Loading...
HomeMy WebLinkAboutHolcomb; Alley between 29th & 30th Sewer Main ExtensionExisting Discharge to Storm DitchExisting Storm Grates Existing Fire Hydrant 1,500 gpm Existing Fire Hydrant 1,500 gpm SS Existing 8-inch PVC Gravity SS MainLandis Lane W Existing 6-inch PVC Water Main Survey Stake Survey Stake Pre-Existing SS Maintenance Hole Sheet 1 of 1 Sanitary Sewer As-Built Record Drawing SDP17-029 Sparrowhawk (McDowell) Hastings Third Addition Block 20 Lots 1 – 10 Between Holcomb St & Gise St Between 29th St & 30th St Port Townsend, WA 98368 Jefferson County Parcel 957902001 Original Scale: 1 inch = 20 Ft 26' 2.5' 6" Single Sewer Service with Toning Wire (Typical of Eight) Marked with 2-inch PVC Pipe Stake New SS Maintenance Hole with 45º Channeled Elbow Invert: 7.26 ft below rim Compiled by: Everett A. Sorensen, P.E. Streamline Environmental, Inc. 715 Grant Street; Port Townsend, WA 98368-2405 everett@streamlineenv.com 360-821-9960 October 27, 2017 New SS Maintenance Hole with 45º Channeled Elbow Invert: 7.17 ft below rim Newly-Installed Gravity Main Sanitary Sewer 8-inch PVC ASTM D3034 with Typical Invert Depth 6.5 to 7 ft Equipped with Eight Side Service Stubs Newly-Installed Sanitary Sewer 8-inch PVC Vertical Stub-Up with Gasketed Cap Awaiting Final Grading Prior to Completing with Cast Iron Ring and Lid 8.0' 0 80 12040 160 Ft20