HomeMy WebLinkAboutBLD08-1229OT
WA
Project Information
BUILDING PERMI
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Permit Type Commercial Miscellaneous
Site Address 2215 WAS14INGTON ST
Project Description
REPLACE BULKHEAD
Names Associated with this Project
Type
Name Contact
Applicant
Washington Wharf Trust
Owner
Washington Wharf Trust
Contractor
Sealevel Bulkhead Builders
Inc.
Contractor
Sealevel Bulkhead Builders
Inc.
Fee Information
Project Valuation
$K729.00
Building Permit Fee
251.25
Plan Review Fee
163.31
State Building Code Council Fee
4.50
Technology Fee for Building Permit
5.03
Record Retention Fee for Building
10.00
Permit
Total Fees $434.09
Permit # BLD08-122
Project Name REPLACE BULKHEAD
Parcel # 957602701
License
Phone # Type License #
(360) 297-2401 CITY 007584
Exp Date
12/31 /2008
(360) 297-2401 STATE SEALEBB993L 08/21/2009
Project Details
Retaining Wall — Type III
143 SQFT
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. 1 further certify
that I am the owner of the property or authorized agent of thep
ee
Print Name <11J� 4 % , Date Issued: 07/17/2008
Issued By: FRONTDESK
CITY OF PORT TOWNSEND
PERMIT ACTIVITY LOG
PERMIT DATE RECEIVED
SCOPE OF WORK: A d J � �
?105
Development Services
oc�wr ro 250 Madison Street, Suite 3
Port Townsend WA 98368
Phone: 360-379-5095
Fax: 360-344-4619
www.cityofpt.us
Commercial Building Permit Application
Project Address & Zoning District:
Parcel #
gS�GaO L
Project Description:
Legal Description (or Tax #):
Additiomk&g; ),
Block: �-
Lot(s):� �.
➢ Applications accepted by mail must include a check for initial plan review fee of $150
➢ See the "Commercial Building Permit Application Checklist' for details on
plan submittal requirements.
Property Owner:
ealw
• - 0a0
M
••-+.c�
,.• a
" S4
Contractor:
Name:
Address:_<,a 1N&.g 9--,
City/St/,ip
Phone:
Email:
State License #:5%+°tCEBt44r-i 3L'} Exp: 4g Ioq
City Business License #: (o
+Off Ice Use Onlyl
r it L
Associated Permits:
Lender Information:
Lender information must be provided for projects
over $5,000 in valuation per RCW 19.27.095.
Project Valuation: $ 2)4Z', 0OO
Construction Type:
Occupancy Rating:
4�(li-
Building Information (square feet): t3(&
Vt floor
Restrooms:
2"d floor
Deck(s):
3ro floor
Storage:
Basement:
Is it finished? Yes No
Other: 04.2, 1, ✓Ldcu►r
Fce t
New ❑ Addition ❑ Remodel/Repair
Change of Use ❑
Total Lot Coverage (Building Footprint):
Square feet: Mik ...
Impervious Surface: i I .. .
Square feet: F �
I hereby certify that the information provided is correct, that I am either the owner or authorized to nt on
and that all activities associated with this permit will be in accordance with State Laws and the l ort'Towi
Print Name:
aM►N,.
id Municipal Code.
11E f l i'r f iVIN E ,0,
BUSINESS LICENSE
The person, firm or corporation named below, whose residence or place of business is
located as shown, having this day paid all required fees, Is hereby granted license to
engage in the business, profession, occupation, trade, or exhibition named, in the City of
Port Townsend, for the period Townsend, for the period indicated.
BUSINESS NAME: Sealevel Bulkhead Builders, L L C
BUSINESS LOCATION: 5819 NE Minder Rd
Poulsbo, WA 98370
SEALEVEL BULKHEAD BUILDER;
PO BOX 375
KINGSTON, WA 98346
POST IN A CONSPICUOUS PLACE AT BUSINESS LOCATION
CITY OF PORT TO NSE ID
250 Madison Street, Suite 1
Port Townsend, Washington 98368
Business License Number: 007584
Date Issued: April 17, 2008
Expiration Date: December 31, 2008
NOT TRANSFERABLE
COMMERCIAL BUILDING PERMIT APPLICATION
CHECKLIST
This checklist is for new construction, additions, and remodels. The purpose is to show what you intend to
build, where it will be located on the lot, and how it will be constructed.
I Commercial building permit application.
I Non -Residential Energy Code forms: * Lighting * Mechanical 0 Envelope
I Three (3) sets of plans with North arrow and scaled, no smaller than '/4" = 1 foot:
Title Page/Cover Sheet:
1. Project identification
2. Project address, legal description, location map, tax parcel number(s)
3. All design professionals identified including addresses and phone numbers
4. Name, address, and phone number of person responsible for project coordination
5. Design criteria, including occupancy group, construction type, allowed floor area vs.
proposed, occupant loads, height and number of stories, deferred submittals, etc.
6. Designate compliance with all applicable codes
I A site plan showing:
1. Legal description and parcel number (or tax number),
2. Property lines and dimensions
3. Setbacks from all sides of the proposed structure to the property lines in
accordance with a pinned boundary line survey
4. On -site parking and driveway with dimensions
5. Street names and any easements or vacations
6. Location and diameter of existing trees
7. Utility lines
8. If applicable, existing or proposed septic system location
9. Delineated critical areas boundaries and buffers
Foundation plan:
1. Footings and foundation walls
2. Post and beam sizes and spans
3. Floor joist size and layout
4. Holdowns
5. Foundation venting
Floor plan:
1. Room use and dimensions
2. Braced wall panel locations
3. Smoke detector locations
4. Attic access
5. Plumbing and mechanical fixtures
6. Occupancy separation between dwelling and garage (if applicable)
7. Window, skylight, and door locations, including escape windows and safety glazing
I Wall section:
1. Footing size, reinforcement, depth below grade
2. Foundation wall, height, width, reinforcement, anchor bolts, and washers
3. Floor joist size and spacing
4. Wall stud size and spacing
5. Header size and spans
6. Wall sheathing, weather resistant barrier, and siding material
7. Sheet rock and insulation
8. Rafters, ceiling joists, trusses, with blocking and positive connections
9. Ceiling height
10. Roof sheathing, roofing material, roof pitch, attic ventilation
Exterior elevations (all four) with existing slope of the land in relation to all proposed
structures
I If architecturally designed, one set of plans must have an original signature
I If engineered, one set of plans must have one original signature
I For new dwelling construction, Street & Utility or Minor Improvement application
Nesset Bulkhead Replacement Project
Site Address: 2215 Washington Street
Legal Description: Parcel # 957602701:
Hastings 2nd Addition; Blk 27 Lots 1, 3 & 4; T L
110
Map Attached
Contractor & Agent: Sealevel Bulkhead Builders, Inc
PO Box 375
Kingston, WA 98346
(360) 297-2401
scale%�elb ( ilverlink.net
Engineer: Herb Armstrong
ADA Engineering
PO Box 847
Poulsbo, WA 98370
(360) 779-6633
Proposal: The subject proposal is for a Shoreline Substantial
Development Permit Exemption under the allowed repair and maintenance to an existing
shoreline protection structure. The existing concrete bulkhead will be fully replaced with
a new rock bulkhead in accordance with the details below. Total footage of replacement
bulkhead proposed is 143 linear feet. The beach waterward of the existing bulkhead will
also be cleaned up to remove the concrete debris from the beach. This will only extend
as far waterward as allowed by the authorizing agencies.
The replacement bulkhead will be constructed with large A & B size basalt rock, "A"
rock weighing 3-7 tons and "B",.rock weighing 1-3 tons. The base rocks will be keyed
into the beach appro imatel y,3,ee� clow beach grade and the remaining rocks stacked
on top of them, height to total approximately 6-8' above beach grade. Quarry spalls will
be placed behind the armor rock and filter fabric placed between the spalls and the bank.
Delivery of all equipment and materials will be by land via Kearney St.
CONSTRUCTION DETAILS FOR,
REPLACE CONCRETE RIP RAP WITH A ROCK BULKHEAD
1-1
2205 Washington Street
Port Townsend WA
Owner:
John Nesset
PO Box 214
Port Townsend. WA 98368
TABLE OF CONTENTS:
Heavy Rock Wall Cross Sections
1-2 Site Plan
2-2 Cr o�ss cto ,d , H, cinity Map
I xOh 9 �
r
uu�l iWi wure uouuumuumu noo 0 oimommmomvrvmu�wq
�i� tl� � i rc Vm r�ts�rrr��mmoimwimu�m
try i I
N"nix vI IImi
CITY
I Y
ADA
Sealevel Bulkhead Blders
Sealevel Bulkhead Blders
�.° e.. ��� ���.w...;�
._.
Ij
.. .... . Y 2r Cpp
i (11 I'll V kIS E ND
GENERAL NOTES
1. MAXIMUM H=16 FT.
2. ROCKERY TO BE ERECTED UNDER DIRECTION & SUPERVISION OF THE ENGINEER.
3. THE FACE OF THE ROCKERY WALL SHALL BE INSTALLED WITH A SMOOTH FACE. MAX. SLOPE 1 to 4.
4. THE LONG DIMENSION OF THE ROCKS SHALL EXTEND INTO THE EARTH TO PROVIDE MAXIMUM STABILITY,
5. THE ROCKS SHALL BE PLACED TO LOCK INTO THE ROCKS IN THE LOWER TIER.
6. MIN. 2 FT. KEY INTO ORIGINAL UNDISTURBED EARTH.
7. APPROXIMATE ROCK SIZES BASED ON 163 LBS./CU. Ff.
REFER TO SEC. 9-13.7(1) OF THE 2000 STANDARD SPECIFICATIONS
Approximate Weight — LBS. i Approximate
I Volume — Cu.Ft.
1 Man
50 —
200
0.3 —
1.2
2Man
200-700
1.2-4.3
3 Man
700
— 2000
4.3 —
12.3
4 Man
2000
— 4000
12.3
— 24.5
5 Man
4000
— 6000
; 24.5
— 36.8
6 Man
5000 — 8000 E 36.8 — 49.0
i
HEAVY ROCK WALL CROSS SECTION
NO SCALE
IMPERVIOUS SURFACE LAYER
FOR SURFACE DRAINAGE
DEPTH VARIES (6-12")
UNDISTURBED EARTH
FILTER FABRIC
OPENINGS CHINKED with quarry spoils
BACKFILL
Clean, sell —graded, sand gravel or cashed
rock, 2" maximum size, 407. to 607. grovel,.
less than S fines (passing No. 200 sieve).
Fines shall be non —plastic.
Cornpad in 4" lifts with minimum of 4 coverages
by hand —operated tamper. Compact to at
least 92% of Modified Proctor maximum dry
density (ASTM D-1557). Bockfill and rock
placement should be built up together.
4" Diameter PERFORATED DRAIN PIPE bedded
in washed 3/4" pea gravel, sloped to drain
and connected by tiahtl'J,n_e to starm droin
oatfoll. No fabric arouaa pipe,
lb _ Jr am` -
� t
t - i
A.D.A. ENGINEERING
P.O. BOX 847
POULSBO, WA 98370
PHONE: (360) 779-6633
B.I. PHONE. (206) 842-6123
FAX: (.360) 779-7031
LAN
m
d
g
f
r A
® ffi
CL
RoRb
W
® ��s =
-lice �53
F t
3 A <`
ON
Q' E
m Cn uu 14 <w p f I
m
0)
For.LIN
N
`• a
El e%vi EMkttwW BLOldem e: I ST DMiftNuMbw
Q
Revls�ed
P.O. Box 375 , WA - €�: �
It
m
d
k
co
M r —
SoA
�.
..
2
F-
O
E
F
0+
m
4L,
To WN -
r
Drawing Nwnber I
Receipt Number:dT,
col rt'Date:
07�1712008
Caa iec, FRONTIDEW Payer/Payee Nerve: Seal el Bulkhead Builders.
originalIF a
mount
Fed.
Permit
Parcel
Fee eecrl tlon
mount
Paid-
Bala co:,
BLD08-122
957602701
Plan Review Fee
$163.31
$163.31
$0.00
BLD08-122
957602701
Technology Fee for Building Permit
$5.03
$5.03
$0.00
BLD08-122
957602701
State Building Code Council Fee
$4.50
$4.50
$0.00
BLD08-122
957602701
Building Permit Fee
$251.25
$251.25
$0.00
BLD08-122
957602701
Record Retention Fee for Building P
$10.00
$10.00
$0.00
genpmtrreceipts Page 1 of 1
CITY OF PORT TOWNSEND
SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT EXEMPTION
WASHINGTON STATE SHORELINE MANAGEMENT ACT (RCW 90.58)
Applicant: John Nesset Case Number: LUP 08-054
PO Box 214
Port Townsend, WA 98368
Applicant's Agent: Sealevel Bulkhead Builders, Inc.
PO Box 375
Kingston, WA 98346
Project Location/Legal Description: The subject site is located at 2215 Washington Street, Port
Townsend Bay, City of Port Townsend, Washington. NW `/4 Section of Section 11, Township
30N, Range 1 W, on Jefferson County tax parcel number 957602701.
Proposal: The proposal involves repairing of the existing but severely deteriorating shoreline
protection structure (bulkhead) and beach clean up for approximately 143' of shoreline, in the
urban shoreline designation. The existing broken concrete debris and rock bulkhead will be fully
replaced with a new rock bulkhead in accordance with the details submitted with the application.
The beach for the entire length of the lot will be cleaned up. The beach clean up will extend
only as far waterward as allowed by the authorizing agencies, including the Washington State
Department of Fish and Wildlife under their HPA permit. The replacement bulkhead will be
constructed with large A & B size rock ("A" rock weighing 3-7 tons and "B" rock weighing 1-3
tons). The base rocks will be keyed into the beach approximately 3 feet below the beach grade
and the remaining rocks stacked on top of them, height to a total approximately 6-8" above beach
grade. Quarry spalls will be placed behind the armor rock and filter fabric placed between the
spalls and the bank. Delivery of all equipment and materials will be by land via Kearney St. The
project will be subject to all conditions of the WDFW HPA permit and may not proceed prior to
issuance of that permit and those of the shoreline exemption, consistent with the City of Port
Townsend 2007 Shoreline Master Program.
Adjacent Waterbody: Port Townsend Bay.
SMP Shoreline Designation: Urban
LUP08-058
Nesset Shoreline Exemption
Findings & Conclusions
The proposal by Mr. Nesset to undertake repair and replacement of the existing shoreline
protection structure within the shoreline of the City of Port Townsend, is exempt from the
requirement of a substantial development permit. Specifically, the proposal constitutes:
X Normal Maintenance and Repair _Development not exceeding $5,000
_Single-family home for owner's use Other:
2. The proposal will not materially interfere with the public use of public lands and waters
or the private use of adjacent private lands nor will it result in any material expansion or
change in use beyond that previously existing. There is no change in use proposed and no
impact to public access.
3. The proposal is consistent with the policies of the Shorelines Management Act (SMA)
and the City's Shorelines Master Program (SMP). Protection of existing structures is a
fundamental goal of the SMA and the city's SMP. The proposal involves repair of an
existing bulkhead that protects a lawfully established commercial establishment in an
existing building. Protection of existing lawfully established structures is consistent with
the goals of the Shoreline Management Act.
4� The nature of these repairs will require in -water construction and mechanized equipment
for a limited period of time. In water work shall be conducted within inwater work
periods for this location (July 15, 2007 to February 15, 2008) or as further limited by the
Washington State Department of Fish & Wildlife or US Army Corp of Engineers.
Environmental impacts associated with the proposal have been analyzed pursuant to the
State Environmental Policy Act (SEPA). The City of Port Townsend issued a
Determination of NonSignificance (DNS) in conjunction with the SEPA Environmental
Checklist on June 11, 2008. (Exhibit A). Impacts to the biological environment were
based upon the recommendations of the Washington State Department of Fish and
Wildlife. The aforementioned DNS and Environmental Checklist are incorporated herein
by reference. No significant, adverse environmental impacts that could not be mitigated
were identified in the SEPA determination.
Decision
Based on the foregoing Findings and Conclusions, LUP 08-054 is hereby APPROVED subject
to compliance with the following CONDITIONS:
All development shall be in substantial conformance with the narrative and development
plans submitted in the application for Shoreline Exemption. There shall be no further
expansions to or addition of any structures without prior review for conformance with the
L UP08-058
Nesset Shoreline Exemption
2
Shoreline Master Program and any other applicable laws and ordinances.
2. This exemption does not excuse the proponent from complying with other local, state and -
federal ordinances, regulations, or statutes applicable to the proposed development
including but not limited to the city's critical areas ordinance, US Army Corps of
Engineers, and Hydraulic Project Approval (HPA) from Washington Department of Fish
and Wildlife.
3. In water work shall be conducted within inwater work periods for this location (July 15,
2007 to February 15, 2008) unless further restricted by permitting agencies.
4. The use of mechanized equipment shall be the minimum necessary to complete the
permitted repairs and shall comply with any conditions of the associated HPA.
5. If construction equipment inadvertently damages the shoreline environment, the applicant
shall notify the City and any other responsible agencies (i.e. State Fish & Wildlife,
Ecology) immediately. The applicant shall be responsible for repairing the shoreline to
its preexisting condition to the satisfaction of the responsible agencies.
6. If city street rights -of -way are to be used for staging and/or access the applicant must first
obtain a City Minor Improvement Permit (MIP).
7. To avoid environmental health hazards during construction, emergency spill and cleanup
procedures shall be explained to all workers on the site and a point of contact will be
designated. All heavy equipment involved with the construction shall be inspected daily
for leaks. Any equipment leaking hazardous materials is prohibited from conducting any
work below the OHWM until the leak is repaired.
All construction contracts shall specify that all diesel, gasoline and air -powered
equipment must be properly muffled or silenced.
9. The applicant must abide by all conditions of the WSDFW HPA permit, and permits from
the USACE, and supply copies of said permits to the City of Port Townsend,
Development Services Division, prior to start of construction.
10. The applicant must dispose of all demolition and construction debris generated on -site
and during beach clean up must at a permitted facility. Further, the applicant is
encouraged to reuse or recycle as possible all leftover construction and beach clean up
materials.
Expiration: Pursuant to 2.4(A) of the SMP, this exemption shall automatically expire one year
LUP08-058
Nesset Shoreline Exemption
from the date of issuance.
In consideration of the above, the proposal is found exempt from the requirement of a shoreline
substantial development permit.
'it Iolavera,'Shorelines Administrator
ity of Port Townsend
4
27
ate of Issuance
LUP08-058
Nesset Shoreline Exemption
-RT CONSTRUCTION PROGRESS RECORD
CITY OF PORT TOWNSEN
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
POST THIS CARD IN A SAFE, CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF
BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE.
PARCEL NO. 957602701 PERMIT NO. BLD08-122 ISSUED DATE 07/17/2008 EXPIRATION DATE 01/13/2009
ADDRESS 2215 WASHINGTON ST CONSTRUCTION TYPE OCCUPANT LOAD
OWNER WASHINGTON WHARF TRUST PROJECT DESCRIPTION REPLACE BULKHEAD
CONTRACTOR SEALEVEL BULKHEAD BUILDERS INC. LENDER
INSPECTION INSP DATE COMMENTS
FOOTING
FINAL BUILDING
_ `T
FINAL PUBLIC WORKS
INSPECTION INSP DATE COMMENTS
TO REQUEST AN INSPECTION CALL (360) 385-2294.
INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO 3:00 PM FOR NEXT DAY INSPECTION.