Loading...
HomeMy WebLinkAboutBLD03-288Watemmn &. Katz Building 181 Quincy Sfreet, Suite 301 Port rowaveud, WA 98368 PMve: (360) 379-3208 Fax: (360) 3857675 L CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaII 385-2294 for Inspection Permit Number: BLDO3-288 Issued: 12/10/03 Parcel Number: 001-112-001 Job Address: 1930 Lawrence Street Aot. #3 Occupancy: RR=1 Zoning: R-IV Type: VV=N Nature of Work: Repair damaged exterior bearing wall resultine from automobile impact Owner: Lawrence Street Aaartments Contractor: Eastside Remodeling - EASTSR*120ME 379-4141 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPRnVF,D/nATF ING Walls -Sister 2 x 6 studs to existing cracked studs Replace damaged 5/8" T1-11 Repair/replace diagonal bracing ' ~ Positive Connection -Simpson A35 each comer ~' Install '/2" x 10" anchor bolts with b.p. washers, (1) each way INSULATION .,,~' Fill exposed cavities with R-21 ~ 1 Faced Batts,; face staple to studs ~' DRY WALL NAILING Walls FINAL Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pervu[ tBLD03-286 ENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all de£ciencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Bnilding Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twen -four hours notice is re nixed. Public Works a royal must be received prior to scheduline the Buildine Deuartment's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for ntility line locates 1-800-424-5555 Page 2 of 2