Loading...
HomeMy WebLinkAboutPublic Works Fee List 2016 - CurrentDevelopment Services Department 250 Madison Street, Suite 3 Port Townsend WA 98368 Phone: 360-379-5095 Fax: 360-344-4619 www.cityofpt.us G:/DSD/Fees/Public Works Fee List 2016 1 of 2 pages Revised 08/19/2016 Public Works Infrastructure Fee List 2016 BASIC FEES Street Development Permit (SDP) $ 243.00 SDP– Plan Review 1 $ 304.00 SDP- Engineering Inspection Fee2 2% of construction costs Minor Improvement Permit (MIP) $ 164.75 MIP – Engineering Inspection Fee 4 $ 76.00 minimum System Development Charge (SDC) – Water $ 4,494.00 System Development Charge (SDC) – Sewer $ 3,758.00 City - Fees for ¾” Meter Water Meter – Tap into Main Line 3 $ 1,070.00 Water Meter – Drop In $ 135.00 County – Fees for ¾” Meter Water Meter –Tap Into Main Line – County 3 $ 1,335.00 Water Meter – Drop In – County $ 160.00 Public Works Technical Conference $ 380.00 Public Works Waiver Application $ 228.00 Latecomer Agreement Processing Fee $ 304.00 1 Collected at permit application; covers up to four (4) hours of plan review. Additional review time billed at: $76.00 per hour. 2 Estimated construction costs must be provided on the application form. The inspection fee is 2% of the estimated construction cost. 3 Additional charges based on actual costs for labor and materials may be applied to the meter installation fees shown. These additional charges include, but are not limited to, pavement removal or replacement, existing utility line conflicts and other exceptional conditions. The permit holder will be billed directly by the City’s Water Department for these additional charges, which will have to be paid prior to a final inspection of the project. 4 Plus $76.00 per hour after one hour of staff time. G:/DSD/Fees/Public Works Fee List 2016 2 of 2 pages Water Meter Installation Fee List 2016 5/8” X ¾” – Dig*** City $1,070.00 County $1,335.00 1” – Dig*** City $1,180.00 County $1,380.00 Dual Service (includes one meter only) - Dig*** City $1,240.00 County $1,505.00 1-1/2” – Dig*** City $2,000.00 County $2,200.00 2” – Dig*** City $2,275.00 County $2,475.00 5/8 x ¾” – Drop In City $ 135.00 County $ 160.00 1”- Drop in City $ 185.00 County $ 215.00 1-1/2” – Drop in City $ 465.00 County $ 480.00 2” – Drop in City $ 615.00 County $ 630.00 Dig*** Additional charges based on actual costs for labor and materials may be applied to the meter installation fees shown with “Dig***” in the list above. These additional charges include, but are not limited to, pavement removal or replacement, existing utility line conflicts and other exceptional conditions. The permit holder will be billed directly by the City’s Water Department for these additional charges, which will have to be paid prior to a final inspection of the project.