Loading...
HomeMy WebLinkAbout17-034 Approving the Final Design Concept for the Water Street Overlay Project from Taylor Street to the Ferry TerminalResolution 17-034 Page 1 of 2 RESOLUTION NO. 17-034 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, WASHINGTON, APPROVING THE FINAL DESIGN CONCEPT FOR THE WATER STREET OVERLAY PROJECT FROM TAYLOR STREET TO THE FERRY TERMINAL AND AUTHORIZING THE CITY MANAGER TO BID, EXECUTE AND SIGN ALL CONTRACTS FOR THE PROJECT WHEREAS, the City adopted Resolution 16-044 on September 19, 2016, approving the general design concept for the design of the Water Street Overlay — Ferry Terminal to the Taylor Street Project, directing the City Manager to proceed with the project engineering design and requesting that the City Manager prepare funding options; and WHEREAS, the project is partially funded through a grant from the Transportation Improvement Board (TIB) for the FY 2017 Arterial Preservation Project for pavement removal and replacement on Water Street from Taylor Street to the Ferry Terminal; and WHEREAS, the City Manager proposes funding the City's share of the Project using the 2017 Revenue bond; and WHEREAS, the City has held informational public meetings with the City Council, the Non -Motorized Transportation Advisory Board, the Port Townsend Main Street Program and other stakeholders; and WHEREAS, the City has notified affected business by direct mailing and published Project design details on the City's website and in the City's monthly newsletter. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend as follows: 1. Council approves the conceptual design for the Water Street Overlay Project from Taylor Street to the Ferry Terminal in substantially the same form as shown in Exhibit A. 2. The City Manager is authorized to negotiate, bid, execute, and sign all agreements necessary to complete the Project provided sufficient funds have been appropriated. The City Manager is directed to hold a public meeting in sufficient time to provide input on non -hard scape elements (signage, striping, bike lanes) as soon as practicable. Resolution 17-034 Page 2 of 2 ADOPTED by the City Council of the City of Port Townsend at a regular meeting thereof, held this 17th day of July, 2017. Attest: .. ..................... Joanna Sanders, CMC City Clerk Deborah S. Sti soy Mayor Approved as to form: ._.mm.. _ _.. _ .... .......................... Steven L. Gross City Attorney EXHIBIT A o' 6 Water Street (near Ferry Terminal Intersection) Modified s Radius lWater Street Over Streetlight Iib Water Street 6 Water Street (East -bound bus bulb) Resolution 17-034 Exhibit A Page 1 of 2 N LLA o 0 0 0 0 11tre s \ Bulb Garden IJ_ ligf tRelocated Striped Streetlight Bus Stop ; Crosswalk �I 6 Water Street (East -bound bus bulb) Resolution 17-034 Exhibit A Page 1 of 2 �i' J L E L 0 0 o 0 1 -- Streetlight Rain Garden _r Design Concepts I Port Townsend, WA I July 10, 2017 Water Street (West -bound bus bulb) ----------------- I [ =-—I (— Streetlight Rain Seat Bus Relocated Streetlight Garden Wall Bulb Bus Stop To®,s wned spa Aw�E ■ N LLA Df Ln 11tre s \ Bulb Garden IJ_ ligf tRelocated Striped Streetlight Bus Stop ; Crosswalk �I �i' J L E L 0 0 o 0 1 -- Streetlight Rain Garden _r Design Concepts I Port Townsend, WA I July 10, 2017 Water Street (West -bound bus bulb) ----------------- I [ =-—I (— Streetlight Rain Seat Bus Relocated Streetlight Garden Wall Bulb Bus Stop To®,s wned spa Aw�E ■ EXHIBIT A i Water Street(typicall Polk to Taylor) H t/1 Y J 0 Striped Streetl d 4 0 b Tyler St Landing (street to beach) II v I,I I I �I O 00 O la x •� IIlb Tyler St Landing (building to building) Streetlight Existing Streetlight Tunnel I X Resolution 17-034 Exhibit A Page 2 of 2 Tree Count 8a to Existing Trees to �t be Retained J Q 29 Proposed o Street Trees 7 Proposed Ornamental Trees .. . ,nd_ sCJ aLL,. (includesreplacement of 2 trees at Tyler St Plaza) o o o WATER ST- ------------------ =:D ----------------- ------ ------------ Striped ----Striped Seat Streetlight St eetli ht _----- Crosswalk Wall -------- ' Re ov ble K ' _ Bo lards E ' v - ' I b Existing Site Plan Beach Access Water Street Street Overla esrgn Concept *Twd, WA July 0, 2017 Rhody Princess — Cafe Seating Handprints — Flexible Concrete Plaza ----0 II+I Access C� to 0 J Q o .. . ,nd_ sCJ aLL,. r ♦•.