Loading...
HomeMy WebLinkAboutBLD03-287Watnn~n & Katz Builduig 1 Sl Quincy Street Suite 301 Port Townsend, WA 98368 Phone (350j 379-3208 Fax (350) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-2g7 Issued: 12/09/03 Parcel Number: 985 208 401 Job Address: 607 V Street Zoning: R;lI Type: V_N Occnpancy: R-3 Total Occupant Load: No Change Nature of Work: Build 208 sp. ft. deck, stairs and railines, Owners: Earl & Bettvlou Burnett Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Deck Pier Footings Reinforcement FLOOR FRAMING/DECK All wood members to be pressure treated or wood of natural , resistanceto decay ,. Posts Beam Joists (2" x 8"@ 16" o.c J I Hangers Positive Connection Post-to-Pier Post-to-Beam Treated Wood to Concrete Lag Bolts @ ledger Blocking French Doors - .40 or better U-Factor FINAL House Numbers posted (minimum 5"} Guardrails ~ Handrails ~ Stairs i Landing/1" Threshold ~ ~ Smoke Detectors throughout existing construction per 1997 - ~ UBC ~~. Deck -Final , ', Ca1148 hours before you dig utiliTy line locates: 1-800-424-5555 Page 1 of 2 Pemut N BLD03.287 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior to beginning constructian; cai1385-2294. Measures shall include installafion of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduline the Buildine Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2