CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-294 Issued: O1/15/04 Parcel Number: 001 044 021 & 001044 020
Job Address: 2624 Hastings Avenue Zoning: R-I/R-HI Type: V`N Occupancy: U-1
Nature of Work: Construct 748 square foot Pole Building for use as storage area.
Owners: -Patrick & Patricia Pyles Contractor: Town & Country - PermaBilt - TOWNCPF099LT
(1-800-824-9552}
GENERAL CONDITIONS APPLY -SEE NEXT PAGE
RE UIRED INSPECTIONS APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2, install on-site as needed
during construction -okay to use existing driveway as
construction entrance
FOOTING
ProLine PakMix or Quikcrete #110; verify thickness of
punch pad after pour prior to post set ~
Setbacks - ~~
Post Footings -18" diameter, 4' deep per engineered plans ,N
Verify Post Hole Dimension Prior to Pour
Punch Pad
Reinforcement
Forms
SLAB
Non-structural
FRAMING
Posts - 4 x 6 sidewall and endwall per engineering
Rake Beams - 2 x 12 w/ 2 x 6 ledger
Girts - 2 x 6
Purlins - 2 x 6 @ 24" o.c.
Joist Positive Connections
Bracing
Strapping
Continued next a e
Call 48 hours before you dig for utility line locates
I-800-424-SSSS
Page I of 3
Pemrit#BLW3-294 "
REOIJIRED TNSPF,t"TT(lNC a vnnnx~nm a m~
- ---- -
FRAMING (continued from page 1) aaa ++~v ~ LL/Jl P11 L'
Trusses -pre-fabricated engineered -engineered truss plan
shall be on-site at time of inspection ,a``
Truss Lateral Bracing ~\
Rafters -gable end ,
CZ
Cladding - sidewall and endwall ;
Blocking
Bolts
Posifive Connection -per engineered section detail ~i ~
Windows
~
Doors y
Siding & Roofing f
!
r~
FINAL
House Numbers - 5"numbers of contrasting color posted
near main entrance of house and visible from street per
City Ordinance
Final -Building /~
~./
GENERAL CONDITIONS
1. ,Contractors working on this project are required to have a Labor & Industries contractor's •
reeistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt
& debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Pertmt # BLD03-294
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received
prior to scheduling the Building Department's final inspection.
Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has
are done by the Building Department within
to keep your building permit active.
been made within six months, or if no inspections
one year. Call for at least one inspection per year
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.