CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 379-4450 for Inspection
Waterman & Katn Building
l81 Quincy Street, Suite 20l
Port Townsend, WA 98368
Phone: 368~379~5083 Fax 360.3857675
Permit Number: BLDO3-Zf)8 Issued: 12/24/03 Parcel Number: 951-907-501
Job Address: 2710 Peary Avenue Zoning: R-I Type: VV=N Occupancy: R-3/U-1
Total Occupant Load- 6/2 Nature of Work: Single-family Dwelling w/ attacbed garage
Owner: Marv Ann Shaffer/Sally Loken Contractor: Dobson Construction. Inc.
DOBSOCI012K7 360-908-3544
~.
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit- Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPRnVFiI/nATF.
TEMP EROSION & SEDIMENT CONTROL See
General Condition #2 & attached Erosion & Sediment
Control Practices
Graveled construction entrance required
Inspection required prior to construction.
~ ~
1
FOOTINGS -see also structural design detail on Sheet 3 of _
~ i'
plans
Setbacks
Footings
Forms
Reinforcement
Interior Footings
_
_-
UFE$.-_-__ --
-_ ~
____ _
FOUNDATION -see also structural design detail on Sheet ~/
3 of plans for 8"wall
St
W
ll ~ ~ ~ / ~
~
em
a / ,~ ,
~ ~) ;
`
Forms t - -
--
Rernforce-m.nr.-.--- ------____-___--- -__
.._ _. _
ea$`"~in Pockets
Holdowns - ABWP & per structural design
Vents -12 required
Damp-proof basement walls
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
Building PeimitN03-?b8
ASV V~~i n ~ ~~ APDAl1VL~Tmsmc
GROUNDWORK PLUMBING ,~~ - ~v ~ .-•aii a~t~ i L
_ _
Pressure Test
Pipe Joints Exposed
Pipe Bedding
SLAB
Thickened Edge per structural design detail t ?
Reinforcement ~
,
X
Insulation - R-10 under entire slab for hydronic tubing;
thermal break @ slab & footin
wh
l
th
24" b
l ~)
~
~ '
g
ere
ess
an
e
ow ~
grade /U
Hydronic Tubing
FLOOR FRAMING -structural design required for floor
diaphragm, nailing & blocking; see Sheet 3 of plans
Engineered I joist plan shall be on-site at time of inspection
Girders
Joists
Hydronic Tubing
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply ~~
Water Hammer Arrestor @ clothes and dishwasher
Gas Supply
~
Hose Bibbs - backflow protection required )
Pipe Insulation (R-3) 1r
Pressure Reduction Valve req'd. as pressure > 80 psi (87 psi) ~
Water HeaterBoiler i
18" A. F. F. ~
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground ~
Freeze protect all under-floor water pipe & DWV
~J
(;a1142f hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Permit#03-268
i
REQUIRED INSPECTIONS
APPROVED/DATF,
MECHANICAL
LPG Boiler/water heater
Hydronic in-floor heating _
' .1
Whole house ventilation
Whole house fan in utility room ~-
Window ports
Source Specific Exhaust Fans @ bathrooms {SOcfm),
kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING
Walls
Sheaz Walls -prescriptive and designed shear wall nailing ~ ' ~-
requires inspection prior to cover, nails shall not be driven
more than 1/16" into sheathing membrane
Shear Panel Blocking
Truss Framing & Blocking -engineered truss plan shall be
on-site at time of inspection
Attic Venting -ridge & eave }
Posts, Beams & Headers `
Positive Connections
Windows -escape
Windows -safety glazing ~
Window U-factor:.40 or better ~
Door U-factor•..20 or better ~
Skylight U-factor: - .58 or better
NFRC sticker must be on windows, doors & skylights at
time of inspection
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION ( ;
Slab (Thermal Break R-10/R-10 under for hydronic slab)
Walls (R-21)
~~
Ceiling (R-38)
Floor (R-30) ;_ ,
Baffles Vapor Barrier - (Paint)
DRYWALL NAILING
~ti
~
~
"
~
e
.,;/
~
z_(c
C:•.
C~:K:
Ceiling
Gara e/House Occupancy Separation
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Permit #03-268
Public Works Sign-off
LPG/LPG Fireplace
House Numbers - 5"numbers minimum
Plumbing
MechanicaUHeating
Vapor Barrier Paint Certificate
Smoke Detectors
Final -building
~'-l cl- D r~
J ~L C a7 Q
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11379-4450. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alteruate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Jefferson County Building Department is unable to pass final inspection on your
project until Public Works requirements have been completed and inspected. For Public
Works inspection ca11379-5083. A minimum of twenty-four hours notice is required.
Public Works anuroval must be received nrior to scheduling the Building Department's
final insnection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Building Permit N03-268
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
. inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Deputy City Clerk at 379-5083 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility Gne locates
1-800-424-5555
Page 5 of 5
City of Port Townsend
Building & Community Development
Waterman & Katz Building
181 Quincy Street
Port Townsend, WA 98368
(360)379-3208 Fax: (360)385-7576
CERTIFICATE OF OCCUPANCY
BLD03-268
Owner: Mary Ann Shaffer and Sally Lolcin
Address: 2710 Peary Avenue
Location: Port Townsend, WA 98368
. ~,„.
,~„~~ ~~
:__
CITY HALL
,es,
Building (or portion): Single Family Residence with Attached Garage
Use(s) permitted: R-3 (residence), U-1 (garage)
The above-referenced building or portion complies with the applicable requirements of the Port
Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used
and occupied in the use and manner indicated above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not
be removed except by the Building Official.
Approved: Suzanne Wassmer Aut>ust19, 2004
Permit Technician Date