 2 $5.00 $7.50 $164.50
17
Critical Area Reasonable
Use Exception. NOTE:
The base fee is in addition
to the Major Critical Area
permit and shall not be
halved.
II $380.00 5 $7.60 $10.00 $397.60
18
Critical Area Waiver. Per
PTMC
19.05.040.E.j:(footnote 4
page 18)
I $152.00 2 $5.00 $7.50 $164.50
19
Critical Area, Minor. See
definition in PTMC
19.05.040. I $380.00 5 $7.60 $10.00 $397.60
20
Design Review -
Administrative only per
PTMC 17.30.020(4)I-A $38.00 0.5 $5.00 $3.00 $46.00
21 Historic Residential
Departure Request:$0.00 $5.00 $3.00 $8.00
22
Design Review –
Administrative Only
Secondary Home
I-A $76.00 1 $5.00 $3.75 $84.75
23
Design Review –
Administrative Only Primary
Home I-A $76.00 1 $5.00 $3.75 $84.75
24
Design Review –
Administrative only Pivotal
Home I-A $76.00 1 $5.00 $3.75 $84.75
25 Secondary Home II $152.00 2 $5.00 $7.50 $164.50
26 Primary Home II $152.00 2 $5.00 $7.50 $164.50
27 Pivotal Home II $152.00 2 $5.00 $7.50 $164.50
DESIGN REVIEW
CRITICAL AREAS
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
28
Design Review- Minor
Requiring HPC Committee
review per PTMC
17.30.020
1-A $76.00 1 $5.00 $3.75 $84.75
29
Design Review - Major
Commercial and Major
HPC Review - Note: all
commercial projects in
excess of 10,000 square
feet are considered Major
projects.
II $760.00 10 $15.20 $10.00 $785.20
30 Pivotal Home II $152.00 2 $5.00 $7.50 $164.50
31
Multi-family Review - Track
1 per definition in PTMC
17.46.030 I-A $228.00 3 $5.00 $10.00 $243.00
32
Multi-family Review - Track
2 per definition in PTMC
17.46.030 I-A $760.00 10 $15.20 $10.00 $785.20
36 Special Valuation:
37 Residential I-A $76.00 1 $5.00 $3.75 $84.75
38 Commercial I-A $304.00 4 $6.08 $10.00 $320.08
39 Home Occupation I $228.00 3 $5.00 $10.00 $243.00
40
Long Plat Amendment/
Alteration - Major - See
definition PTMC 18.16.090 III $1,900.00 25 $38.00 $10.00 $500.00 $1,948.00
41
Long Plat Amendment/
Alteration - Minor- See
definition PTMC 18.16.090 I $380.00 5 $7.60 $10.00 $397.60
42 Long Plat Extension III $380.00 5 $7.60 $10.00 $397.60
43 Long Plat, Final IV $760.00 10 $15.20 $10.00 $785.20
44
Long Plat, Preliminary -
Final plat fee will be paid
later (see Long Plat, Final)III $3800 + $50
per lot 50 Minimum $76 , but
depends on total #
of lots
$10.00 $500.00
3886 minimum
plus number of
lots and SEPA
fees
LOT LINE ADJUSTMENT
HOME OCCUPATION
LONG PLAT
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
45
Lot Line Adjustment Type I
- no reorientation; move lot
line in parallel I $304.00 4 $6.08 $10.00 $320.08
46 Lot Line Adjustment Type
II II $456.00 6 $9.12 $10.00 $475.12
47 Lots of Record (2 - 9 lots)I-A $304.00 4 $6.08 $10.00 $320.08
48 Lots of Record (single lot)I-A $152.00 2 $5.00 $7.50 $164.50
49 Plat Vacation III $1,976.00 26 $39.52 $10.00 $500.00 $2,525.52
50
PUD (Planned Unit
Development) -
Preliminary. PUDs are not
subject to associate
subdivision fees (short plat,
long plat, binding site plan).
Fee for "PUD Final" to be
paid later.
III $3800 +$50 per
lot 50 Minimum $76 , but
depends on total #
of lots
$10.00 $500.00
$3,886
minimum plus
number of lots
and SEPA fees
51
PUD Amendment/
Alteration - Major (as
defined in PTMC
17.32.130).
III $1,900.00 25 $38.00 $10.00 $500.00 $2,448.00
52
PUD Amendment/
Alteration - Minor (as
defined in PTMC
17.32.130).
I $380.00 5 $7.60 $10.00 $397.60
53 PUD, Final IV $760.00 10 $15.20 $10.00 $785.20
54
Recording Fees - the
applicant shall pay the cost
of all recording fees.Actual Cost
55 Shoreline Exemption I-A $228.00 3 $5.00 $10.00 $243.00
56
Shoreline Master Program
Amendments. See
Comprehensive Plan
Amendment
V $3.00
57
Shoreline Substantial
Development Permit -
Conditional `III $912.00 12 $18.24 $10.00 $500.00 $1,440.24
LOTS OF RECORD
RECORDING FEES
SHORELINES
PLANNED UNIT DEVELOPMENT (PUD)
PLAT VACATION
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
58
Shoreline Substantial
Development Permit -
Minor as defined in SMP
Section 10.4.1
II $608.00 8 $12.16 $10.00 $630.16
59
Shoreline Substantial
Development Permit -
Major as defined in SMP
Section 10.4.1
III $760.00 10 $15.20 $10.00 $500.00 $1,285.20
60
Shoreline Variance, Minor.
(See definition SMP 10.7.2)II $608.00 8 $12.16 $10.00 $630.16
61
Shoreline Variance, Major.
(See definition SMP 10.7.3)III $608.00 8 $12.16 $10.00 $500.00 $1,130.16
62 Shoreline Permit Revision II $228.00 3 $5.00 $10.00 $243.00
63 Short Plat Amendment I $456.00 6 $9.12 $10.00 $475.12
64 Short Plat Approval, Final
for 3-9 lots I $760.00 10 $15.20 $10.00 $785.20
65 Short Plat Extension II $228.00 3 $5.00 $10.00 $243.00
66
Short Plat Preliminary - 2
lots. Note: Final Plat fee
included in these fees.II $456.00 6 $9.12 $10.00 $475.12
67
Short Plat, Preliminary - 3 -
9 lots. Will also need to
pay Short Plat Final fees.II $2,736.00 36 $54.72 $10.00 $2,800.72
68
Sign Permits (Note: if in
Historic District, Design
Review is also required)
I
$76 first sign +
$10 for each
additional sign
under same
application
1 $5 (or more for
more signs)
$3.75 (or more
for more signs)
$84.75 or
more; $50
added for plan
review of
monument or
projecting
signs).
SIGN PERMIT
SHORT PLAT
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
69
Departure Permanent
II
$152 + $10 for
each additional
sign under
same
application
2 $5 (or more for
more signs)
$7.50 (or more
for more signs)
164.5 (or more
for more signs)
70
Seasonal Temporary Sign
Departure (up to 9 months)
II
$76 plus $10
for each
additional sign
under same
application
(max. of 7)
1 $5 (or more for
more signs)
$3.75 (or more
for more signs)
$84.75 (or
more for more
signs)
71
Temporary Sign Departure
(15 days or less)
II
$38 plus $5 for
each additional
sign under
same
application
(max. of 7)
½ $5 (or more for
more signs)
$3 (or more for
more signs)
$46 (or more
for more signs)
72
Sims to Kearney LIS (Local
Information Sign) Project
and M.I.S. (Merchant
Information systems)
program - Annual fee
-
$76 Annual fee
in addition to
sign permit
-1 $0.00 $0.00 $76.00
73 Sign Variance II $228.00 3 $5.00 $10.00 $243.00
74
Street Vacation (Appraisal
Deposit of $750 to be
made by separate check
and receipted in Finance
w/cover memo. Proceeds
to be used to pay for
appraisal.).
V $456.00 6 $9.12 $10.00 $475.12
75 Temporary Use I $114.00 1.5 $5.00 $5.75 $124.75
75A
Temporary Use re-
established from prior year,
no change I $76.00 1 $5.00 $3.75 $84.75
76
Street Vendor –
**Plus annual permit fee of
$350.00
$76.00 1 $5.00 $3.75 $84.75
77 Tree Conservation Permit
Approval:
TREE CONSERVATION
TEMPORARY USE
STREET VACATION
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
78
Affecting 40,000 square
feet land area or less II $152.00 2 $5.00 $7.50 $164.50
79
Affecting in excess of
40,000 square feet land
area but not exceeding
five acres II $380.00 5 $7.60 $10.00 $397.60
80 Affecting land area of five
acres or II $760.00 10 $15.20 $10.00 $785.20
81
Tree Removal - Forest
Practice (Combined with
statement of intent not to
convert commercial forest
lands PTMC 19.06.060 E)
I-A $76.00
1
$5.00 $3.75 $84.75
82 Tree Permit/Plan - Minor
Modification to Approved I-A $152.00 2 $5.00 $7.50 $164.50
83 Tree Removal - Written
Exemption I-A $76.00 1 $5.00 $3.75 $84.75
84
Variance, major - (new
buildings). NOTE: this is
not a Shoreline variance.
See Variance definition in
PTMC 17.08.070.
III $1,900.00 25 $38.00 $10.00 $500.00 $2,448.00
85
Variance, minor (existing
buildings). See Minor
Variance definition in
PTMC 17.08.070.
II $532.00 7 $10.64 $10.00 $552.64
86 Wireless Facility I $228.00 3 $5.00 $10.00 $243.00
87 Wireless Facility II $760.00 10 $15.20 $10.00 $785.20
88 Wireless Facility III $3,420.00 45 $68.40 $10.00 $500.00 $3,998.40
89
Zoning/Land Use Code
Text Revisions - NOTE:
applicant must also pay for
SEPA
v $760.00 10 $15.20 $10.00 $785.20
PART B – SEPA
89 SEPA Addendum $304.00 4 $6.08 $10.00 $320.08
WIRELESS FACILITY
ZONING / CODE REVISIONS
VARIANCE
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
90
SEPA Checklist review for
short subdivisions and
other exempt projects, if
DSD Director believes may
include non-SEPA exempt
actions ($ to be credited)
$76.00 1 $5.00 $3.75 $84.75
91
SEPA Environmental
Checklist Threshold
Determination, Major
Type III
parent file $1,216.00 16 $24.32 $10.00 $1,250.32
92
SEPA Environmental
Checklist Threshold
Determination, Minor
Type I or II
parent file $608.00 8 $12.16 $10.00 $630.16
93
SEPA Environmental
Impact Statement (EIS);
see PTMC 19.04 Article IV.
(plus consultant costs.)$760.00 10 $15.20 $10.00 $785.20
PART C – LAND USE NOTICING FEES
Noticing is based
upon the Highest
permit type (in Part
A) and whether or
not SEPA is required
(Part B).
Notice
Board
Deposit
Paper
Notice -
NOA
Mailing
Second
Notice -
SEPA
Threshold
Determinati
on
Third
Notice -
Hearing
Total
94
Type IA/ I typically no notice
unless, see below $0 $0.00 $0.00 $0.00 $0.00
95
Type IA, I (involving
multifamily design review 5-
9 units, R-III Cottage
Housing, or SEPA) (If
SEPA is not required or if
Optional DNS process is
used, Waive $100 Second
Notice)
$30 $150.00 $75.00 $100.00 $355.00
96 Type II $30 $75.00 $105.00
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
97
Type II (involving shoreline
permits, cottage housing,
short subdivision or SEPA)
(If SEPA is not required, or
if the Optional DNS
process is used, Waive
$100 Second Notice)
$30 $150.00 $75.00 $100.00 $355.00
98
Type III (includes NOA,
SEPA Threshold, Hearing
Notice) (If SEPA is not
required, or if the Optional
DNS process is used,
Waive $100 Second
Notice)
$30 $150.00 $75.00 $100.00 $100.00 $455.00
Noticing is based
upon the Highest
permit type (in Part
A) and whether or
not SEPA is required
(Part B).
Notice
Board
Deposit
Paper
Notice- NOA Mailing
Second
Notice -
SEPA
Threshold
Determinati
on
Third
Notice-
Hearing
Total
99 Type IV $0 $0.00 $0.00 $0.00 $0.00
100 Type V - Site Specific $30 $150.00 $75.00 $100.00 $100.00 $455.00
101 Type V – General $0 $150.00 $0.00 $100.00 $100.00 $350.00
102 Type V- Street Vacation $30 $150.00 $25.00 $205.00
103 SEPA Addendum requiring
notice $75.00 $100.00 $175.00
104
Additional Notice and
publication - required by
changes initiated by
applicant
$0.00
PUBLIC WORKS ENGINEERING PERMIT & INSPECTION FEES
105 Project Review of Land Use
Permit Applications $76 /hr
106 Permit Fee $228.00 3 $5.00 $10.00 $243.00
107 Plan Review (plus
$76/hr over four hrs.)$304.00 4 $304.00
108
Inspection Fees (the
engineer of record shall
provide a cost estimate)
2% of
estimated
project costs
STREET / SITE DEVELOPMENT PERMIT (SDP)
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
109 Permit Fee $152.00 2 $5.00 $7.50 $164.50
110 Re-Inspection for
corrections
111
Latecomers Agreement
Processing Fee (plus
$76/hr. over four
hrs)(County Recording
fees are not included)
$304.00 4 $304.00
112 Inspection not
specifically listed $76/h.r
113 Plan review for changes
to approved plans $76/hr.
ADMINISTRATIVE FEES
114
Appeal fee for
administrative decision
(plus $76/hr over four hrs).
(Hearing Examiner fee may
also apply - see below)
I, I-A,
IISEPA $304.00 4 $6.08 $10.00 $320.08
115
Appeal to Hearings
Examiner (if the actual cost
is less or more the
difference will be refunded
or billed. (Appeal fee also
applies - see above)
I, I-A, II $0.00 $500.00 Actual Cost
116
Technical Conference –
Public works – If actual
staff review time exceeds 5
hrs., additional staff time
will be billed at $76/hr.
$380.00 5 $380.00
117 Technical conference – one
year extension $76.00 1 $76.00
118 Variance under PTMC
Titles 12 and 13 $304.00 4 $304.00
MINOR IMPROVEMENT PERMIT (MIP)
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
119
Waiver request under
PTMC Title 12 and 13 $152.00 2 $152.00
120 Water Reservation –
County $380.00 5 $380.00
OTHER FEES
122 Additional Inspection Fees
(per site visit)$76.00 $76.00
123 Addressing (per address
assigned)$38.00 $38.00
124 Accessory Dwelling Unit:-
125 Address $38.00 $38.00
126 Inspection $76.00 $76.00
127 Notice to Title $76.00 $76.00
128
Customer Assistance
Meetings (CAM) (plus
$76/hr over two hrs) (5)
$152.00 2 $152.00
129 Director's Interpretation $150.00 $150.00
130 Recording Fees Actual Cost
31
Legal Document
preparation (minimum fee
plus $100 per hr for any
City Attorney time)
$76.00 $76.00
132
Letter to Assessor , Zoning
Compliance Letter, or
Statement of Restrictions
(Plus $76/hr. for each
additional hour of staff
time.)
$76.00 $76.00
133
Pre-application, for projects
that will require Type I or II
permits (plus $76/hr over
three hrs)
I or II $228.00 3 $228.00
134
Pre-application, for projects
that will require Type III
permits (plus $76/hr over
five hrs)
III $380.00 $5.00 $380.00
135 Waiver Request (per item;
unless specified elsewhere)$228 $228.00
FOOTNOTES
Ref
#
Land Use Permit
Name
Type Base Permit
Fee
Staff Time
Allotted
(Hours)
2% Tech Fee
- $5 min.
5% Record
Fee
$3 - $102
Hearing
Examiner
Total
City of Port Townsend
Fee List ~ 2014
City of Port Townsend, Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
Phone: 360.379.5095 www.cityofpt.us Fax: 360.344.4619
136
(1) Should fees or hourly charges be contested by an applicant, the first recourse is with the Department Head.
Should the Department Head find that the City acted appropriately and that the allegation has no merit, s/he
shall respond in writing to the applicant stating the basis for denial of the claim. This written response
constitutes an administrative decision appealable to the Hearing Examiner pursuant to PTMC Chapter 20.01.
In the event the Hearing Examiner finds substantially in favor of the applicant, the cost of the Hearing Examiner
and appeal fee is paid by the City (and Hearing Examiner and appeal fee paid by the applicant would be
refunded).
(2) Record Retention fee is 5% of the fee rounded to the nearest 25¢ pursuant to PTMC 2.76.031
(3) The City charges $500.00 upfront for applications requiring a hearing before the Hearings Examiner. If the
actual cost is less or more the difference will be refunded or billed.
(4) For critical areas, development proposals which contain only aquifer recharge areas, frequently flooded
areas or seismic hazard areas, the director may waive compliance with the application requirements and
delineations requirements of this section and compliance with the performance standards for development
contained in PTMC 19.05.060. The director must be satisfied that the performance standards provided for in the
individual critical area regulations for a specific environmental category are met and no purpose established
under this chapter would be furthered by requiring compliance with application requirements or the performance
standards for development.
(5) One-half of the $152 base fee (i.e., $76.00) may be credited to a subsequent, associated pre-
application/land use application if submitted within 12 months of the CAM.