Loading...
HomeMy WebLinkAboutBLD99-070 EXPIREDWaterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 CITY OF PORT TOWNSEND Phone: (360) 379-3208 Fax: (360) 379-6923 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Insoection Permit Number: BLD99-070 Issued: 6/24/99 Parcel Number: 948302212 Job Address: 1604 Landes Street Zoning: R -II Type: V -NR Occupancy: R -3/U-1 Total Occupant Load: < 10 Nature of Work: Remodel existin home. Owner: ,Neubauer Michael Contractor: Owner. GENERAL CONDITIONS APPLY — SEE LAST PAGE, SEPARATE PERMITS REQUIRED: Electrical _- Contact 'Labor & Industries @ 360-417-2702 Mechanical - Propane Tank Placement & Exterior Piping RE, UIRED INSPECTIONS PPR0VED/DA"I"E FOUNDATION Engineered Holdowns. See Engineering report for locations Applicant to obtain a Street Dcvclopment. Permit t Prom Public Works Department Prior to Frarnirr Ins, cction FLOOR FRAMING (okay @ framing) Engineered Holdowns-floor to floor connection See Enlineering report for locations PLUMBING: Rough -In (D -V -T & Clean Outs) Water Supply Gas Supply Hose Bibs (backflow protection. required) Pipe Insulation Pressure Reduction Valve if> 80 psi Water Heater 18" A.F.F. Seismic Restraint - 2 places R-10 under if electric on concrete Pressure relief valve drain to exterior Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Perna[ # 13LD99-070 IIT IRE D IN I)ECTION MECHANICAL LPG Heater Combustion Air Venting Whole House Fan Source Specific Fan Environmental Air Exhaust ducting, insulation and terminus located 3" from op(ra FRAMING: Walls Engineered floor to floor connections Engineered Holdowns Engineered Shear Walls Engineered Interior Braced Walls Posts, beams & headers Roof— Engineered truss plan required at framing inspection Attic Venting Ceilings Windows — egress Windows — safety glazing Windows U factor - .60 max. NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window) Fresh Air Intake (Wall Ports) Doors FRAMI —� .. .. NG (continued) Rafter/Truss Pos. Conn. Fire Blocking Firestopping Weather Resistive Barrier INSULATION ...�... Floor (R-30 ) Wall ( R-19 ) Ceiling (R-3 8 ) Vaulted Ceiling (R-30) Baffles Vapor Barrier: paint FINAL LPG (Fire Dept.) Public Works Sign -Off House Number Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 ....... ...... �._ ...... i1cvm Jt # BLD99-070 FINAL (continued) Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final - Building GENERAL CONDITIONS 1. Contractors working, on this project are required to have a Labor & Industries contractor's re istration result in job shut down while this is accomplishd. p number and a Ci business license. Failure to provide roof of this documentation prior to work may 2. "T"emporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. ,Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rigbts-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re -inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minixnurn of twenty-four hours notice is re wired. Public Works approval must be received twior to scbedulin the Buildina Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building, permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 . . . . . . . . . . . C',3 ❑ Dave Peterson ❑ Tom Aumock ❑ Sam Trone Development Review Agenda December 10, 2009 8:30 a.m. ❑ John Merchant ❑ F. Franklin ❑ Bob LaCroix ❑ Alex Angud ❑ John McDonagh ❑ Ken Clow ❑ Suzanne Wassmer ❑ 1. Reid Lot Line Adjustment (McD) 2. Reasonable Use Exemption Properties — Utilities available? 0 0 5. Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD99-070 Issued: 6/24/99 Parcel Number: 948302212 Job Address: 1604 Landes Street Zoning: R -II Type: V -NR Occupancy: R -3/U-1 Total Occupant Load: < 10 Nature of Work: Remodel existing home. Owner: Neubauer. Michael Contractor: Owner GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED- Electrical E U RED:Electrical — Contact Labor & Industries @ 360-417-2702 Mechanical - Propane Tank Placement & Exterior Piping REQUIRED INSPECTIONS APPROVF.DmATF FOUNDATION Engineered Holdowns. See Engineering report for locations Applicant to obtain a Street Development Permit From Public Works Department Prior to Framing Iris ection FLOOR FRAMING (okay @ framing) �✓ Engineered Holdowns-floor to floor connection`"". See En ineerin re ort for locations PLUMBING: Rough -In (D -V -T & Clean Outs) Water Supply Gas Supply Hose Bibs (backflow protection. required) Pipe Insulation Pressure Reduction Valve if > 80 psi Water Heater 18" A.F.F. Seismic Restraint - 2 places R-10 under if electric on concrete Pressure relief valve drain to exterior Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 X MECHANICAL LPG Heater Combustion Air Venting Whole House Fan Source Specific Fan Environmental Air Exhaust ducting, insulation and terminus (located 3' from opening)_ FRANIING: Walls Engineered floor to floor connections Engineered Holdowns Engineered Shear Walls Engineered Interior Braced Walls Posts, beans & headers Ioof— Engineered truss plan required at framing inspection Attic Venting Ceilings Windows — egress Windows — safety glazing Windows U factor - .60 max. NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window) Fresh Air Intake (Wall Ports) Doors FRAMING (continued) Rafter/Truss Pos. Conn. Fire Blocking Firestopping Weather Resistive Barrier INSULATION Floor (R -LO-) Wall(R19) Ceiling (R -L8 ) Vaulted Ceiling (R-30) Baffles Vapor Barrier: paint FINAL LPG (Fire Dept.) Public Works Sign -Off House Number Plumbing Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 PerMA a BLD99-470 M O 00 (0 a "' in fn (A U) w Co CU CU CU CO CU CU CU (O 7 ('r Y y✓^,E�'� fn O O O C O O .O-, _ (n U) co fn fn fn fn fn 0 !n !n E E E E E E a OO CU (O ((O'S (O L E E E Z !�; W in ❑ C6 C6 O O L L CO O O O L L C6 O L CU O L 'CII CV L C6 O L 0 j 0 0 W U U U U U U U '', U 1L r LLL r LLL r L CU O N O O O 'T 'T 'T U 2 2 2 U N N N N`_ COU COO CO6 Z >, T T T T T N E Z N N N N N oJJZ'� C"Ci CNS "" Z Z O O tU' CO cu O Z rL � ° ����������Ut''¢d�U7' O O U, } S93 Y Y t„.". U � M (7 =O :_ O ( J J J J J J J J J J J' J J J J J J O J J J J J J J J J J J CU c0 U U U U, U U C C7 U U U U C U' U ( U J J O OL O I— CL O N N O (IJ O O i} O O cu `O -O Cc6 10 cu Q "O O O _0 'D O O O O CL O ti�J O O O O O 07 O O O Q) O O (L) O cu m cc IO cu to CU.E O M O N C L i C L t C1t CC CL Z CN6 (SCS Ck CL (N9 CHCS O m m $ Ci Z CL CL Z CL,_ Z CL C CL, G. CL CL CC CL Q CL O O _ CO _ = .O U C7d. � .0 CU CO L E cxCL co CM CD a E E— + cu y (- O W = L N E to ( CU i T7 CO E O � L p 0 = N H = LL r—Q. .o U N J "' cu Od' O L m �� N cc LL ,C LO L Q' J cU J ((9 J J fes° V) o 0 z � �� 0 0Z Nzm _ zQ ocu75 C=�CU _ r _.z 00) t O O O O t O r' (n O (A O O r O r N (3A r r r O m W CA O O O O 0 0) m O O (7� O O CR (D C\ (A M O 0 0 0 0 0 0 D) O (A 0 0 0 0 (? ( (}) O O 0 O O (A N -.. N r N ("+I M NN ',N r LO 14, M It M O N N N (n Cl) 0) O M y ((3 N -.... I� O (D N O (O N (D O 00 O N ( N 00 N CL M (D M M (D (D M (D co O (D (D O 1- O I- O OC N M M M M M M COM M M Nr -t�� ti C) O O 0 0 0 0 0 P- � P- � ti r- O O O O ti I- [I- � r -- (A 0 0 0 0 I 0 0 O O CA O (A O O O O O 0 0 0 0 0 0 O O O O O O O O O 0) (?� O O O O (A O (A CA O O O 6� 0 0 0 O (A O) (A a) 0 0 0 0 0' 0 CA 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ D ❑ ❑ 0 0 0 0 0 ❑ ❑ ❑ ❑ 0 0 0 0 0 0 0 6> O O O J J J J J J J J J J J J J ❑ ❑ J J J ❑ H ❑ ❑ ❑ ❑❑ ❑ ❑ ❑ ❑ ❑ mm m m m m m m m,,,m m o� m'm J J J J J J J J J J J J Jm a m m'm m woo m m m'm m'co m co m m CITY OF PORT TOWNSENIC Permit Activity Log /� ' 7 7 Q oa —110 f 1 Mechanical ( ] Miscellaneous [ ] Plumbing [ ] Grading Permit # L J _ s exce4ermlllog Rev. 11/15198 City of Port Townsend Development Services 250 Madison St. , Suite 3, Port Tomisend, WA 98368 (360)379-3208 FAX(36O)344-4619 August 18, 2008 Mr. Michael Neubauer 1322 Caroline St. Port Angeles, WA 98362 SUBJECT: Building Permit — BLD99-070 Dear Mr. Neubauer: I am writing as a follow-up to our rnecting the other day at 1604 Landes and our discussion about theproject. I do understand how diffilcult it can be trying to complete a job of this magnitude and especially with the attention to detail that you are trying to achieve. I sense that you also appreciate that it is difficult to track projects that go; on for years. At the end of our meeting we agreed that you, would have substantial completion by years end, which translates into have the training, plumbing, mechanical and electrical work completed and approved. I will keep the permit active in anticipation ofhaving the inspections ibr this work called fbr and approved prior to the end of December. If it is not possible to have at least this much of the work done I will need to expire the permit and issue a new permit for the completion ofthe lob. As I explained a new permit Would be 'pro -rated' based upon the work to be completed and consideration Would be given, to the past work in terms of code compliance. I wish you the best on completion of the project and look forward to doing an inspection of the work later this year. Sincerely, Leonard Yarber ----z Development Services Director A NATIONAL MAIN STREET COMMUNITY WASHINGTON'S HISTORIC VICTORIAN SE , SEAPORT !PORT ? CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT w PERMIT NUMBER:_-. ADDRESS: CONTRACTOR: lD L) DATE OF INSrECTION. _ _(a z� ��.___..-...... WORKSITE OR CELL PHONE #: r ,,,....... ..,, .......... TYPE OF INSPECTION REQUESTED: wra For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED NOTED BELOW CALL FOR RE -INSPECTION BEFORE PROCEEDING Pff r fniU L ffit Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may be G ,s ,ssed if wo is not ready for inspection. Inspector _ Date Acknowled et q Date PERMIT NUMBER: Site Address Contractor Owner Date of Inspection I iTY OF PORT TOWNSEND' DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT D) . .......... 0 Uj Worksite or Cell Phone# 0,4, �J = c v V I/ 1 1-1 / Y — LI Erosion/Sediment Control P, Ll Plumbing/Top Out ❑ ropane/Wood ia6/ce Ll Setbacks/Footings/UFER Ll Propane Pipe/Pressure Test LJ Manufactured Home Set-up Ll Foundation Walls Ll Propane Tank/Line Ll Fire Department LI Footing Drainage Ll Mechanical LJ Temporary Occupancy Ll Slab/Interior Footing/insulation Ll Framing LJ Fees Paid LJ Groundwork/Plumbing Test Ll Insulation LJ Final Occupancy LJ Underfloor Framing LJ Interior Shear/BWP Nail APher/Consultation LJ Ext. Shear Wall/Holdowns LJ Drywall/Fire Wall Additional fees may be assessed for multiple re -inspections. For Re -inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. (NO OCCUPANCY UNTIL APPROVED BY DSD. . ........ . OCCUPANCY REQUIRES WRITTEN APPROVAL BY DSD.) LJ APPROVED LJ APPROVED WITH CORRECTIONS LJ NOT APPROVED SEE BELOW SEE COMMENT(S) BELOW tAX .V . ........ Z, FIL Lo PVI#5� a ) Approvedlaps and permit card must be on-site and available at time of inspection. Inspector 2. ........... . ............ . . ...... .... ... ....... .......... .... ... . Date -A ........... . . .... Date Acknowledged by ;Ww