Waterman & Katz Building
I81 Quincy Saee[, Suite 301
Port Townsead, WA 98366
PLOne: (360) 3793208 Fax: (360) 385-7075
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-282 Issued: 02/26/04 Parcel Number. 966 600 901
Job Address: 1826 21" Street Units A - D Zoning: RR=II Type: V_N Occupancy: R-3
Total Occupant Load: 3/3/3/3 Nature of Work: Building #12: Construct Fourplex.
Owners: Laurel Heights, LLC Contractor: Island Construction, Inc. - ISLANCI008R0
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-4I7-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site i
~
~I
~
FOOTINGS -per engineer design i
Setbacks
Footings ~~
Interior Footings i
Forms
Reinforcement ~
LIFER ~
i
Porch/Deck Piers
GROUNDWORK PLUMBING i
Pressure Test ~
Pipe Joints Exposed ~
~
Pipe Bedding ~\_.-
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
Pemdt k BLD03-2ffi
RE UIRED INSPECTIONS
APPROVED/DATE %
FOUNDATION -per architectural design ~
Stem Wall
Forms -
Reinforcement
Anchor Bolts - -per engineer design
Holdowns -per engineer shear wall schedule
SLAB -per engineer design
Reinforcement - 6 X 6 W 1.4 X W 1.4 W WF
Perimeter Insulation
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Whole House Fan @ Laundry Room
KitchenBath/Laundry Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
~J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pemut # BLD03-282
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Prescriptive Bc designed braced wall panel sheathing &
nailing must be inspected prior to cover
Walls
Shear Walls -per engineer design
Floors -Engineered TJI plan to be on site at inspection
Ceilings
Posts, Beams & Headers -per engineer design
Roof
Trusses -Engineered truss plan to be on-site at inspection
Blocking
Rafter/ Truss Positive Connection - Hl
Roof Venting -cave and ridge vents
Windows -escape i
Windows -safety glazing
Windows Ufactor - .40 or better i
NFRC window sticker must be on windows &
doors at inspection time I
Fresh Air Intake (Window Ports) i
Doors U-Factor - .20 or better
Air Seal '
Fire Blocking
Weather Resistive Barrier
INSULATION ~
Floor (R-30)
Walls (R-21 )
Ceiling (R-30vaultlR-38 attic)
Vapor Barrier: paint
Baffles
DRY WALL NAILING
Walls -party wall separation
Ceiling
Enclosed Usable Space under Stairs
FINAL
Public Works Sign-Off
House Numbers - 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 3 of 4
Pertni[ k BLD03-282
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheefing, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass Snal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the BuildinE Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
s
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4