HomeMy WebLinkAboutPublic Works Fee List 2016 - CurrentDevelopment Services Department
250 Madison Street, Suite 3
Port Townsend WA 98368
Phone: 360-379-5095
Fax: 360-344-4619
www.cityofpt.us
G:/DSD/Fees/Public Works Fee List 2016 1 of 2 pages Revised 08/19/2016
Public Works Infrastructure Fee List 2016
BASIC FEES
Street Development Permit (SDP) $ 243.00
SDP– Plan Review 1 $ 304.00
SDP- Engineering Inspection Fee2 2% of construction costs
Minor Improvement Permit (MIP) $ 164.75
MIP – Engineering Inspection Fee 4 $ 76.00 minimum
System Development Charge (SDC) – Water $ 4,494.00
System Development Charge (SDC) – Sewer $ 3,758.00
City - Fees for ¾” Meter
Water Meter – Tap into Main Line 3 $ 1,070.00
Water Meter – Drop In $ 135.00
County – Fees for ¾” Meter
Water Meter –Tap Into Main Line – County 3 $ 1,335.00
Water Meter – Drop In – County $ 160.00
Public Works Technical Conference $ 380.00
Public Works Waiver Application $ 228.00
Latecomer Agreement Processing Fee $ 304.00
1 Collected at permit application; covers up to four (4) hours of plan review. Additional
review time billed at: $76.00 per hour.
2 Estimated construction costs must be provided on the application form. The inspection
fee is 2% of the estimated construction cost.
3 Additional charges based on actual costs for labor and materials may be applied to the
meter installation fees shown. These additional charges include, but are not limited to,
pavement removal or replacement, existing utility line conflicts and other exceptional
conditions. The permit holder will be billed directly by the City’s Water Department for
these additional charges, which will have to be paid prior to a final inspection of the
project.
4 Plus $76.00 per hour after one hour of staff time.
G:/DSD/Fees/Public Works Fee List 2016 2 of 2 pages
Water Meter Installation Fee List 2016
5/8” X ¾” – Dig***
City $1,070.00
County $1,335.00
1” – Dig***
City $1,180.00
County $1,380.00
Dual Service (includes one meter only) - Dig***
City $1,240.00
County $1,505.00
1-1/2” – Dig***
City $2,000.00
County $2,200.00
2” – Dig***
City $2,275.00
County $2,475.00
5/8 x ¾” – Drop In
City $ 135.00
County $ 160.00
1”- Drop in
City $ 185.00
County $ 215.00
1-1/2” – Drop in
City $ 465.00
County $ 480.00
2” – Drop in
City $ 615.00
County $ 630.00
Dig*** Additional charges based on actual costs for labor and materials may be applied to the
meter installation fees shown with “Dig***” in the list above. These additional charges
include, but are not limited to, pavement removal or replacement, existing utility line
conflicts and other exceptional conditions. The permit holder will be billed directly by the
City’s Water Department for these additional charges, which will have to be paid prior to a
final inspection of the project.