Loading...
HomeMy WebLinkAboutBLD03-279Watemmn & Katz Building 181 Quincy Street, Suite 307 Port Townsend, WA 98368 Phone: (360)379-3208 Faz: (J60j785-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-279 Issued: 11/26/03 Parcel Number: 968100 806 Job Address: 452 30th Street Zoning: R=III Type: VV=N Nature of Work: Build 210 souare foot roof over second floor deck. Owner: Andv Erickson Contractor: Owner 385-4622 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor Br, Industries @ 360-417-2702 FRAMING/FINAL -Framing and final inspections may Abe done at the same time if all elements of construction are available for inspection Post - 4 x 6 Treated Wood or wood with natural resistance to decay Beam-4x8 Ledger - 2 x 10 Rafters - 2 x 8 @ 24" o.c. Positive Connections Treated Wood Roof Skylights House Numbers -check for 5"numbers Smoke Detectors Final -Building • r. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Occupancy: RR=3 ~^ f / ' i Pemrit #BLDD3-279 GENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's registratign number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of slit fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. Alt elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP} require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works anaroval must be received prior to scheduling the Building Denartment'sfinal inspection 7. Final Inspections are required prior to occupancy; a Certifwcate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by tbe. Building Department within one year. Call for at least one inspection per year to keep your building germit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2