HomeMy WebLinkAbout17-034 Approving the Final Design Concept for the Water Street Overlay Project from Taylor Street to the Ferry TerminalResolution 17-034
Page 1 of 2
RESOLUTION NO. 17-034
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND,
WASHINGTON, APPROVING THE FINAL DESIGN CONCEPT FOR THE WATER
STREET OVERLAY PROJECT FROM TAYLOR STREET TO THE FERRY
TERMINAL AND AUTHORIZING THE CITY MANAGER TO BID, EXECUTE AND
SIGN ALL CONTRACTS FOR THE PROJECT
WHEREAS, the City adopted Resolution 16-044 on September 19, 2016, approving the
general design concept for the design of the Water Street Overlay — Ferry Terminal to the Taylor
Street Project, directing the City Manager to proceed with the project engineering design and
requesting that the City Manager prepare funding options; and
WHEREAS, the project is partially funded through a grant from the Transportation
Improvement Board (TIB) for the FY 2017 Arterial Preservation Project for pavement removal
and replacement on Water Street from Taylor Street to the Ferry Terminal; and
WHEREAS, the City Manager proposes funding the City's share of the Project using the
2017 Revenue bond; and
WHEREAS, the City has held informational public meetings with the City Council, the
Non -Motorized Transportation Advisory Board, the Port Townsend Main Street Program and
other stakeholders; and
WHEREAS, the City has notified affected business by direct mailing and published
Project design details on the City's website and in the City's monthly newsletter.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port
Townsend as follows:
1. Council approves the conceptual design for the Water Street Overlay Project from
Taylor Street to the Ferry Terminal in substantially the same form as shown in
Exhibit A.
2. The City Manager is authorized to negotiate, bid, execute, and sign all agreements
necessary to complete the Project provided sufficient funds have been appropriated.
The City Manager is directed to hold a public meeting in sufficient time to provide
input on non -hard scape elements (signage, striping, bike lanes) as soon as
practicable.
Resolution 17-034
Page 2 of 2
ADOPTED by the City Council of the City of Port Townsend at a regular meeting
thereof, held this 17th day of July, 2017.
Attest:
.. .....................
Joanna Sanders, CMC
City Clerk
Deborah S. Sti soy
Mayor
Approved as to form:
._.mm.. _ _.. _ .... ..........................
Steven L. Gross
City Attorney
EXHIBIT A
o'
6 Water Street (near Ferry Terminal Intersection)
Modified
s Radius
lWater
Street Over
Streetlight
Iib Water Street
6 Water Street (East -bound bus bulb)
Resolution 17-034 Exhibit A
Page 1 of 2
N
LLA
o 0 0
0
0
11tre
s \
Bulb Garden IJ_
ligf
tRelocated Striped Streetlight
Bus Stop ; Crosswalk �I
6 Water Street (East -bound bus bulb)
Resolution 17-034 Exhibit A
Page 1 of 2
�i' J L E L
0 0
o 0
1 --
Streetlight Rain
Garden
_r
Design Concepts I Port Townsend, WA I July 10, 2017
Water Street (West -bound bus bulb)
----------------- I [
=-—I (—
Streetlight Rain Seat Bus Relocated Streetlight
Garden Wall Bulb Bus Stop
To®,s wned spa Aw�E ■
N
LLA
Df
Ln
11tre
s \
Bulb Garden IJ_
ligf
tRelocated Striped Streetlight
Bus Stop ; Crosswalk �I
�i' J L E L
0 0
o 0
1 --
Streetlight Rain
Garden
_r
Design Concepts I Port Townsend, WA I July 10, 2017
Water Street (West -bound bus bulb)
----------------- I [
=-—I (—
Streetlight Rain Seat Bus Relocated Streetlight
Garden Wall Bulb Bus Stop
To®,s wned spa Aw�E ■
EXHIBIT A
i
Water Street(typicall Polk to Taylor)
H
t/1
Y
J
0
Striped Streetl
d
4 0
b Tyler St Landing (street to beach)
II v I,I I I
�I O 00 O la
x
•� IIlb Tyler St Landing (building to building)
Streetlight
Existing Streetlight
Tunnel I
X
Resolution 17-034 Exhibit A
Page 2 of 2
Tree Count
8a
to
Existing Trees to
�t
be Retained
J
Q
29
Proposed
o
Street Trees
7
Proposed
Ornamental Trees
.. .
,nd_ sCJ aLL,.
(includesreplacement of
2 trees at Tyler St Plaza)
o o o WATER ST-
------------------
=:D -----------------
------ ------------
Striped
----Striped Seat Streetlight St eetli ht _-----
Crosswalk Wall --------
' Re ov ble K
' _ Bo lards E
' v -
' I
b
Existing
Site Plan Beach Access
Water Street Street Overla esrgn Concept *Twd, WA July 0, 2017
Rhody Princess
— Cafe Seating Handprints
— Flexible
Concrete Plaza
----0 II+I
Access
C�
to
0
J
Q
o
.. .
,nd_ sCJ aLL,.
r ♦•.