Loading...
HomeMy WebLinkAboutBLD03-282+. Waterman & Katz Building I81 Quincy Saee[, Suite 301 Port Townsead, WA 98366 PLOne: (360) 3793208 Fax: (360) 385-7075 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO3-282 Issued: 02/26/04 Parcel Number. 966 600 901 Job Address: 1826 21" Street Units A - D Zoning: RR=II Type: V_N Occupancy: R-3 Total Occupant Load: 3/3/3/3 Nature of Work: Building #12: Construct Fourplex. Owners: Laurel Heights, LLC Contractor: Island Construction, Inc. - ISLANCI008R0 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-4I7-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site i ~ ~I ~ FOOTINGS -per engineer design i Setbacks Footings ~~ Interior Footings i Forms Reinforcement ~ LIFER ~ i Porch/Deck Piers GROUNDWORK PLUMBING i Pressure Test ~ Pipe Joints Exposed ~ ~ Pipe Bedding ~\_.- Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Pemdt k BLD03-2ffi RE UIRED INSPECTIONS APPROVED/DATE % FOUNDATION -per architectural design ~ Stem Wall Forms - Reinforcement Anchor Bolts - -per engineer design Holdowns -per engineer shear wall schedule SLAB -per engineer design Reinforcement - 6 X 6 W 1.4 X W 1.4 W WF Perimeter Insulation PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan @ Laundry Room KitchenBath/Laundry Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) ~J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pemut # BLD03-282 REQUIRED INSPECTIONS APPROVED/DATE FRAMING Prescriptive Bc designed braced wall panel sheathing & nailing must be inspected prior to cover Walls Shear Walls -per engineer design Floors -Engineered TJI plan to be on site at inspection Ceilings Posts, Beams & Headers -per engineer design Roof Trusses -Engineered truss plan to be on-site at inspection Blocking Rafter/ Truss Positive Connection - Hl Roof Venting -cave and ridge vents Windows -escape i Windows -safety glazing Windows Ufactor - .40 or better i NFRC window sticker must be on windows & doors at inspection time I Fresh Air Intake (Window Ports) i Doors U-Factor - .20 or better Air Seal ' Fire Blocking Weather Resistive Barrier INSULATION ~ Floor (R-30) Walls (R-21 ) Ceiling (R-30vaultlR-38 attic) Vapor Barrier: paint Baffles DRY WALL NAILING Walls -party wall separation Ceiling Enclosed Usable Space under Stairs FINAL Public Works Sign-Off House Numbers - 5" minimum Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates I-800.424-5555 Page 3 of 4 Pertni[ k BLD03-282 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheefing, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass Snal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the BuildinE Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. s Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4